Concept Site -Pmomlansms
a SCAL � -000
.. - • _ 9-03 2014
3. Parking lots in the River Downtown Redevelopment (R-D-R) District are subject to review and approval by
the Planning and Zoning Board (Type 2). A neighborhood meeting is required two weeks prior to submittal.
Please contact me to schedule the meeting. A notice will be mailed to affected property owers two weeks
prior to the neighborhood meeting.
4. Currently, the park has a lot of seemingly homeless people gathering for long periods of time. Do you
expect this population will continue to gather in the parking lot? If so, what is your plan to manage loitering?
5. The parking lot permiter and interior shall be landscaped according to LUC Sec. 3.2. 1 (E)(4-5). Please
provide calculations accordingly.
6. The RDR design standards require planters to screen parking along Jefferson Street (Sec. 4.17(D)(2)(d).
Low walls made of native materials with historic characteristics, such as brick, stone, architectural cast stone
etc... (as noted in 4.17(D)(3)(c)(4)) with intermittent plantings would be appropriate. More details can be
found in the RDR Design Guidelines.
7. The Linden Street streetscape will need to be consistent with the improved design in the area.
8. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public
hearing. The applicant for this development request is required to hold a neighborhood information meeting
prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from
your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact
me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be
present to facilitate the meeting.
9. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
10. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http://www.colocode.com/ftcollins/landuse/begin,htm.
11. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the
LUC for more information on criteria to apply for a Modification of Standard.
12. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
13. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
14. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
15. Save the Poudre has requested to be contacted whenever a project is proposed within 800' of the Poudre
River. Please add the following address to your APO labels: Save the Poudre, c/o Gary Wockner, PO Box
20, Fort Collins, CO 80522-0020.
Page 5 of 5
Department: Engineering Development Review
Contact: Sheri Langenberger, 970.221-6573, slannenberger(d)fc4ov.com
1. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.com/engineerng/dev-review.php
2. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs
and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or
restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
3. Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
hftp://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
4. This project is responsible for dedicating any right-of-way and easements that are necessary for this project.
The sidewalk along Jefferson is not within the right-of-way — either right-of-way for this sidewalk or an access
easement will be needed.
5. Utility plans will be required and a Development Agreement will be recorded once the project is finalized.
6. This site is adjacent to CDOT roadway and all access to the site is governed by an access control plan.
The access control plan will need to be followed and implemented with any project. Plans will be routed to
CDOT for review and approval and the applicant may need to obtain access permits from CDOT.
7. A Development Construction Permit (DCP) may need to be obtained prior to starting any work on the site.
8. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design.
The parking stalls closest to Jefferson in the existing lot will need to be eliminated to meet parking setback
requirements and safety needs. The ones on the east side can be turned and retained.
9. Drainage from the parking lot cannot drain out the driveways into the street. CDOT will not allow any
drainage other than historical to go into Jefferson. If flows are directed out to Linden it will need to be
through a sidewalk chase.
Department: Electric Engineering
Contact: Jim Spaulding, 970.416.2772, ispaulding(afcgov.com
1. Normal development charges will apply.
2. Power for lighting will be supplied from existing streetlights lining NE Jefferson St.
Any questions, please call Light & Power Engineering at 221-6700.
Planning Services
Contact: Seth Lorson, 970.224-6189, slorson(a.fcaov.com
The Larimer County Assessor shows this parcel as part of the railroad property. Therefore, the development
proposal requires a plat.
2. Who will this parking lot serve? Public?
Page 4 of 5
stormwater-criteria). Extended detention is the usual method selected for water quality treatment; however
the use of any of the BMPs is encouraged.
4. Low Impact Development (LID) requirements are required when the impervious area is increased or a site is
required to be brought into compliance with the Land Use Code. These require a higher degree of water
quality treatment for 50% of the new impervious area and 25% of new paved areas must be pervious.
Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information. There is also more
information on the EPA web site at: hftp://water.epa.gov/polwaste/green/bbfs.cfm?
goback=.gde_4605732_member_21939299. LID design information can be found on the City's web site at:
hftp://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/
stormwater-criteria.
5. The city wide Stormwater development fee (PIF) is $7,8171acre ($0.1795 sq.-ft.) for new impervious area
over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing
impervious area. These fees are to be paid at the time each building permit is issued. Information on fees
can be found on the City's web site at
hftp://www.fogov.comlutilitieslbusinesslbuilders-and-develo.pers/plant-investment-development-fees or
contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required
before the Development Construction permit is issued. The amount of the escrow is determined by the
design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in
accordance with the Fort Collins Stormwater Manual.
6. The design of this site must conform to the drainage basin design of the Cache la Poudre River Master
Drainageway Plan, the Downtown River District Final Design Report and construction plans as well the Fort
Collins Stormwater Manual.
