HomeMy WebLinkAboutHARMONY CROSSING PUD - PRELIMINARY - 65 93A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSS. Olt Harmony Crossing Page 2 14. This has been corrected. 15. A note has been added to the Landscape Plan. 16. The recreation facilities shown in the detention pond will be coordinated with Storm Drainage to not impede flows and storage. Maintenance will be by the Home Owners Association and therefore will be private. 17. O.K. 18. O.K. 19. The multi -family parcel will be included as a future phase of Harmony Crossing development. A line has been added to the plans to indicate Phase 4. 20. O.K. 21. The lots along the railroad are an average of 130' deep with the buildings toward the front of the lot, an adequate buffer can be achieved using both fencing and landscaping within the lot. 22. The percentage and number of solar lots is indicated on the site plan. A solar symbol can be found on each lot with solar orientation. 23. A legal description will be submitted separately. 24. This information has been added to the Land Use Breakdown. 25. O.K., Matt Delich is checking with Transportation for their requirements. 26. O.K., RBD is addressing these issues on their plans. 27. The density on the multi -family parcel has been changed to 6-12 du/ac. Please let us know if you have any further issues regarding this project. Best Regards, Cathy Maths Cathy Mathis VAUGHT*FRYE ARCHITECTS, P.C. - NAUGHT FRYE architects October 28, 1993 Steve Olt Planning Department City of Fort Collins 281 N. College Ave. Fort Collins, CO 80522 RE: Harmony Crossing P.U.D., Preliminary Dear Steve, In reference to your October 15, 1993 staff comments, we offer the following responses: 1. RBD is coordinating with Columbine Cable regarding required easement sizes and locations. 2. RBD is adding the utility easements to the plat. 3. U.S. West comments will be incorporated into final plans. 4. 0. K. 5. All streets will comply with the 660' requirement within each phase or temporary connections will be constructed. 6. 0. K. 7. Based on our meeting on October 26th, we discussed the bike connection to Oak Ridge Business Park is most appropriately located at the future extension of Keenland Drive. We are providing a future connection through Dusbabek Property that will connect vehicle, pedestrian and bikes to the Keenland Drive extension. 8. O.K. 9. As per our meeting with Rick Ensdorf no collector street is required through this property. 10. The lines of Phase 1 and 2 at Lots 1 and 2 have been changed. 11. 0. K. 12. Site distance easements have been added to the plans at two locations. 13. The note has been changed to a 35' max. building height. land planning • architecture 1113 Slonev Hill Drive • Fort Collins, Colorado 80525 • 303-224-1191 • FAX 303-224-1662