Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD - PRELIMINARY - 65-93C - CORRESPONDENCE - Letter Of Intent (3)Mr. Jim Brach October 28, 1998 Page.2 Sincerely, JR Engineering, Ltd. David W. Klockeman, P.E. Project Manager cc: Ty Fangman, Dial Companies Linda Ripley, VF Ripley Associates, Inc. Ted Shepard, City of Fort Collins Current Planning �l I ` JR2620Engineering, Lt East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 . (970) 491-9888 • FAX (970) 491-9984 www.jreng.corn October 28, 1998 ra OCT 2 9 REC'D Mr. Jim Brach ABB Flexible Automation 4600 Innovation Drive Fort Collins, Colorado 80525 Re: Harmony Crossing P.U.D., Fort _Collins — Connection of Proposed Sidewalk Extension into Sidewalk Along North Portion of ABB Site Dear Mr. Brach: As we discussed on the telephone this morning, JR Engineering, Ltd. has been retained to complete engineering plans for the development of the commercial site at the southwest corner of Timberline and Harmony known has Harmony Village PUD. As part of the development of Harmony Village, a new sidewalk will be constructed along Harmony Road from Timberline Road across the Harmony Village and warehouse sites to connect into the existing'sidewalk on the ABB site. This ..area lies within an existing easement for utilities, sidewalks, storm drainage and landscaping as dedicated on the Final Plat for Oakridge Business Park 14a' Filing. The work required for this sidewalk connection will be the relocation of the easterly portion of the sidewalk on the ABB Site around the north side of the existing power pole to allow the sidewalk crossing at the railroad tracks to meet the requirements of the Public Utilities Commission. At this time, the Harmony Village PUD project is proposed to go to the City of Fort Collins Planning and Zoning Board for Preliminary approval at the end of November. As part of this process, the City has requested that we secure a "Letter of Intent" from the representatives for ABB for the above .referenced work (sidewalk extension including relocating a portion of existing sidewalk) to be completed as it lies outside of our site. Unfortunately, we are under some constraints by the City to get this letter by the. end of this week. Please call me when it is completed and I will have it picked up at your office. Your prompt attention of this matter is greatly appreciated. If you have any questions or comments, or need additional information, please do not hesitate to contact me at (970) 491- 9888. Thank you. 4935 North 30th Street. 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West Colorado Springs, Colorado 80919 Englewood, Colorado 80111 Pueblo, Colorado 81008 (719) 593-2593 FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119