Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD ODP - 65 93 - SUBMITTAL DOCUMENTS - ROUND 8 - Planning ObjectivesThe second land use, a 4 acre neighborhood convenience center, is also supported by the Policies Plan. This convenience center is located at the corner of a future signalized intersection formed by Timberline Road and the main access road into the community/regional shopping center, as encouraged by Policy 66. Moreover, the convenience center is in easy walking and bicycle distance from the residential areas within Harmony Village and the emerging residential nighborhoods. As intended in the LDGS, this convenience center will serve the consumer demands of adjacent residential neighborhoods and reduce the use of the automobile and traffic congestion. Additionally, its proximity to the community/regional shopping center will also serve the consumer demands of this adjoining, future employment center. Third, the 38 acre higher -density, detached single-family area is consistent with Policy 3d which encourages the location of residential development which is close to employment, recreation, and shopping facilities. Harmony Road is emerging as the major, corporate commercial corridor in Fort Collins. A future neighborhood park contiguous to the new Fort Collins Junior High School and elementary school site is only one-half mile east and within walking distance as encouraged by Policies 79c and 79d. Conveniently - located shopping will be a future component of Harmony Village, but shopping opportunities already exist west on Harmony Road and along S. College Avenue consistent with Policy 79a. As stated, the Harmony Trunk Sewer is located only 800 ft. south, and the water utility is both at the Harmony/Timberline intersection and directly west of the railroad tracks. The fourth land use in this mixed -use project is 7 acres of multi -family. This area serves as a buffer/transition between the future community/regional shopping center and existing warehouse to the north and the single-family area of Harmony Village. Such transitional land uses are encouraged through Policy 74. The provision of this multi -family area in itself constitutes a mix of housing densities within the project and, therefore, is consistent with Policy 75. in summary, the four integrated and complementary land uses in the Harmony Village O.D.P. constitute a mixed -use development, one which is accessible to City utilities and close -in to shopping, employment, schools and recreation and which together provide for logical development phasing within the U.G.A. These 74 acres are free of wetlands, animal habitats, floodplains or flood fringes and, moreover, physically separated by the railroad tracks and approximate to vacant land so as not to arouse direct neighborhood concern. Finally,.the Harmony Village O.D.P., in conjunction with concurrent land planning on the east side of Timberline Road, provides an exceptional opportunity for coordinated private/public planning and improvements in this emerging portion of the Urban Growth Area. 3 The logic for development of this 74 acre property is evident in the City's Land Use Policies Plan. Through the installation of the Harmony Trunk Sewer running east -west approximately 800 ft. south of Harmony Village, the sewer infrastructure is already in place. In fact the sewer will have to be extended north in the direction of Harmony Road to serve this property, not south and deeper into the limits of the Urban Growth Area. This sewer extension conforms to the priority of phased utility expansion as cited in Policy 24. Additionally, Policies 28 and 29 call specifically for development phasing within the U.G.A. The following considerations speak to this appropriate phasing: Harmony.Village's close proximity to the Harmony Road employment/ shopping corridor, the commitment by Poudre Valley Hospital to its new campus directly east of the property, the construction of the new Fort Collins Junior High School one-half mile east along with an elementary school site and future neighborhood park, contiguity to existing commercial/residential development directly west, and many other locational aspects of Harmony Village. It seems apparent that the development of this property constitutes appropriate development phasing within the U.G.A. Each proposed land use within Harmony Village derives support from the Policies Plan. First, the 23 acre community/regional shopping center at the corner of Harmony Road and Timberline Road is an off -South College Avenue location, thereby serving to help relieve future traffic congestion on South College as encouraged by Policy 22. Moreover, the proposed shopping center lies at the intersection of two major arterials having ample existing and planned traffic capacity. Primary access into the center is from a signalized roadway intersecting with Timberline Road and extending as a collector street east into the Poudre Valley Hospital property and south alongside the Neighborhood Convenience Center and through the multi -family and siugle- family areas of the project. The shopping center area is contiguous along its entire west border to the existing warehouse, consistent with Policy 22. The community/regional shopping center and convenience center are juxtaposed to allow direct vehicular and pedestrian access between them. Of course, there is direct pedestrian, vehicular and bicycle access between the residential areas of Harmony Village and the shopping center as encouraged by Policies 49 and 69. The Harmony/Timberline intersection is a designated, future transit route location which would comply with Policies 70 and 72. The community/regional shopping center is in close proximity to existing and extensive, future residential development, employment and schools, and affords easy community/ regional access from Timberline Road, Harmony Road and State Interstate 25. Certainly the availability of public utilities to this intersection makes this center location consistent with Policy 73. Planning for this shopping center in advance of the inevitable, residential development along Timberline Road south of Harmony Road and the general environs is farsighted and informative to evolving neighborhoods. 2 HARMONY VILLAGE OVERALL DEVELOPMENT PLAN PLANNING OBJECTIVES (September, 1993) Harmony Village is a 74 acre Planned Unit Development proposal, located at the southwest corner of Harmony Road and Timberline Road, within the Urban Growth Area, and zoned EP Employment Park. The initial development proposal within Harmony Village is Harmony Crossing, consisting of 47 acres of various residential uses by Richland Homes, Inc. and located at the south end of the O.D.P. This mixed -use O.D.P. is bounded along the north half of its west boundary by an existing warehouse and the balance of the west boundary by the Union Pacific Railroad tracks. The property's east boundary is Timberline Road and its north boundary is Harmony Road. The 35 acre Dusbabek Property is directly to the south and undeveloped as are the Poudre Valley Hospital Property and the Everitt Companies Property directly to the east. The EP zoning district provides for a variety of activities including industrial uses, research and development activities, offices, shopping centers and residential dwellings. Harmony Village seizes the opportunities for mixed uses and proposes an integrated composition of land uses, featuring a 23 acre community/regional shopping center, a 4 acre neighborhood convenience center, 38 acres of higher density single-family uses, and 7 acres of multi -family development. These complementary land uses are configured to front higher intensity commercial uses toward Harmony Road with the main access from a roadway connecting to Timberline Road. The site design also positions the neighborhood convenience center for shared access with corner commercial uses and easy accessibility to residential uses both within and approximate to Harmony Village. Additionally, the site plan utilizes the multi -family area as a buffer between corner commercial uses and the higher density, detached single-family areas. Strategically -positioned detention areas also provide open space visual relief from Timberline Road, transition buffering between land uses and the potential for recreation uses. The context for the design of Harmony Village has included coordination with property owners on the east side of Timberline Road, including Poudre Valley Hospital, the Everitt Companies, and Geneva Homes. As a cooperative group, these owners and Imago Enterprises, owner of the subject 74 acre Harmony Village Property, have met extensively with City staff to discuss private/ public sector coordination in the improvement of Timberline Road to City arterial standards and the extension of sewer and water utilities to these properties. A June 15, 1993 letter from city engineer Matt J. Baker speaks to the excellent progress made toward a uniform, comprehensive private/ public initiative to improve Timberline Road consistent with the City's master street plan. 1