HomeMy WebLinkAboutWINDTRAIL APARTMENTS PUD PRELIMINARY - 66 93D - CORRESPONDENCE - MEETING COMMUNICATIONl
Mr. John H. McCoy
page 2
Thank you for your time this morning. Once again, we felt the meeting was very productive
for all involved and look forward to working with you.
KB:jhb /
cc. Ted Shepard ✓/
Ron Baker
Lloyd McLaughlin
Steve Humana
COLORADO STATE UNIVERSITY (303) 482-2916
CSURESEARCH FOUNDATION
P.O. BOX 483
FORT COLLINS, COLORADO 80522
February 23, 1994
Mr. John H. McCoy
Prudential McElroy and
McCoy REALTORS, Inc.
3665 JFK Parkway
Fort Collins, Colorado 80525
Dear John:
We feel our meeting of this morning was very productive, and we are enthusiastic about
cooperative development of street, drainage and utility items for the benefit of both parties.
As discussed, we need to clarify the following with regard to our concurrence with your
development plans.
1. We request that the roadway connecting Site J to Gilgalad Ct. be moved to the west
approximately three lots as discussed. We would like to coordinate with you on the
specific location.
2. We request additional information to evaluate the drainage plan including:
a. The storage volume, area, and the grading plan required to provide
detention for these properties.
b. The size of the easements required to handle the developed flow from
your sites vs. easement sizes from historic flows. This should address
both the parcels currently before the City and the Site J parcel.
C. The sizing and location of drainage swales and facilities.
d. The proposal for joint maintenance of such facilities.