Loading...
HomeMy WebLinkAbout601 TO 603 MATHEWS STREET PUD PRELIMINARY AND FINAL - 68 93 - CORRESPONDENCE -6. The .plans will be processed as a normal building permit application coordinated by the City's Building Inspection Division. Please contact Mike Gebo, 221-6760, for details on the',building permit application process. 7. As long as there is no increase of 350 square feet in impervious surface area, there will be no need to submit a Drainage Report to the City's Stormwater Utility. 8. Since the lot has two street frontages, no onsite parking will be required. 9. if a fence is to be placed within the public right-of-way, an encroachment permit must be applied for. Fencing style and height may be restricted to preserve sight distance around the 'corner. Please contact Dave Stringer, Chief Construction Inspector, 221-6605, for details on applying for an encroachment permit. 10. The request will also be reviewed for conformance to the East Side Neighborhood Plan. il. Please add the following note to the site plan: "There shall be no negative impact on the distribution of natural and artificial light on adjacent public and private property. There shall be no casting of shadows on adjacent property that would preclude the functional use of solar energy technology." 12. The Planning Department will require that you notify your adjacent property owners, in writing, as to the expansion plaA . These owners must respond to the Planning Department, in writing, that there are no objections to the expansion proposal. 13. It is suggested that a pre -submittal meeting take place to review the submittal documents, application, fees, and review schedule. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: September 27, 1993 ITEM: Duplex Expansion at 601-603 Mathews Street APPLICANT: Mr. Ben King and Ms. Liz Hatch. 601 Mathews Street, Fort Collins, CO. 80524. LAND USE DATA: Request to add onto the second floor of an existing duplex to increase the number of bedrooms per unit. Request would add one bedroom to one unit and two bedrooms to the other unit for a.total of three new bedrooms. COMMENTS: 1. The duplex is located in the N-C-M, Neighborhood Conservation Zone District. This zone allows the expansion of the duplex subject to review of a site plan by the Planning Exterior alterations will be reviewed so that a e7A#ua tial character is maintained in the neighborhoo ZotM*)G BOAtd 2. The:"expansion must adhere to all the requirements of the zone district. If these requirements cannot be met, then a variance must be obtained from the City's Zoning Board of Appeals. Variances are usually based on .hardship but the hardship must not be self-imposed. If there are variances from the Zoning Code which are required but the hardship is self-imposed, then the applicant has the option of submitting a Planned Unit Development (P.U.D.) for review and consideration by the Planning and Zoning Board. 3. If the electrical service to the panel remains at or less than 150 amps, then the City's Light and Power Department will not assess additional charges. You are encouraged to discuss the electrical needs with an electrical contractor. 4. If there are no changes to the existing water and sewer services, then the City's Water and Wastewater Department will not assess any additional charges. 5. The design of the new second floor must be certified by a licensed professional engineer, registered in the State of Colorado. The engineer's stamp must appear on the plans. COMMUNITY PLANNING & ENVIRONMENTAL VRV ICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT Comm ty Planning and Environmenta Planning Department, City of Fort Collins September 28, 1993 Mr. Ben King Ms. Liz Hatch 601 Mathews Street Fort Collins, CO 80524 Dear Mr. King and Ms. Hatch: ervices For your information, attached is a copy of the Staff's comments concerning Duplex Expansion at 601-603 Mathews, presented before the Conceptual Review Team on September 27, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made. at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Q Ted Shepard Senior Planner TS/gjd Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Stormwater Department Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750