HomeMy WebLinkAboutHARMONY VILLAGE PUD - PRELIMINARY - 65-93C - CORRESPONDENCE - Staff's Project Comments22. There are ten evergreen trees around the new Rockport cul-de-sac that appear to be
offsite. Please specify that the developer is responsible for landscaping and maintaining this
area.
23. The plans indicate that the remote parking lot has been striped for a basketball court.
Now, all we need are the baskets. Please provide basketball hoops in the appropriate locations so
that the court may indeed be used for basketball.
24. Staff anticipates working with the applicant and the consulting team on architectural
elevations of the theme restaurants as these become known. Our emphasis will be on unifying
the center with urban design elements as well as some architectural elements while allowing
individual expression (theme) on a carefully reviewed basis. Architectural theme elements will
be allowed more latitude on the interior -facing portions of the building as opposed to those
elevations that face Harmony and Timberline.
25. Please add the following note on sheet one of the Site Plan:
"Electrical transformers shall not be located along either the Harmony Road or
Timberline Road frontage unless totally screened from view from the public right-of-way by a
solid enclosure that matches the predominant building material of the closest building." For all
other locations, electrical transformers shall be screened from view from public or private streets
by a solid enclosure, landscape materials, building facades or any combination thereof."
26. For the Assisted Living facility, please provide more buffering for the 13 parking spaces
that face south into the single family homes. Buffering can be in the form of fewer spaces, more
landscaping, berming or any combination.
This concludes Staff comments at this time. Please be aware that additional comments are also
provided on redline sheets attached to this packet. As always, please feel free to call if there are
any questions or concerns regarding these comments.
Sincerely:
Ted Shepard
Senior Planner
Enc.
parking. While there are sufficient connections to offsite sidewalks, they still do not address how
a pedestrian navigates the interior of the large field of parking in front of the theatre.
So, at the risk of sounding repititious, Staff again requests that diagonal sidewalks be installed to
traverse the large field of parking on as close to a 45 degree angle as possible. (Please refer to
the illustration on from page 152 of City Comforts, by David Sucher.) As we agreed to in a
meeting with the lead consultant on August 7th, one of the prime design objectives of the center
is to mitigate the parking lot. Adding such pedestrian connections helps with this mitigation by
introducing a human scale to the parking lot and allows for better pedestrian access within the
site.
)ite
Transportation Planning has provided comments on redlined sheets two and three of the
Plan. These comments are summarized as follows:
A. Enhanced crosswalks are recommended in the locations shown on redlined Sheets two
and three of the Site Plan.
B. Please provide six foot wide bike lanes on Timberwood Drive between Timbeline Road
and the north -south spine road. These lanes should also be shown on sheet nine.
C. The "neck -down" on Delaney Drive should be shifted south to the north leg of the
Rockport intersection.
D. A bike/ped connection should be provided from the end of the future Rockport cul-de-sac
to the public sidewalk along Timberline Road.
E. The nose of the median in Harmony Road should be extended to provide for a pedestrian
refuge area.
18. Please add the following note on sheet 8 of 11 (or on any sheet that may depict the
architectural character of a bank):
"The design, shape, and color of any exterior automated teller machine shall integral with
the building and shall not feature accent colors that sharply contrast with the primary building
exterior materials."
19. Please add a note on sheet two stating that the west side of Building E is an outdoor patio
with details provided at Final.
20. Staff is concerned about screening the carwash. The height of the screen wall is not clear.
Is there a raised landscape planter behind the screen wall? On sheet eight, please state that the
east elevation of the carwash will match the east elevation of the convenience store.
21. We do not see where foundation plantings have been added to the north side of Building
A.
on Wilmington (future condition with KeenlandBattlecreek connection) will be considered
acceptable. The traffice engineers should verify this information with Eric Bracke and revise
Transportation Impact Study with a follow-up memo.
7. Traffic calming devices should be installed on Wilmington in the area of transition
between the commercial project and residential neighborhood. At this time, such devices should
be indicated to be raised crosswalks or speed humps.
