HomeMy WebLinkAboutPOUDRE RIVER WHITEWATER PARK FORMERLY DOWNTOWN PARK - PDP160039 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 12/20/2016
02/15/2017: This comment is repeated because the plat needs to be corrected
as well.
12/20/2016: The Planning signature block needs to be updated. It should
reflect the Community Development and Neighborhood Services Director.
12
Topic: Lighting Plan
Comment Number: 5 Comment Originated: 12/29/2016
12/29/2016: Please change the project title to match the other plan sets.
Topic: Site Plan
Comment Number: 3
12/29/2016: There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-68209 nhahn@fcgov.com
Topic: General
Comment Number: 1
02/15/2017: No additional comments
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/29/2016
Comment Originated: 02/15/2017
Comment Originated: 12/27/2016
12/27/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated:
02/13/2017: The comment response letter addresses how these services will
be handles, but this is not reflected throughout the plans. Please add existing
water and sewer lines to the Demolition Plan and call out what will happen with
them.
12/30/2016: It does not appear that all existing utility services are shown on the
plans. These services will need to be clearly shown and called out and either
reused or abandoned at the main. Conceptual Review comment responses
indicate there will be irrigation service(s) proposed but I could not locate these
on the plans.
Comment Number: 3 Comment Originated:
02/13/2017: Repeat for reference.
12/30/2016: More detail will be needed for the proposed utility services and fire
hydrant. This can wait to be addressed until final.
12/30/2016
12/30/2016
11
Department: Technical Services
Contact: Jeff County, 970-221-6588, *county@fcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 12/29/2016
12/29/2016: Please change the project title to match the other plan sets.
Comment Number: 7 Comment Originated: 12/29/2016
12/29/2016: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 12/29/2016
12/29/2016: Please add a Benchmark Statement to the plans. The City has
moved to the NAVD88 vertical datum, and as of January 1, 2015, all projects
are required to be on NAVD88 datum. Please provide the following information
for the Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Comment Number: 9 Comment Originated: 12/29/2016
12/29/2016: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
Topic: General
Comment Number: 1 Comment Originated: 12/29/2016
12/29/2016: Please consider changing the sheet numbering on the cover
sheet. We are thinking S1-S3 for the site, L1-L4 for the landscape, M1-M3 for
the mitigation, Al-A2 for the architecture plans.
Comment Number: 2 Comment Originated: 12/29/2016
12/29/2016: ARCHITECTURE: No comments.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 12/29/2016
12/29/2016: MITIGATION: There are line over text issues. See redlines.
10
Comment Number: 18 Comment Originated: 02/14/2017
02/14/2017: There are three parallel parking spaces indicated within the
parking lot turn -around. Could one of these spaces be eliminated and then set
aside as a loading zone?
Comment Number: 19 Comment Originated: 02/14/2017
On Landscape sheet L3, please provide the quantity assigned to the selected
trees and shrubs.
Comment Number: 20 Comment Originated: 02/14/2017
02/14/2017: On the Lighting Plan, staff recommends that sheets EO.3, EO.4,
EO.5 and E3.0 be simplified and adjusted so that each fixture description
matches the Schedule and the selected specifications be called out.
Extraneous information from the manufacturer's cut sheets that are not
applicable can be deleted. Light gray and small fonts on various sheets need to
be remedied so that prints made from mylars will be legible.
Comment Number: 21
Comment Originated: 02/14/2017
02/14/2017: The Light Fixture Schedule on sheet E3.O is different from the
previous set of plans. This schedule needs to include more information per
fixture such as plan symbol, quantity, finish, lumens, light loss factor and whether
or not any backside shields will be used. As noted, be sure that the Schedule
and the product descriptions on the other sheets are consistent.
Comment Number: 22 Comment Originated: 02/14/2017
02/14/2017: Repeat Environmental Comment Number 13: Regarding the
Lighting Plan, thank you for explaining the dimming controls and the use of side
shields where needed. But, the plan sheets and Schedule do not call out these
features. Please revise as needed so the Lighting Plan is consistent with the
response to the comment.
Comment Number: 23
Comment Originated: 02/14/2017
02/14/2017: Repeat Environmental Comment Number 16: On sheets E3.3 and
E3.4, it appears that there is still illumination that is spilling over into the wetland.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischiam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 12/20/2016
02/06/2017: Repeat, I saw the note and will look for the materials at FDP.
