HomeMy WebLinkAboutWINDTRAIL ON SPRING CREEK PUD PHASE TWO PRELIMINARY - 66 93B - CORRESPONDENCE - STAFF'S PROJECT COMMENTS8. The plat should indicate the percentage of total lots that comply with the solar orientation ordinance. 9. Please add a project note that landscape maintenance in the Spring Creek, open space is the responsibility of the homeowner's association. (The Parks and Recreation Department will maintain the trail only.) 10. There needs to be a continuation of the bicycle/pedestrian path from the townhomes to the Spring Creek Trail. It is recommended that the path continue north from Gilgalad Way between Lots 11 and 12. Also, the path indicated at the .terminus of Gilgalad Court should be indicated to be seven feet wide and constructed out of concrete. 11. Plant note number 10 may -have to be tied to a phasing of the landscaping versus a percentage of building permits. 12. At the time of Final, fencing details, particularly along north lot lines, should be provided. 13. What is the status of the existing mature trees in the northeast corner of the site? Will these be preserved? Please indicate existing trees to be preserved on the site/landscape plan. This concludes Staff comments at this time. In order to stay on schedule for the February 28, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due February 10, 1994 (three prints). P.M.T.Is, 10 prints, and renderings are due February 22, 1994. As always, please feel free to call to discuss these comments if you have any questions or concerns. Sincerely: Ted Shepard Senior Planner xc: Joe Frank, Chief Planner Kerrie Ashbeck, Civil Engineer Community Planning and Environmental Services Planning Department City of Fort Collins January 27, 1994 Ms. Kay Force Jim Sell Design 117 East Mountain Avenue Fort Collins, CO 80524 Dear Kay: Staff has completed its interdepartmental review of Windtrail on Spring Creek, Second Filing, Preliminary P.U.D. The following comments are offered: 1. The Public Service Company cautions that easements adjacent to the right-of-way must be wide enough such that the distance from back of walk to rear line of the easement is at least 13 feet. 2. Open space Tracts A, B, and C must have utility easements - adjacent to the right-of-way,, or be dedicated on the plat as utility easements. 3. The Engineering Department is concerned about the high water table yet the Drainage Report does not discuss the need for a sub drain system. A de -watering system is recommended around foundations and under slabs. A hydrologic study and design of the system will be required at the time of final. It is recommended that there be no basements in this P.U.D. 4. Please be aware that Shadowmere Court will need to be constructed prior to issuance of a portion of the building permits in Filing Two in order to satisfy Fire Code requirements. 5. Lots 24 and 25 will be restricted to take access off Gilgalad Way unless a temporary turnaround is constructed and easement provided on Tract C. 6. Please delete the reference on the adjoining Tract C that it is "under negotiations." It is not clear what this means. Please refer to this area as it is designated on the approved O.D.P. 7. Both the plat and site plan should indicate that the Spring Creek open space is a "pedestrian, equestrian, and bicycle easement." 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750