Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD REPLAT NO 1 - 65-93E - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related DocumentApril 27, 2000 Mr. Basil Harridan City of Fort Collins Stormwater Department 700 Wood Street P.O. Box 580 Fort Collins, Colorado 80522 Re: Harmony Village PUD, Replat No. 1— Drainage Dear Basil: J R ENGINEERING A :iuYisuliuy atl Wustrrw As part of the Replat No. 1 of Harmony Village PUD, changes are proposed to Lots 11 and 12 as they are being revised to consist of 3 lots (Lots 11A, 1113 and 12A). The resulting impact of this change on the overall drainage is that the building square footage is being reduced and some minor revisions to the parking area are being added. However, the originally proposed drainage patterns are being maintained. Therefore, it is our opinion that the changes fall within the originally approved drainage plan and report for this site and further study is not warranted. We hope that this letter will allow the project to proceed without delay. Your cooperation in this matter is greatly appreciated. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, A Engineering c LAJ- b David W. Klockeman, PE Senior Project Manager r,p00 RE$s- KLO�'-. 9�o ��SS�ONAL ENG\� Cc: Ted Shepard, City of Fort Collins Steve Toth, Dial Company 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 970491-9888 • Fax: 970-491-9984 • w .jren&mring.wm