12/20/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; an Erosion Control Plan,
an Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
E
Comment Number: 9
Comment Originated: 02/11/2017
02/11/2017: SIGNAGE
> Fire lane signage is needed at the entry point on E Vine to signal emergency
responders that this route has been designed for their use.
> The west terminus of the fire lane, past the Xcel site should be posted with,
"No large vehicle access past this point" to indicate fire apparatus should
venture no further.
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 13
Comment Originated: 02/14/2017
02/14/2017: Please consider enlarging the changing room. Since kayakers
typically arrive in groups, it would be more user-friendly for the changing room to
accommodate more than one person. Or, due to potential issues with the
transient population, please consider adding one changing room. Or, at the
very least, please consider calling out an additional changing room in the future
based on demand.
Comment Number: 14
Comment Originated: 02/14/2017
02/14/2017: More thought needs to be put into the functionality of the changing
room. For example, it needs to include a bench. If there are concerns about
usage by the transient population, the bench could be reduced in length (18"
24") to discourage resting or sleeping. Be sure that the changing room includes
four to six hooks or pegs as the floor will be likely be wet. Also, a small shelf
would be very useful for placing various sundries during the changing process
(eyewear, croakies, nose plugs, sunscreen, keys, gloves, etc.).
Comment Number: 15 Comment Originated: 02/14/2017
02/14/2017: The plans do not indicate the location of the put -in. It needs to be
as far upstream as possible. From plan view (I have not walked the site), a
suitable location appears to be northwest of the stone steps upstream of the
first whitewater feature.
Comment Number: 16
Comment Originated: 02/14/2017
02/14/2017: The plans do not indicate the location of the take-out. It needs to
be as far downstream as possible. From plan view (I have not walked the site),
a suitable location appears to be in the area of the future Poudre trail adjacent
(but not too close) to the Xcel facility. Another possible location would be near
the ADA Accessible River Access. Please be aware that the natural tendency
for a kayaker lugging a boat is to take the shortest possible route back to the
car. It is very likely that the path labeled as "Future Poudre Trail' will become an
informal path back to the parking lot.
Comment Number: 17
Comment Originated: 02/14/2017
02/14/2017: Overall, the plans indicate that trails are to be concrete. Would it
be possible to specify that the color be softened so that the extent of gray
concrete is minimized? Or, has there been any consideration for downgrading
to use of non -concrete materials for soft paths?
s
Comment Number: 2
Comment Originated: 02/02/2017
The identified eligible structure at 107 E Vine (Hersh Quonset Hut) will require
an additional review process once an adaptive reuse plan is established for that
structure. This should be noted on all final plans and development documents.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 12/28/2016
12/28/2016: Please provide a transformer location that is within 10' of a paved
surface. Please show the location on the utility plan.
Comment Number: 2 Comment Originated: 02/15/2017
02/15/2017: The transformer location shown looks to be 20' from Vine Dr and
20' away from the emergency access road. Please provide a location that is
within 10' of the road.
Department: Outside Agencies
Contact: Don Kapperman, Comcast,
Topic: General
Comment Number: 1
Comment Originated: 12/27/2016
COMCAST
12/27/2016: Please call in locates to see if Comcast is clear of all work area.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.org
Topic: General
Comment Number: 6
Comment Originated: 02/10/2017
02/10/2017: FIRE DEPARTMENT TRAINING OPPORTUNITY
Poudre Fire Authority is currently looking to acquire a single family residence for
use during a regional conference on attic fires during the first week of June. The
training is intended to be moderately invasive in nature: with 1" diameter holes
being punched in the roof and water application via a fog nozzle. There will be
no live fire associated with this exercise. Please contact me if your site may be
willing to pursue a discussion along this line and I will put you in touch with our
training division chief. Thank you.
Comment Number: 7
Comment Originated: 02/11/2017
02/11/2017: FIRE LANE TURNAROUND
PFA is asking the applicant to re-evaluate the hammerhead turnaround design
at the Xcel site, as the AutoTurn exhibit indicates the turning movement to be
limiting and therefore potentially problematic.
Comment Number: 8
Comment Originated: 02/11/2017
02/11/2017: GATE LOCATION
The location and design of the proposed gate (or bollard system) needs to be
submitted to PFA for review and approval. An approved means of unlocking the
gate (or removing bollards) is required.
7
Comment Number: 19 Comment Originated: 02/14/2017
02/14/2017: Clearly identify which fixtures, controls and shields are to be used
to avoid confusion in purchasing and installation. Currently the plans are very
busy and it is not entirely clear what shall be ordered to be in compliance with
City of Fort Collins lighting standards and requests.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 01/03/2017
Continued:
2/17/2017:
01/03/2017:
Please provide the mitigation ratio for Trees:Shrubs (1:10). For example, 10
shrubs would be required to be planted for every 1 mitigation tree.
Comment Number: 2
Comment Originated: 01/03/2017
Continued:
2/17/2017:
Please add General Landscape Notes, Enhanced Tree Protection Notes, and
Warranty & Inspection Notes to the Landscape Plans, which are available
through the City Forester. Additionally, please retitle "Street Tree Note" to `Tree
Permit Notes" and obtain these edited notes from the City Forester.
01/03/2017:
Please add Landscape Notes, Enhanced Tree Protection Notes, and Warranty
Notes to the Landscape Plans, which are available through the City Forester.
Comment Number: 4
Comment Originated: 02/17/2017
02/17/2017:
In regards to the existing trees to remain, please use the same symbol on the
landscape plans as shown in the key.
Comment Number: 5
Comment Originated: 02/17/2017
02/17/2017:
The City storm and water utilities may be removing the existing trees for bank
stabilization reasons. This removal work could impact TR15 and Grove 19. The
specifics on which trees are to be impacted can be obtained from Beck
Anderson with City Utilities (banderson@fcgov.com; office: 970-221-6682).
Department: Historic Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/02/2017
The proposed project appears to meet the requirements of Section 3.4.7 of the
Land Use Code and will go to the Landmark Preservation Commission for a
recommendation on February 15, 2017. Staff will provide a memo regarding the
recommendation and findings promptly following that meeting.
11
b. IF CHANGES ME TO BE MADE TO SEED MIX BASED ON SITE
CONDITIONS APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL
PLANNER.
c. APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED
(STANDARD TURF OR AGRICULTURE SEEDING EQUIPMENT SHALL NOT
BE USED).
d. TREAT NATIVE SEED MIX AREA PRIOR TO INSTALLATION OF SEED
WITH APPROPRIATE HERBICIDE TO HELP CONTROL HERBACEOUS
WEED SPECIES. ONLY AFTER APPROPRIATE TIME PERIOD THEN
APPLY NATIVE SEED AS CALLED FOR ON APPROVED PLANS.
e. AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED
STRAW OR OTHER APPROPRIATE METHODS AND PROVIDED
TEMPORARY IRRIGATION UNTIL SEED IS ESTABLISHED. CONTRACTOR
SHALL MONITOR SEEDED AREA FOR PROPER IRRIGATION, EROSION
CONTROL, GERMINATION AND RESEEDING AS NEEDED TO ESTABLISH
COVER.
f. THE APPROVED SEED MIX AREA IS INTENDED TO BE MAINTAINED IN
A NATURAL -LIKE LANDSCAPE AESTHETIC. IF AND WHEN MOWING
OCCURS IN NATIVE GRASS SEED MIX AREAS DO NOT MOW LOWER
THAN 6-8 INCHES IN HEIGHT TO AVOID INHIBITING NATIVE PLANT
GROWTH.
Comment Number: 16
Comment Originated: 02/14/2017
02/14/2017: Suggest working with Natural Areas Department staff to prepare
and provide the preferredplanting specs relevant to all types of plugs.
Topic: Lighting Plan
Comment Number: 17
Comment Originated: 02/14/2017
02/14/2017: Still unclear on specifications called out on lighting plans. Cooler
color temperatures are harsher at night and'cause more disruption to circadian
(biological) rhythms for both humans and wildlife. Warmer color temperature
(warm white, 3000K or less) are preferred and requested and those fixtures with
dimming capabilities.
Several departments within the City of Fort Collins have been working together
to address this issue; they are referred to as the City's Night Sky team. Results
of the team's work can currently be viewed on the City's Public Records website
in Resolution 2016-074, a summary of City of Fort Collins City Council Intent
and General Policy Regarding Night Sky Objectives. For further information
regarding health effects please see:
hftp://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Comment Number: 18 Comment Originated: 02/14/2017
02/14/2017: Current plans illustrate light spillage into natural habitat buffer
areas. City of Fort Collins Land Use Code Article 3.2.4(D)(6) requires that
lighting from parking areas or other site amenities shall not spill over to the
buffer areas. Please update the lighting fixtures and plans accordingly.
5
Comment Number: 16 Comment Originated: 12/28/2016
12/28/2016: Sheets E3.3, 3.4 and 3.5 all show spillover lighting into the wetland
areas. Please adjust the placement, shielding, or mounting heights of the light
fixtures to eliminate any light trespass into the wetland areas. Please also label
the wetland lines on the photometric plans.
Contact: Stephanie Blochowiak, 970-416-4290, sbiochowiak@fcgov.com
Topic: General
Comment Number: 20 Comment Originated: 02/14/2017
02/14/2017: Please update note regarding tree removal and songbirds on utility
plans, landscape plans and tree mitigation plans:
NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING
SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A
PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE
PROJECT SITE. IF ACTIVE NESTS ARE FOUND, THE CITY
ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.
Topic: Landscape Plans
Comment Number: 12
Comment Originated: 02/14/2017
02/14/2017: Landscape plans indicate "CSU Engines Lab trees impacted by
new trail alignment to be transplanted." Please clarify on landscape and tree
mitigation plans where the specific impacted trees will be transplanted from and
to. Ensure it is clearly marked and understood for those doing the transplanting.
Perhaps work with Forestry Department on the specs for that process.
Comment Number: 13 Comment Originated: 02/14/2017
02/14/2017: Thank you for clarification regarding the various plant communities
and seeded areas versus plugs versus seed and plug areas. This aids
significantly in reading plans and will aid significantly during post -construction
inspections.
Comment Number: 14 Comment Originated: 02/14/2017
02/14/2017: Include in Native Seed Mix the pounds/acre in addition to
pounds/square feet to be used for both a drill seed application and a broadcast
seed application. Please ensure a drill seed application rate of at 15lbs/acre. If
broadcast seed method is to be used double the rate - thus 30lbs/acre at a
minimum. Reaching out early to seed companies to place the order is highly
recommended.
Comment Number: 15 Comment Originated: 02/14/2017
02/14/2017: Please Add to Native Seed Mix notes on landscape plans.
a. NATIVE SEED SHALL BE PROVIDED BY (INSERT SEED MIX NAME AND
COMPANY FROM WHICH IT WILL COME FROM and COMPANY CONTACT
INFORMATION) AND THE GROUND SHALL BE CULTIVATED LIGHTLY
THEN SEEDED IN TWO DIRECTIONS TO DISTRIBUTE SEED EVENTLY
OVER ENTIRE AREA.
a
Comment Number: 19 Comment Originated:
02/15/2017
02/15/2017: Vine profile will need to show how existing asphalt without curb
and gutter will transition to the new section of roadway with the new public
infrastructure improvements.
Comment Number: 20 Comment Originated:
02/15/2017
02/15/2017: It looks like the Vine drive profile will need to be adjusted so a high
point is created between the two proposed inlets. This will help achieve the
0.5% at inlets and the minimum flow line grades.
Comment Number: 21 Comment Originated:
02/15/2017
02/15/2017: The Vine Drive cross sections will need to show the existing
grades. Is the Vine Drive centerline label for the ultimate or interim condition?
Comment Number: 22 Comment Originated:
02/15/2017
02/15/2017: The parkway grading maximum is 4:1. Please adjust your 3:1
grading to meet our maximum grading standards.
Comment Number: 23 Comment Originated: 02/15/2017
02/15/2017: A striping plan will be needed. We need to verify that what you're
proposing will work. Will addition asphalt be needed to the north of vine drive to
accommodate the center turn lane? Will there be an interim striping plan? How
will it transition from two lanes at College Avenue, to on street parking, to no on
street parking?
Topic: Plat
Comment Number: 2
Comment Originated: 02/15/2017
02/15/2017: Since the property is City owned property, all public easements
should be referred to as "Alignments"
Comment Number: 3
Comment Originated: 02/15/2017
02/15/2017: Is there a reason the property to the south of the Poudre Pet &
Feed Supply along College Avenue is not included with the Plat? Plans show a
sidewalk connection in this area and it being a part of the overall project.
Comment Number: 4
Comment Originated: 02/15/2017
02/15/2017: The proposed parcel shown on the Plat (Book 825, Page 530)
can be combined with Lot 1 if this lot is acquired during final review.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-26259 reverette@fcgov.com
Topic: Lighting Plan
Comment Number: 12
Comment Originated: 12/28/2016
12/28/2016: For all proposed light fixtures, please use versions with 3000K
color temperatures or less to minimize impacts to sensitive natural features.
Some fixtures are shown in 4000K and 5000K version on sheet E3.0 of the
lighting plan, which will not meet the environmental protection requirements.
Comment Number: 13 Comment Originated: 12/28/2016
12/28/2016: Will any motion sensing, dimming, or timing controls be used for
any of the light fixtures. These are all highly recommended to reduce impacts to
the river corridor, wetlands, nesting birds and other wildlife.
3
Comment Number: 9 Comment Originated: 02/15/2017
02/15/2017: Plans are still really unclear as to where existing ROW and public
infrastructure are located. Curb, gutter, sidewalk, driveways, edge of pavement,
etc. will be needed along Vine Drive and College Avenue. Clearly delineate the
existing ROW along the entire Vine drive (and College Ave), not just on the
property frontage.
Comment Number: 10 Comment Originated: 02/15/2017
02/15/2017: To simplify and clean up the utility plans, please consider ghost
utilities that aren't public. If there is a desire to show all these utilities, maybe
only show them on existing conditions sheet or utilities sheet.
Comment Number: 11 Comment Originated: 02/15/2017
02/15/2017: What are the water and sanitary main sizes? Service sizes?
Please label.
Comment Number: 12 Comment Originated:
02/15/2017
02/15/2017: The portion of sidewalk that bend around trees to the south will
need to be in Access Alignments.
Comment Number: 13 Comment Originated:
02/15/2017
02/15/2017: Please move all City signature blocks to the lower right corner of
the Utility Plan sheets.
Comment Number: 14 Comment Originated:
02/15/2017
02/15/2017: Please turn off grading and utility layer from the road plan and
profile sheets.
Comment Number: 15 Comment Originated:
02/15/2017
02/15/2017: A lot of work is still needed on the Vine Drive Plan and Profile
Sheets. A complete Street design is needed to verify what you're proposing in
going to work in the interim. Right flowline, left flowline and centerline profiles will
be needed for Vine Drive. As proposed, the variance requests for reduced
flowline grades and cross section grades is not acceptable. It will need to be
designed so that these parameters are met. This will most likely mean taking
the Vine Drive to the centerline to achieve the minimum grades.
Comment Number: 16
Comment Originated: 02/15/2017
02/15/2017: The two properties on the south of Vine Drive currently do not
show parallel parking. Vine Drive will need to be designed with these properties
going away and the flowline in the ultimate configuration.
Comment Number: 17 Comment Originated: 02/15/2017
02/15/2017: Additional stationing is needed at points in where the flowlines
transition from no on street parking to on street parking. As proposed, I'm not
sure these areas will drain properly, especially near the existing homes not a
part of this project. An inlet may be needed in this area. We will need to see
horizontal design radii, lengths, etc.
Comment Number: 18 Comment Originated: 02/15/2017
02/15/2017: What type of driveway is being proposed for the two residential
properties that will remain? Please show in Vine Drive plan/profile sheet as well
as the utility or horizontal control plan.
2
City of
art Collins
February 17, 2017
Roger Sherman
BHA DESIGN
1603 OAKRIDGE DRIVE
Fort Collins, CO 80521
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
tcgov. com/de velopmentreview
RE: Poudre River Whitewater Park (formerly Poudre River Downtown Park),
PDP160039, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Rebecca Everette, at 970-416-2625 or rverette@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 02/15/2017
02/15/2017: The Title of the Utility Plans should match the Plat. It should read:
"Utility Plans for Poudre River Downtown...". Please make sure all individual
sheets match this title as well
Comment Number: 6 Comment Originated:. 02/15/2017
02/15/2017: General Notes in the Utility Plan should follow Appendix E-1, which
can be found here:
http://www.larimer.org/engineering/gmardstds/ApdxE_04_01 _2007.pdf
Comment Number: 7 Comment Originated: 02/15/2017
02/15/2017: Survey Control and Geotechnical Borehole Locations/Logs aren't
required in the Utility Plan, but they can be left if desired. In the case that
information changes after plans are approved, then they will need to be revised
accordingly.
Comment Number: 8 Comment Originated: 02/15/2017
02/15/2017: Demolition Plan should include pavement along Vine Drive or
College Avenue that is being removed.