Loading...
HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - AGENDA - MEETING COMMUNICATIONAGENDA -WATERGLEN PUD Coordination Meeting at Fort Collins 1st Floor Planning Conference Room �p �vaa ya s, & Associates, Inc. o u r e a C o n s u I t o n t s 2995 Cantergreen Court South. Suite C Bonder. Colorado 80301-5421 Phone (303) 440.3439 FAX (303) 440,3W 1. SUBMISSION DEADLINE - October 5th for Everything or VariesT • Plat • Water & Sanitary Sewer Utility • Drainage/Grading and Storm Sewer • Roadway What is the product to be submitted for each and how many copies of each are required? 2. UTILITY MODIFICATIONS: Gas Utility Depth of Main Transmission Line (runs east -west thru property) Requirements of Gas Easement - Main Transmission Line • Infrastructure Components Crossing thru Easement (roads and utilities) • Separation Requirement • Minimum and maximum cover (i.e. impacted by swales and berms, etc.) 1(• Electric Utility: • Minimum undisturbed distance around towers (cut or fill) • Requirements of Electric Easement (Main Overhead Lines) • Infrastructure Components Crossing thru Easement X • Telephone/Cable Utility: • Do we need to show Telephone utility trench on the utility drawings? X• Sanitary Sewer Utility • Groundwater conditions affecting utility installation • Groundwater levels • Location of top of gravel • System layout )a Water Utility: • System Layout (describe) • Master Meters (5) • Ownership of Lines - Service Lines in Private Driveways - Dedicate Easements? • Design Criteria - Review of Layout • Minimum - Maximum depth for main transmission line under Waterglen Drive? Drainage Utility: • Revised grading plan • Impacts to Drainage Report • Storm Sewer & Drainage System Layout • Cooper Slough and Vine Drive Box Culvert 3. ROADWAY MODIFICATIONS: • Handicap Ramps • Cross Pans Roadway Curvature • Vine Drive • Required improvements • Box Culvert length at Cooper Slough • Sidewalk? • Has soils report and recommended pavement sections been approved by City?