Loading...
HomeMy WebLinkAboutWATERGLEN PUD REPLAT #1 - 71 93C - CORRESPONDENCE - STAFF'S PROJECT COMMENTSVk Comm ty Planning and Environmental _rvices Current Planning City of Fort Collins May 2, 2001 JR Engineering Attention: Jim Wright 2620 East Prospect Road; Suite 190 Fort Collins, Colorado 80723 Subject: Waterglen PUD Replat Project #71-93C Staff Comments Dear Mr. Wright: Thank you for the application for Waterglen PUD Replat. The following agencies have reviewed the plat and have comments provided as attachments to this letter. City of Fort Collins Engineering (See Technical Services Redlines) City of Fort Collins Technical Services (Includes Redlines) City of Fort Collins Stormwater City of Fort Collins Light and Power Poudre Fire Authority Current Planning staff has reviewed the proposal and has the following comments: 1. It would appear that the Western Slope Gas Company easement was vacated with the original Waterglen PUD Plat. Why is it shown on this replat? 2. When I add up the totals of Tracts P1 and P2 I get 9.65 acres. Tract P, on the original plat is shown as being 9.601 acres. This may not be a big deal; however, I thought it should be pointed out. Is there an explanation? 3. The "Current Planning Director" signature block should indicate that it is the director signing the plat rather than the Planning and Zoning Board. If you have further questions please call our office at 970.416.2138 Sincerely, Brian Austin Grubb, AICP City Planner 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020