HomeMy WebLinkAboutFTC FOXSTONE WTE VERIZON - FDP190001 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVEPROJECT NARRATIVE
VERIZON WIRELESS
FTC FOXSTONE
FINAL DEVELOPMENT PLAN
REVIEW FOR WIRELESS
COMMUNICATION SITE
PROJECT INFORMATION
Applicant Information: Verizon Wireless (VAW) LLC, d/b/a/ Verizon Wireless, 3131 South
Vaughn Way, Aurora, CO 80014
Representative: Jennifer Daniels, Leasing and Zoning Consultant, Centerline Solutions, 16360
Table Mountain Pkwy, Golden, CO 80403; (303) 550-4820
Land Owner Information: Securcare Properties I, LLC. 9296 Teddy Lane Suite 100, Littleton
CO, 80124 - Owner Contact: Caleb Crossland (970) 222-1341
En¢ineerine Firm Prenarine Site Plan: Centerline Solutions, LLC. 16035 Table Mountain
Pkwy, Golden, CO 80403; (720) 304-6882
Address of Proiect: 1961 Caribou Dr. Fort Collins, CO
Past Meetine Dates: PDP Hearing 12.6.18
PROJECT NARRATIVE
Verizon Wireless proposes to develop a new telecommunications site, "Verizon Wireless FTC
Foxstone" at 1961 Caribou Dr. in the northeast corner of the site. The purpose of this site is to
provide improved 4G-LTE voice and data capacity for Verizon Wireless customers in the
area. The proposed site will be part of a continuous telecommunications network serving the
greater Fort Collins area. Approval of this application will allow Verizon Wireless to meet its
federally mandated obligations under the license granted by the Federal Communications
Commission (FCC) pursuant to the Telecommunications Act of 1996. The explosive growth
of data usage from "smartphones" and similar devices has made it necessary to increase data
capacity in densely populated areas. The proposed facility will address the need for additional
capacity for the neighborhoods directly to the west and southeast.
The proposed site will include a total of one (1) monopole concealed in a bell tower like structure
with three (3) antenna arrays consisting of four (4) antennas each. The tower will be located in the
northeast corner of the property. The associated equipment will be located at the base of the pole
within fencing to match existing. The following pages provide detail regarding compliance with
the City's zoning requirements for Wireless Telecommunication Sites.