Loading...
HomeMy WebLinkAboutWINDTRAIL APARTMENTS PUD PRELIMINARY - 66 93D - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS14. We are requesting that proposed parallel driveway on Lots 1,2,3,4, and 5 is sufficient to legally serve as a turnaround until a street connection is made. 15. Typical screen wall detail is shown on plan. 16. The New Mercer Ditch and Centre for Advanced Technology, 5th filing have been labeled on plan. 17. Phasing Schedule has been revised. We hope that these revisions address the concerns of the development review staff. xc: John McCoy TST June 8, 1994 Ted Shepard Planning Department City of Fort Collins RE: Windtrail Apartments PUD Preliminary Revisions Dear Ted: This letter is in response to staff comments of May 24, 1994,regarding Windtrail Apartments P.U.D., Preliminary. The response numbers correspond to those of staff comments. Those not noted will be addressed by the project engineer. A 13' wide utility easement has been included adjacent to all sidewalks. 2. A 6' wide utility easement for Columbine Cablevision has been located at the back of Lots 1,2,3,4, and 5. 6. Jim Sell Design Inc had field located existing trees along Shields Street and added them to the plan. 7. The multi -family buildings on the site plan have been labeled with the same numbering system as shown on the plat. 8. The site plan indicates building setbacks for Buildings 1,2,3,4, and 6. 9. Handicapped requirements will be shown on final submittal. 10. A solar variance was submitted with the Planning Objectives on March 31,1994. 11. Street trees have been added to the north side of Rolland Moore Drive to match the trees on the south side. 12. Jim Sell Design Inc. has contacted Mike Spurgin at the U.S.P.O., Mike Pretz, Poudre Fire Marshall, and Debbie Telez at Police Dispatch. All have given approval to the street name: Rolland Moore Drive. Sell Deslga-"cs - 1 13. Weathertop Lane had been labeled on the site plan. 117 �� n5 coKK�° 80524 (303) 484-7921