Loading...
HomeMy WebLinkAboutWINDTRAIL PARK PUD FINAL - 66 93E - CORRESPONDENCE - STAFF'S PROJECT COMMENTS_..__.This ---completes—the----review—comments —at ---this --time.-- Additional ------ -- comments may be forthcoming as the various departments —and reviewing agencies continue to review this. request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the October 24, 1994 Planning and Zoning Board. hearing: Plan revisions are due no later than the end of the corking day, October 5, 1994. Please contact se --for-the --number - of --folded revisions required for each document. PKTIs, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due by 3:00 p.m. on October 17, 1994. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. ASincely, Wra� Olt Project Planner xc: -Bob --Blanchard,"Chief Planner 'Kerrie-Ashbeck' Advance Planning Stormwater Utility Transportation Parks & Recreation Natural Resources Jim Sell Design TST Engineers file/Project Planner 6. Has an evaluation been made of the subdrain and groundwater - - - --_ -issues --in --this--area?----If --so,---how--will these issues be —_ addressed? Will-there-be-of-f-site--impacts-to-the-wet-lands-to the east? If an evaluation has not yet been performed, it should be done at this time. 7. The width of Bridgefield Lane on the utility plans does not match the width on the Site Plan. 8. The street name Bridgefield Lane should be reconsidered-. -There is a new development in the review process -that is -named Bridgefield P.U.D. and it is located just a short distance away, on West Prospect Road between the Heatheridge and Bridges projects. - 9. The width of Rolland Moore Drive is shown at 45' on the Site Plan. It should be 50' wide. 10. A sbils report should be submitted that addresses .the subdrain issue. 11. The section of Shire Court to be vacated should be done after the street network in this development is completed. 12. Is the detention pond large enough in area for the necessary volume of storage? The groundwater/soils report was done in March when the ditch was not running. This development may have to line the ditch or de -water. It is possible that some lots may have to be lost to accomplish the stormwater needs. 13. The Solar Orientation statement on the Site Plan should read "variance approved with preliminary". 14. There is a misspelled word in Project Note 8 after "privacy fences". 15. The City Council has adopted Ordinance #76, 1994 implementing part of the City's Water Demand Management Policy., The ordinance establishes water conservation standards for the design and installation of landscapes and irrigation systems. All applications, beginning with the .August 22, 1994 submittals, will need to -address the new requirements. These regulations apply to residential "common area" landscapes and their associated irrigation systems. The ordinance does not apply to the landscapes of single family residences. A copy of the ordinance is enclosed with the copy of this letter to Jim Sell Design. 16. What is -happening with the streetscape along south Shields Street? What is the reason for the transplanting of numerous trees, as shown on the Site & Landscape Plan? .3 . _. _ The distances _from _the _building -or--envelope to -the. -property ---- line must be shown wherever possible for the multi -family. Building envelopes fox —the multi -family should be shown on the Site Plan. 4. The subdivision plat appears to have Buildings 1 through 7 shown with platted envelopes - or are they lots? This is unclear. It is not a good idea to plat the lots or envelopes. They would have to be replatted, not by administrative change, if the buildings were to extend outside _of -the .lots/envelopes. 5. The Engineering Department has the following comments to offer: - a) A cul-de-sac or turn -around is required at the east end of Rolland Moore Drive. An off -site easement may be needed to enable this to be constructed. b) The drive that serves Lots 1 through 5 must be a driveway entering the street with a drive cut at each end. The sidewalk shall be placed 4.5' from the back of curb in the right-of-way. c) Shire Court must be intersected at a 90 degree angle.Show the existing right-of-way for Shire Court. More land may need to be dedicated for the street to tie in properly. d) Off -site sanitary sewer and storm drain easements are needed. e) Will subdrains be necessary for storm drains and sanitary sewer lines? f) Cross slopes are too flat. They seem to be calculated from the flowline and not the lip of the gutter, as required. g) A vacation ordinance is required to vacate a portion of Shire Court (it shall remain a utility easement). h) Add a sidewalk note to the vacated Shire Court area. i) Add a north arrow and scale to the Vicinity Map on the Site Plan. j) Add a written legal description and boundary metes & bounds calls on the Site Plan. Please contact Kerrie Ashbeck or Sheri Wamhoff, at 221-6750, if you have questions about the engineering comments. City of Fort Collins September 14, 1994 E John McCoy - - ------------------ — Windtrail Limited Liability Co. 3665 JFK Parkway, Building 1 Fort Collins, CO. 80525 Dear John, Staff has reviewed your documents for .the _windtrail Park P.U.D., Final that were submitted to the City on August 22, 1994, and would like to offer .the following comments: 1. Public Service Company of Colorado has stated that no trees may be planted within 4' of gas lines. 2. The Mapping and Surveying Department has the following comments to offer concerning the subdivision plat: a) The "off -site" - sanitary sewer and drainage easements must be dedicated by separate document(s) and the recording information for the easements must be shown on this plat. b) The dedication statement is incomplete. c) A Portion of this plat is a Replat of a Portion of an existing plat, and the title must reflect this. d) Bridgefield Lane dohs not match with Shire Court to the north. e) How was the north line of the SW 1/4 determined? f) The information shown at the l/4 corner is confusing. What is the bearing of the west line of the SW 1/41 g), How wide is White Mountain Court? h) How wide is the easement along South Shields Street? i) There are distances missing along South Shields Street, i.e.: ties to the centerline of Rolland Moore Drive. j) The plat does not close (0.757 N - S, 0.012 E - W). Please contact Jim Hoff, at 221-6605, if you have questions about these surveying comments. n 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750