HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - CORRESPONDENCE - OTHER JURISDICTIONSMr. Steve Olt
September 1, 1994
Page 2 of 2
Waterglen
I can be contacted at (303) 350-2163 if you have further questions
regarding our acceptance of the grading and drainage plan.
Sincerely,
Teres G. Jones
egion Developm /Access Coordinator
TGJ:gi
ATTACH: Memorandum dated June 14, 1994
xc: D. Yost
J. Springer
Cityscape - 3555 Stanford Road, Suite 105
Fort Collins, CO 80525
ATTN: Eldon Ward
Love and Associates - 2995 Center Green Court South
Boulder, CO 80301
ATTN: Gene Morris
file
DEPARTMENT OFTRA�
Region 4
1420 2nd Street
P.O. Box 850 `
Greeley, Colorado 86632-o£
(303) 353-1232
STATE OF COLORADO
d
ISPO T OT
8 ' Larimer County, WFR 'I-21. 5
Wat6rglen Drainage & Grading
N.W. Corner I-25 & E. Vine Drive
N.E. of Fort Collins
September 1, 1994
Mr. Steve Olt
Planning Division
Larimer County
P.O. Box 1190
Fort Collins, CO 80522
Dear Steve,
I am providing a letter at your request to address the
Department's review of the grading and drainage plans for the
Waterglen subdivision. As stated in the'memorandum attached, dated
June 14, 1994, the Department was requested to review the grading
plans and berm for this development. The berm and noise abatement
issue is still being resolved with -the assistance of the Environmental
Unit of the Department. A letter will be forthcoming from Mr. John
Crier regarding this issue. Our acceptance of the drainage and
grading plan is the address of this letter.
Although the issue of noise abatement measures, specifically the
height of the berm and/or the proximity of development to the highway
is still being reviewed, Mr. Crier has indicated that any adjustment
of those features would have minimal effect, if any, upon the location
of the berm. Therefore, it is assumed that the drainage configuration
and rate would not be increased by changes of the noise abatement
system since the berm height would not be decreased, and may, perhaps,
be increased.
Mr. John Springer, Senior,Highway Maintenance Supervisor., and T
have both reviewed the grading plan which was submitted. Mr. Springer
has inspected the site and we have both accepted the plan. Find
attached a copy of the memorandum from Cityscape which was signed by
John and I on July 27,1994. Please note that in our acceptance I
lined out references to the berm (noise abatement).