Loading...
HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - CORRESPONDENCE - CITY STAFF (10)of Fort Collins PROJECT CONVIlV1ENT SHEET DATE: 18 June 1994 DEPARTNMNT: S'MRMWqTSR PROJECT: 71-93A WATERGLEN PUD - Final PLANNER: Steve Olt All comments must be received by Friday, 29 July 1994 ❑ No Problems Problems or Concerns. (see below) This submittal will not be reviewed by the Stormwater Utility since it does not meet the condition of preliminary approval. The condition as stated in my comments dated 4/20/94 was that approval of the major drainage work that is to be done in the State Right of Way along I-25 be obtained from the Colorado Department of Transportation PRIOR to final submittal. Since this condition has not been demonstrably met, this submittal will be rejected. Date: zkz Signature: CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS: ❑ PLAT �• S}w` O I t- . ❑ SITE cc : Lt l G lQcs ❑ LANDSCAPE ❑ UTILITY Cr: k550c- LC: 7!a_oN;vla DEVELOPMENT SERVICES CC � PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 8052N0580 (3031 _I-6750 Utili. Services Stormwater City of Fort Collins July 27,,19.94 Ms. Libbey Glass, WW Reynolds, Inc. 1600 Specht Point Drive, Suite C Fort Collins, Colorado 80525 Dear Ms. Glass: The project comment sheet, for Waterglen PUD - Final, is attached for your use. If you have any questions please give me a call. Sincerely, _ Basil Hamdan Civil Engineer 235 Mathews Street • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239