HomeMy WebLinkAbout2008 TURNBERRY RD WTF JAN 18 2018 P & Z BOARD HEARING - PDP160018 - REPORTS - RECOMMENDATION/REPORTLong Pond Wireless Telecommunications Facility
Addition of Permitted Use
Zoning & Vicinity Map
Staff Report — Long Pond Wireiess Telecommunications Facility — PDP160u18
Planning & Zoning Board Hearing 01-18-2018
Page 6
3. Long Pond Wireless Telecommunications Facility Planning Document Set
(including site plan and elevations)
4. Reports from Center for Municipal Solutions
5. Minutes from the December 19, 2017 City Council regular meeting
Staff Report — Long Pond Wireless Telecommunications Facility — PDP160018
Planning & Zoning Board Hearing 01-18-2018
Page 5
approval that the silo be no more than 45 feet in height. This design
complies with this standard.
3. Compliance with Article 4 of the Land Use Code — Division 4.5, Low Density
Mixed -Use Neighborhood (LMN)
The project complies with all applicable Article 4 standards as follows:
A. Section 4.5(B)(1) — Permitted Uses
The proposed use, wireless telecommunications facility, is not permitted in
the LMN zone. For this application to be approved, the applicant must
satisfy the criteria outlined in Section 1.3.4(C)(1) of the Land Use Code.
City Council approved this use on January 2, 2018 on this parcel.
5. Findings of Fact/Conclusion:
In evaluating the request for proposed Long Pond Wireless Telecommunications
Facility Project Development Plan, Staff makes the following findings of fact:
A. The Project Development Plan complies with the process located in Division 2.2
— Common Development Review Procedures for Development Applications of
Article 2 — Administration.
B. The Project Development Plan complies with relevant standards of Article 3 —
General Development Standards.
C. The Project Development Plan complies with relevant standards located in
Division 4.5, Low Density Mixed -Use Neighborhood (LMN) of Article 4 — Districts.
RECOMMENDATION:
Staff recommends approval of the Long Pond Wireless Telecommunications Facility,
PDP 160018.
ATTACHMENTS:
1. Zoning & Site Vicinity Map
2. Long Pond Wireless Telecommunications Facility Project Narrative
Staff Report — Long Pond Wireless Telecommunications Facility — PDP160018
Planning & Zoning Board Hearing 01-18-2018
Page 4
form, scale, mass, color, texture and character. Such facilities shall also
be compatible with the surrounding natural environment considering land
forms, topography, and other natural features. If such facility is an
accessory use to an existing use, the facility shall be constructed out of
materials that are equal to or better than the materials of the principal use.
As discussed previously in this staff report, the proposed silo is consistent
with the agricultural character of the site and its surroundings. The
proposed material, fiberglass, is equal to or better than the materials used
on the house and outbuildings located on the development site.
D. Section 3.8.13(C)(5) — Fencing
Fencing material shall consist of wood, masonry, stucco or other
acceptable materials and be opaque. Fencing shall not exceed six feet in
height. The proposed fence is made of wood and will not exceed six feet
in height in accordance with this standard.
E. Section 3.8.13(C)(8) — Color
Wireless telecommunication facilities shall be painted to match as closely
as possible the color and texture of the wall, building or surrounding built
environment. Muted colors, earth tones and subdued colors shall be used.
The proposed color will be a muted green to fit in with the surrounding
neighborhoods and agricultural uses in accordance with this standard.
F. Section 3.8.13(C)(11) — Access Roadways
The proposed access roadways meet the requirements for emergency
access per Section 3.6.6, satisfying this standard.
G. Section 3.8.13(C)(15) — Stealth Technology
Applicants must use stealth technology to the extent reasonably feasible
to minimize the visual impact of the facility. Silos are included in the list of
permissible structures per this section so long as the structure has a
contextual relationship with the adjacent area. Given the agricultural
heritage of northeast Fort Collins, a silo generally provides this contextual
relationship. City Council approved the APU application with a condition of
Staff Report — Long Pond Wireless Telecommunications Facility — PDP160018
Planning & Zoning Board Hearing 01-18-2018
Page 3
The surrounding zoning and land uses are as follows:
Direction
Zone District
Existing Land Uses
North
LMDensity Mixed -Use Neighborhood
Single-family detached residential
South
w Density Mixed -Use Neighborhood
Single-family detached residential
L
East
Low Density Mixed -Use Neighborhood
Vacant
LMN
West
County Residential (R)
I Single-family detached residential
2. Compliance with Article 3 of the Land Use Code — General Development
Standards:
The project complies with all applicable General Development Standards as
follows:
A. Section 3.6.6 — Emergency Access
The applicant proposes a 20-foot-wide gravel path in an emergency
access easement with a turnaround to provide emergency access to the
tower. This path will allow emergency vehicles to access the site and
provide fire and emergency services pursuant to Chapter 9 of the City
Code.