8. The Site Plan should indicate the demarcation line between public and private streets.
9. The Poudre Fire Authority requests that fire lanes be designated on the Site Plan. Please
add a note to the Site Plan stating that fire lanes shall be visible by painting and signage and shall
remain unobstructed. A fire lane plan shall be submitted to Mr. Ron Gonzales for approval prior
to construction.
10. The neck -down on Delaney Street needs to accommodate bicyclists.
11. Based on previous discussions with the consulting team, the drive -through restaurants
will be converted to standard restaurants or banks. The consultants are encouraged place the
long axis of these pad buildings in parallel with the spine road so that building fronts are brought
up to the street edge and further enhance the pedestrian scale of the project. All restaurants are
strongly encouarged to feature outdoor dining or other outdoor spaces that promote the
pedestrian character along the internal spine road.
12. Staff has determined that retail uses may be added to Building H as long as retail does not
exceed 25,000 square feet. Please keep in mind, however, that the Harmony Corridor Plan limits
the gross floor area of each principal tenant to 80,000 square feet. Therefore, with Building H
containing 60,000 square feet, the amount of retail added would be limited to 20,000 square feet.
13 If Buildings I, J, and K are combined and contain more than 25,000 square feet, they will
be considered "Large Retail Establishments" and subject to the appropriate standards and
guidelines. If these buildings are to be separated, then the intervening spaces must designed as
plazas, arcades, yards, gardens, outdoor dining, or other meaningful spaces for pedestrians.
(Please see attached illustration from page 121 of City Comforts, by David Sucher.) Long,
narrow, or uninviting spaces will not be acceptable.
14. The separating of Buildings I, J, and K will require building elevations to be provided for
the new exterior walls. As with the above comment, blank walls must be avoided in order to
create attractive spaces between buildings. Corner store fronts are encouraged. Extending such
store fronts along the north and south elevations is encouraged.
15 If "pass -through" space is provided and intended to link the rear parking lot with the front
o the stores, then the ends of the pass -through should be indentified with a plaza, kiosk, clock,
or some other form of urban design that provides a strong visual connection for the pedestrian.
16. We have discussed the concept of providing diagonal sidewalks through the large
August 12, 1998
Ms. Linda Ripley
V-F Ripley and Associates
1113 Stoney Hill Drive
Fort Collins, CO 80525
Dear Linda:
Staff has reviewed the revised plans for Harmony Village Shopping Center Preliminary P.U.D.
and offers the following comments:
1. As a result of existing and proposed development in the Harmony Corridor, CDOT has
required the City to provide an increased level of design detail for the ultimate, long range cross-
section of the state highway. Accordingly, the City Engineering Department will be conducting
a baseline survey to determine the the future centerline of the roadway by which to measure
geometric improvements and right-of-way dedications. This work will be done in September.
The entire consulting team should be aware that this survey may result in slight modifications to
the future edge of pavement and, accordingly, the location of the mandatory 80 foot setback
which may cause adjustments in building envelope or parking lot placement.
2. CDOT has formally approved the 3/4 access on Harmony Road. Please be cautioned that
this access will require a revision to the "A -Line" Agreement with CDOT. Previous applications
for the A -Line revision have been lengthy and the applicant is encouraged to factor this process
into the timeline.
3. The Harmony Road Access Control Plan must be amended to document the new access
point. The City will initiate this process.
4. Harmony Road improvements west of the site will require the applicant to obtain the
necessary offsite easement(s). A letter of intent from the grantors of these easement(s) should be
provided prior to Preliminary P.U.D. consideration by the P & Z Board. The City will assist in
providing information to these parties if requested.
SO. Page five of the Transportation Impact Study refers to Wilmington Drive as a "local
street." The City, however, considers Wilmington to be a "Connector Local Street."
Consequently, the developer's extension of Wilmington Drive should be built to the
"Commercial Local Street" standard (see attached). The street should be designed so that BIKE
LANE AND PARKING LANE CONFLICT - RESOLVE.
Since Wilmington is considered a "Connector Local Street," it is expected to carry
between 1,000 and 2,500 trips per day, not limited to 1,000 trips per day as referenced on page
28 of the Transportation Impact Study. Therefore, the projection of 1,275 vehicle trips per day