HomeMy WebLinkAboutWATERGLEN PUD REPLAT #1 - 71 93C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSCommt 'y Planning and Environmental cvices Current Planning City of Fort Collins February 26, 2001 JR Engineering Attention: David Klockeman 2620 East Prospect Road; Suite 190 Fort Collins, Colorado 80723 Subject: Waterglen PUD Replat .Project #71-93C Application Deficiencies Dear Mr. Klockeman: Thank you for the application for Waterglen PUD Replat submitted on February 7, 2001. After preliminary review of the application, staff has determined that more information is necessary to complete a thorough and accurate review. The City's Stormwater Utility Department cannot evaluate the request until a floodplain analysis (HEC-2) is submitted that shows that the new lot delineation is outside the floodplain. The Stormwater Department is also requesting a detailed site plan, landscaping plan and grading plan. The site plan and landscaping plan are needed so that stormwater fees can be calculated. It was the understanding of the Stormwater Department that these documents would be submitted with the application. The Current Planning department also needs these detailed site plans with the proposed subdivision lines over -laid on top. The overlay is necessary to make sure that the proposed subdivision does not create non -conformities. Review of the application will be placed on hold until the needed items are received. If you have further questions please call our office at 970.416.2138 Sincerely, Cameron Gloss Director of Current Planning 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 Mr. Cameron Gloss February 28, 2001 Page 2 of 2 We are confident that we are preparing all of the additional information necessary to complete this project and will submit them as soon as they are complete. We apologize for any problems this incomplete submittal may have caused for City Staff. We recognize that we should have waited for all of the information prior to submitting, as we do on our other projects. We look forward to working with City Staff on taking this project through approval. If you have any questions or comments, or need additional information, please do not hesitate to contact me at 491-9888. Thank you. Sincerely, JR Engineering VV_ David W: Klockeman, PE Division Manager February 28, 2001 Mr. Cameron Gloss, Director Current Planning Department City of Fort Collins 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522 Re: Waterglen PUD Replat Dear Cameron: ft) J•R ENGINEERING A Subsidiary of Weslrian We have received your letter of February 26, 2001, relating to our recent submittal of the above referenced project. We are in agreement with your findings. It was not until after the actual submittal of the replat documents that we were informed of the overall requirements of the project. _ At the time of the submittal, I was new to the project -- the Project Manager that had been working on this project had left JR and had not provided adequate detailed information on this project prior to his departure — and I was asked to step in to complete the replat. Based on meetings with the developer, it was my understanding that a Minor Amendment had been approved for this project. It was also my understanding that several meetings had taken place between the Developer and Stormwater and, in order to remove the constraint that the City issue a "Flood Plain Use Permit" every time a building permit was requested within the multi -family and commercial areas, the drainage easement containing the flood plan was be placed in a separate tract. Thus the submittal of the replat document. Prior to the submittal, I had placed two calls to Basil Hamdan at Stormwater prior to the submittal to seek input on the requirements as I was knew that Stormwater would most likely need additional information. Unfortunately, I had not heard back from Basil. Even so, based on the incomplete information we had, the submittal was made at the insistence of the developer to "get the process started". (I actually ran into Basil while I was at the City making the submittal. It was at that time that I learned that there were more requirements.) Since that time, we have had a meeting with Basil to clarify the required information. In addition, the developer has forwarded JR a copy of the approved Minor Amendment Application Form, which details the remainder of the necessary documents for submittal. 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w Jrengineering.com