Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD - PRELIMINARY - 65-93C - CORRESPONDENCE - Letter Of Intent (2)1 r> r W. Gary Glick November 2, 1998 'Page 2 Your prompt .attention of this matter is, greatly appreciated.If you have any questions or m coments, orneed additional information, please do not hesitate. to contact me at. (970) 491- 9888... Thank you., Sincerely, JR Engineering, Ltd. c David W. Klockeman, P.E. Project Manager Accepted by: GLICK Enterprises cc: Ty Fangman, Dial Companies Linda Ripley, VF Ripley Associates, Inc. . Ted Shepard, City of Fort Collins Current Planning t JREngineering, Lt 2620 East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 • FAX (970) 491-9984 www.)reng.com November 2;1998 NOU `13 Mr; Gary Glick Glick Enterprises 1833 East Harmony Road Fort -Collins, Colorado_80525 Re: Harmony Village PUD, Fort Collins,— Proposed. Joint Access from Harmony Road and Sidewalk Extension — Letter of Intent Dear Gary: As we have discussed, JR Engineering, Ltd. (JR) has' been retained to complete engineering plans for the development of the commercial site at the southwest corner of Timberline and Harmony known has Harmony Village PUD. As part of the development of Harmony Village PUD, a joint access for the new development and the existing warehouse property will be constructing eliminating the two access points that currently exist across your property. In addition; anew sidewalk will be constructed along Harmony Road from the existing sidewalk on the,ABB site to Timberline Road, including the section across your property. As part of the development of the final plans for this site, our client, the Dial Companies, and JR will continue to coordinate with you on issues including the following: The proposed joint access, including allowing for tractor -trailers to access your site from Harmony Road (both east bound and west bound); providing for the proper connections to your parking lot from Harmony Village, PUD; providing for connections of your existing private sewer system into the public system to be located on' Harmony Village, PUD; and keeping. the new sidewalk within the existing 45 foot water easement along Harmony Road. At this time, the Harmony Village PUD project is proposed to go to the City of Fort Collins Planning and Zoning. Board for Preliminary approval at the end of November. As part of this process, the City has requested that we secure a "Letter of. Intent' from the representatives of the warehouse property for the above referenced work to be completed as it lies outside of our site. In order to streamline this process, please sign this letter below if you agree with the content so we can forward it to the -City as part of our project package. Please be assured that this Letter of Intent means only that you intend to grant easements to the Dial Company for the above mentioned items. Formal easement documents (legal descriptions and exhibits) will be provided for your review and signature as the information becomes more finalized. 4935 North 30th Street 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West Colorado Springs, Colorado 80919 Englewood, Colorado 80111 Pueblo, Colorado 81008 (719) 593-2593 • FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119,