B. Section 3.8.13(C)(1) — Setbacks
Facilities must be setback from the property one foot for every one foot in
the facility's height. The applicant may also demonstrate the facility is
designed to collapse rather than topple to meet this requirement. The
proposed facility is 121 feet away from the nearest property line, which
meets this requirement. If the conditions of approval for 1.3.4(C)(1)(c) are
approved, staff recommends a condition of approval that requires the new
location of the facility to also satisfy this requirement.
C. Section 3.8.13(C)(2) — Wireless Telecommunications Facilities
Whether manned or unmanned, wireless telecommunication facilities shall
be consistent with the architectural style of the surrounding architectural
environment (planned or existing) considering exterior materials, roof
Staff Report — Long Pond Wireless Telecommunications Facility — PDP160o18
Planning & Zoning Board Hearing 01-18-2018
Page 2
• The Project Development Plan complies with the process located in Division 2.2
— Common Development Review Procedures for Development Applications of
Article 2 — Administration.
• The Project Development Plan complies with relevant standards of Article 3 —
General Development Standards.
• The Project Development Plan complies with relevant standards located in
Division 4.5, Low Density Mixed -Use Neighborhood (LMN) of Article 4 — Districts.
COMMENTS:
1. Background
The property was annexed into the City as part of the Country Club East Annexation on
September 6, 1983. In 1989, the property owner subdivided the property to create the
existing lot pattern that exists today. The site has been used as a farm property and
contains buildings dating from 1900 to 1950.
This Project Development Plan application required an Addition of Permitted Use (APU)
since wireless telecommunications facilities are not an allowed use in the LMN zone
district. The APU application went before City Council initially on October 17, 2017. City
Council continued the hearing until December 19, 2017 to allow for the City to contract
with a consultant to analyze the application for compliance with the Federal
Telecommunications Act of 1996. The consultant's analysis is attached to this staff
report. On January 16, 2018, City Council approved on second reading the Addition of
Permitted Use with the following conditions:
1. The height of the facility shall not exceed 45' in height.
2. The location of the tower shall be moved further north on the property in closer
proximity to the outbuildings on the site.
3. The tower shall be removed if it becomes functionally obsolete or out of use for
more than 180 consecutive days.
4. The tower shall meet the wind loading requirements in Section 5-27(70) of the
Municipal Code.
5. Upon re -development of the parcel located at 2008 Turnberry Rd., the applicant
must alter the exterior appearance of the wireless telecommunications facility to
be more residential in character. This change to the wireless telecommunications
facility shall be processed in conjunction with a Project Development Plan
submittal for 2008 Turnberry Rd.
Prior to City Council's consideration, the Planning and Zoning Board reviewed and
evaluated a previous version and recommended denial of the Addition of Permitted Use.
City of
F6rt Collins
MEETING DATE
STAFF
Jan. 18, 2018
Clay Frickey
PLANNING & ZONING BOARD
PROJECT: Long Pond Wireless Telecommunications Facility,
PDP160018
APPLICANT: Caleb Crossland
4450 Arapahoe Ave.
Suite 100
Boulder, CO 80303
OWNERS: Forbes Kenneth E
Jeanette L
2008 Turnberry Rd.
Fort Collins, CO 80524
PROJECT DESCRIPTION:
This is a request for a Project Development Plan to build a telecommunications tower
housed within a 2,500 sq. ft. wireless facility. This facility will house wireless
telecommunications equipment to provide wireless service to the surrounding area. No
wireless equipment is proposed at this time. The proposed tower would be -45 feet tall
and disguised as a silo. This tower and facility will be used for structural support of up to
three wireless providers. Each provider will install antennas and on -the -ground base
station equipment. The site is located in the Low Density Mixed -Use Neighborhood
(LMN) zone district and, as such, the wireless telecommunication facility use is subject
to the review and approval by the City Council. City Council approved the Addition of
Permitted Use for this project at its January 2, 2018 meeting.
RECOMMENDATION: Staff recommends approval of the Long Pond Wireless
Telecommunications Facility, PDP160018.
EXECUTIVE SUMMARY:
Staff finds the proposed Long Pond Wireless Telecommunications Facility Project
Development Plan complies with the applicable requirements of the City of Fort Collins
Land Use Code (LUC), more specifically: