Meeting at Plymouth Church, development team and neighbors looking in detail at plantings and
fencing. Product was a marked up plan with tree locations.
1.28 sent
Colleen and developer team —flooding
Per — the wall on west side of The Standard
1.30 sent
Meeting at 281 with Per
2.5 sent
Shane — flooding and drainage
Tom —draft replies
Sheldon Powell —agreement
2.6 sent
Steve Fonte x2 — plans, balconies
Colleen, Ross, Darin et al x3 —agreements, flooding
Per x 4 — plans
Danny at Northern Engineering
2.7 sent
Developer team x 2 - fencing