Department: Fire Authority
Contact: Jim Lynxwiler, 970-416.2869, ilynxwilercDpoudre-fire.org
1. No PFA comments pertinent to conceptual review.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex(a.fcgov.com
1. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4)
protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having
DBH (Diameter at Breast Height) of six inches or more. As several of the trees within this site may have a
DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester
(221 6361) to determine the status of the existing trees and any mitigation requirements that could result from
the proposed development.
2. An Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a
known natural habitat (Poudre River). However, as there are several intervening parcels between the river
and this property, and the standard buffer would not extend to this project's parcel, the ECS is waived for
this site. However, please consider the use of native plants and grasses to compliment the natural feature,
in accordance with Article 3.2.1 (E)(2)(3) of the Land Use Code.
Page 3 of 5
I
1. Existing water mains and sanitary sewers in this area include a 16-inch water main in Jefferson, an 8-inch
water main in Linden and 6-inch sewers in Linden and the east 100+ feet of Jefferson.
2. There is an existing 1'X-inch irrigation service to the site extending from the main in Jefferson.
3. The water conservation standards for landscape and irrigation will apply. Information on these requirements
can be found at: http://www.fcgov.com/standards
4. If additional water or wastewater service is needed, development fees and water rights will be due at
building permit.
Department: Traffic Operations
Contact: Martina Wilkinson, 970.221-6887, mwilkinson@fcgov.com
1. What type of parking will occur in this lot? Is there a nearby land use that will utilize the lot? Is this daily
(employee) or hourly (business patrons) parking? More information is needed to determine the amount of
traffic to anticipate at the accesses.
2. TRANSPORTATION PLANNING notes that isn't consistent with the adopted Jefferson Street Plan, and in fact
that the property is owned by the Railroad.- Is this proposal from the railroad?
Department: Stormwater Engineering
Contact: Shane Boyle, 970.221.6339, sbovle(&fcgov.com
1. It is important to document the existing impervious area since drainage requirements and fees are based on
new impervious area. An exhibit showing the existing and proposed impervious areas with a table
summarizing the areas is required prior to the time fees are calculated for each building permit.
2. A drainage report, erosion control report, and construction plans are required and they must be prepared by
a Professional Engineer registered in Colorado. The drainage report must address the four -step process
for selecting structural BMPs. Standard operating procedures (SOPs) for all onsite drainage facilities need
to be prepared by the drainage engineer and there is a final site inspection required when the project is
complete and the maintenance is handed over to an HOA or another maintenance organization. The
erosion control report requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3,
Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this section, please contact
the Erosion Control Inspector, Jesse Schlam at 224-6015 or jschlam@fcgov.com.
3. The runoff from this site flows to two different basins, as shown in the attached Exhibit B. It will be required
that the design of the parking area stay consistent with the approximate drainage areas shown. The area of
the site shown in brown (the approximate northeast half of the site) can be released at the northeastern
corner of the site with no extended water quality detention or volume detention but must meet LID standards
as described below. Since the ultimate outfall for the remainder of the site shown in green (the approximate
southwestern half of the site) has not been constructed yet, this area of the site will need to provide onsite
extended water quality detention as well as volume detention and can release into the existing storm sewer
at the southern corner of the site (intersection of Jefferson and Linden). Onsite detention is required for the
runoff volume difference between the 100 year developed inflow rate and the 2 year historic release rate.
This portion of the site will also need to meet LID standards as described below. Standard water quality
treatment is described in the Fort Collins Stormwater Manual, Volume 3 - Best Management Practices
(BMPs).
(http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/
Page 2 of 5
Fort Collins
.
October 14, 2014
Brent Cooper
Ripley Design, Inc.
401 W Mountain Ave.
# 100
Fort Collins, CO 80521
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221,6760
970.224,6134 - fax
fcgov.com
Re: Jefferson Street Parking Lot
Description of project: This is a request to construct a parking lot at the northeast corner of Jefferson and Linden
(parcel #9712207822). The proposed location is the current site of Jefferson Street Park. The access point will
remain as is on Linden Street and will share access with an existing lot southeast of the Rodizio Grill on Jefferson.
The site is located in the River Downtown Redevelopment (RDR) zone district. This project will be subject to
Planning & Zoning Board (Type II) review.
Please see the following summary of comments regarding the project request referenced above. The comments
offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the
project application. Modifications and additions to these comments may be made at the time of formal review of this
project. If you have any questions regarding these comments or the next steps in the review process, you may
contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189
or slorson@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Ali van Deutekom, 970.416.2743, avandeutekom(a.fcpov.com
1. LUC 3.2.1 A landscape plan is required which includes but is not limited to street trees (see section for
further details)
2. LUC 3.2.1(E)(4) Parking lot perimeter landscaping is required (these areas are not part of the interior
landscaping).
3. LUC 3.2.1(E)(5) A minimum of 6% of the interior space of all parking lots is required to be landscaped.
Please show the calculations on how this is being met.
4. LUC 3.2.4 A lighting plan is required that includes a photometric site plan and catalog cut -sheets.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221.6854, rbuffingtoriMcgov.com