Loading...
HomeMy WebLinkAboutWINDTRAIL TOWNHOMES PUD PRELIMINARY - 66 93 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNEIGHBORHOOD INFORMATION MEETINGDid You Receive Written Notification of this meeting? orreet address. Name Address ZIP Yes No Yes No do—,v a 2' WAIXY I 1� NEIGHBORHOOD INFORMATION MEETING / Dd You Receive Written Notification of this meeting? Correct Address' Name Address Zip Yes No Yes No 2!5DEPEY D e- l -rlf tO4.4 myt D67 T f 106 5 S�lblds g'o�aL ✓ Z / S k I L.6 4..44Q ld4V F-03- ` &SInle- A&oKsIlern /go? So 4AifCVftA6 l e go b✓aC(�,tt Dr ✓ t/ GO o4r u x .0 0, b'aS Z� � 'Iroo rn f26 ✓ of lUe,K Si l)I qD►-G cJ/Nj e vs2-lo V Y,� • D� Lei /70o J Fact Sheet Development: Wind Trail Townhomes Contact: John McCoy, Owner Ph. 226-5511 Goal: A well planned townhouse community, taking advantage of the natural beauty of the site while meeting City development guide- lines and responding to the changing residential market. Location: East side of Shields, 1 mile south of Prospect Road north- Spring Creek Open Space south -Centre for Advanced Technology east- Centre for Advanced Technology southeast- CSU west- Hill Pond southwest- Sundering Townhomes Status: Zoned rp Area: 6.2 acres with 38 lots Density: 6.1 units per acre Product: The units will be 1 and 2 story, with a maximum building height of 35 feet. The units will have 2 car garages, driveways for 2 addi- tional cars, private patios, and open space areas between the duplexes. Additional guest parking will be available in a land- scaped parking area in the cul-de-sac bulb. Amenities: The project will be within walking distance of Rolland Moore Park, and have access to the Spring Creek Bike Trail. Utilities: All utilities are available adjacent to the site. RESPONSE: Poudre Fire Authority needs two points of access to all residential areas. Measuring from the point where there is only a single point of access, development is not allowed beyond 660 feet. If a developer is willing to construct homes with approved automatic fire extinguishing systems, then homes may be constructed beyond the 660 foot limit. Most developers find that such systems are expensive and not residential in character and are not well accepted by the buying public. 12. Could construction traffic be routed over a temporary access road across the C.S.U.R.F. property? RESPONSE: The developer will ask C.S.U.R.F. for permission for an access easement for construction traffic. 13. What about the wetlands? RESPONSE: A wetland consultant is working with the surveyors to determine the extent of the wetlands. As you know, wetlands are protected under Section 404 of the Clean Water Act. Also, the City's Department of Natural Resources works closely with the Planning Department to make sure wetland areas remain undisturbed. The developer does not plan on developing the larger wetland area. However, there is a smaller area that may be impacted if a local street is connected from our 35 acre parcel south to the Shields/ Rolland Moore intersection. 14. Would the units be constructed all at once? RESPONSE: The developer would like to sell all 38 units within a 12 month period. If this does not work, then the project is set up so it could be phased from west to east building one cul-de-sac at a time. Division since these types of units are already being constructed on approved lots within the Sundering project. The same models and square footage options would be made available. The siding would be the same but there may be variations in paint colors. 5. What about the street connections? RESPONSE: Hill Pond Road and Shire Court would be extended to serve the site. These streets would be the standard local street which is 36 feet wide. 6. Are there water and sewer services to the site? RESPONSE: Yes, water is extended from the west and sewer is expected to be brought up from the south from the C.S.U.R.F. property. 7. What are the long range plans for C.S.U.R.F. Tract J parcel? RESPONSE: As of now, the parcel is designated on the Overall Development Plan as "Nursing Center, Retirement Center, Elderly Housing, Health Care, and Multi -Family". The long range plans are to hold the property for the future needs of Colorado State University. Since the property is owned free and clear, there is no pressure for immediate development. 8. What is the status of .extending Centre Avenue from C.A.T to the Holiday Inn? RESPONSE: This collector street will be built as development occurs in the C.A.T. 9. The Transportation Department needs to know that it is difficult to exit Hill Pond Road onto southbound Shields. The signal at Shields and Raintree does not stop the traffic enough to allow us to exit. This signal is only activated if there is cross traffic on Centre Avenue or Raintree Drive. Otherwise, it remains on green for Shields traffic. RESPONSE: The Transportation Department will be notified of this condition. 10. It will be helpful for the Shields/Rolland Moore intersection to be constructed and signalized so that we can make left turns onto Shields and so can Rolland Moore traffic. Without a signal, its a tough left.exiting the park. RESPONSE: As development occurs, this intersection will be constructed and signalized, and the Shields/Shire Court intersection will be closed. 11.' How far east can development go. before it would be in violation of the access requirements of the Poudre Fire Authority? NEIGHBORHOOD MEETING MINUTES PROJECT: Wind Trail Townhomes DATE: September 2, 1993 DEVELOPER: Mr. John McCoy REPRESENTATIVE: Kay Force, Jim Sell Design PLANNER: Ted Shepard QUESTIONS, CONCERNSt COMMENTS The meeting began with a synopsis of the proposed development. The request is for 38 townhomes on 6.2 acres. This is a density of 6.1 dwelling units per acre. The units will be one and two story with a maximum building height of 35 feet. The 6.2 acres are part of a contiguous 35 acre parcel owned by the developer. There are no immediate development plans on the balance of the site. 1. Please describe the area that is being considered for acquisition by the Department of Natural Resources. RESPONSE: The developer and the Department of Natural Resources have begun negotiations on 16 acres of land on the north side of the 35 acre parcel, just south of the Spring Creek Trail. Discussions are very preliminary and the size of the tract may be modified. 2. What happens if the D.N.R. does not acquire this tract? RESPONSE: It is likely that the tract would then be included in a future planned unit development and divided into lots for single family homes. 3. How does this 6.2 acre site blend in with what is proposed on the C.S.U.R.F. property to the south? (Tract J of the Centre of Advanced Technology Overall Development Plan.) RESPONSE: The developer is proposing a land trade with C.S.U.R.F. The proposal is that the developer would gain land area along Shields and C.S.U.R.F. would gain area east of the proposed townhomes on the developer's 35 acre parcel. 4. Would the townhome units be similar to Sundering Townhomes? RESPONSE: Yes, the proposed units would be similar. The building plans have already been approved by the City's Building Inspection