Loading...
HomeMy WebLinkAboutWINDTRAIL TOWNHOMES PUD FIRST REPLAT MINOR SUBDIVISION - 66 93F - CORRESPONDENCE - STAFF'S PROJECT COMMENTS1 9. The Public Service Company reminds the developer that utility easements adjacent to all rights -of -way need to be such that from the back of sidewalk to the rear line of the utility easement is a minimum of 13 feet. 10. Please add a note that explains that the purpose of the replat is to change the location of a drainage easement and to modify the dimensions and lot areas of Lots 1 - 81 21, 22, 28, 29, and 30. This concludes Staff comments at this time. The administrative hearing is scheduled for Tuesday, May 23, 1995 at 1:30 p.m. in the Planning Department conference room, 281 North College Avenue. It is preferred that all above changes be made prior to this hearing. A corrected mylar should be brought to this meeting with owner, notary, surveyor, and attorney's signatures. (No ball point pens please.) If the Planning Director approves the Minor Subdivision, then he will sign the mylar at the hearing. The plat will then be recorded after the two week appeal period. If you have any questions, please feel free to call our office. sincerely: Ted Shepard Senior Planner Cornrr " ity Planning and Environment. 'ervices Current manning City of Fort Collins May 17, 1995 Mr. Mike Reeve TST, Inc. 748 Whalers Way, Building D Fort Collins, CO 80525 Dear Mike: Staff has reviewed the request for Windtrail Townhomes P.U.D., First Replat, Minor Subdivision. The following comments are offered: 1. The name in the legal description does not match the name of the Plat. 2. There are notes on the Plat that address vacations that are shown on the original plat. Since the Replat itself will take precedence, these notes should be deleted. 3. The Plat calls out Tracts A and C. Is there a Tract B? If so, please indicate. If not, please add a note stating there is no Tract B. 4. The ties to the west end of the easement across Tract "C" need more distances to be able to use the ties. 5. This same easement should be in a darker tone. As shown, it appears very light. 6. In the lower right corner of both sheets, please change the name of the plat to match the new name. 7. The language describing the 1120' wide bike and pedestrian access and maintenance easement..." is incorrect, as is the reference to the Book number. The proper language should be: 1120' open space, bike and pedestrian trails, and storm drainage and maintenance easement..." This easement is recorded in Book 2218, not 2018. 8. Please provide additional information to Roger Buffington of the Water and Wastewater Department regarding the location of the sanitary sewer with respect to the corner of Lot 22 and the Plat boundary. Changes in Lot'22 appear to encroach on the typical easement requirement. 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002