Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD - PRELIMINARY - 65-93C - CORRESPONDENCE - Letter Of Intent (4)Il co ..74 ODco t.,D C -1 F -1poz co oo +m I I CC) I I c>> i I Big SO Lug ----- ----- -- 8' PVC SAK SEW B VC W. i , h ` 1 Y t 1 -I i' I -� I m 2 7' CS 85,00' 9- UTILI I Y Ike FASEMtNT 6 lol 186 10 01 5,452 SJ P i 00*2 "0.!'*[. ,sl SO 185 0 Go (P. (0 (j) 184 01 C�l 1 4 r I ct /Z'\ 183 C) I 85.00' 4848 0 187 qi It 95, 11 5 2 SF. I o I 100.00, 188 Q0j I loov's*o 100.00, 1891 LA 4.Y00 r3f I 190 .-I f AY IJI I I I Ilk - 01 AV. " V c" V 182 1 1)0.00' 181 I I 192 144. Cod I t.. % J rILITY F. ASEMEN T 19,5 cal .5,425 S.F. 1400*23'07"[ 100.01' I DS 194 C) '1.500 SJ 2 C) 100.01' C" I 193 W1 4.')00 S.1 100.00, 1:10 C: 20 TOA-67- EASEMENT 12 1.01' VVZJU/ L 15.549 LA cp < vi OD C� Un (.4 <n N (9,51 6-6-68 (BASE. OF BEARINGS) TIMBERLINE ROAD d-asaac) -j C-41 Mr. John Spillane October 21, 1998 Page 2 If you have any questions or comments, or need additional information, please do not hesitate to contact me at (970) 491-9888. Thank you. Sincerely, JR Engineering, Ltd.. . David W. Klockeman, P.E. Project Manager cc: Ty Fangman, Dial Companies Linda Ripley, VF Ripley Associates, Inc. Ted Shepard, City of Fort Collins Current Planning Attachments JR Engineering, Lt%__ 2620 East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 • FAX (970) 491-9984. www.jreng.com October 21, 1998 Mr. John Spillane Deutsch, Spillane and Reutzel 9145 E. Kenyon Avenue Suite 202 Denver, Colorado 80237 % d sh-;�cAP OCT 2 9 RECT Re: Harmony Crossing P.U.D., Fort Collins — Expansion of Area at Northwest Corner of Rockport and Timberline for Detention Pond Dear Mr. Spillane: As we discussed on the telephone earlier this week, JR Engineering, Ltd. has been retained by the Dial Companies in order to complete engineering plans for the development of the commercial site north of Harmony Crossing P.U.D. known has Harmony Village. As part of the development of Harmony Village, the future detention pond shown schematically on the approved plans for Harmony Crossing P.U.D. north of Rockport Court will now need to be constructed. This area lies within an existing drainage, utility and access easement delineated as Tract B and dedicated on the Final Plat for Harmony Crossing P.U.D. The work required for this pond will consist of re -grading and re -landscaping the portion -of said Tract B north of Rockport Court to be connected to the remainder of the proposed detention pond on the Harmony Village site. The proposed detention pond will utilize the. existing storm sewer pipe that runs under Rockport Court for the outfall-into the downstream system.. This system is shown on the approved utility plans and described within the approved drainage report for Harmony Crossing P.U.D. (A copy of the section of the approved Final Plat and the approved Final Utility Plan for Harmony Crossing as well as the proposed grading plan for Harmony Village are attached for your reference.) At this time, the Harmony Village P.U.D. project. is proposed to go to the City of Fort Collins Planning and Zoning Board for Preliminary approval at the end of November. As part of this process, the City has requested that we secure a "Letter of Intent" from the representatives for Harmony Crossing P.U.D. for the above referenced work (re -grading and re -landscaping a portion of Tract B) to be completed as it lies, within an existing easement that is currently being maintained by others. 4935 North 30th Street 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West Colorado Springs, Colorado 80919 Englewood, Colorado 80111 - Pueblo, Colorado 81008 (719) 593-2593 • FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119