HomeMy WebLinkAboutWINDTRAIL ON SPRING CREEK PUD PHASE TWO PRELIMINARY - 66 93B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS11. Completion of landscaping has been clarified in the planting notes.
12. Fencing details will be shown at final.
13. Jim Sell Design has field located the trees in the northeast corner.
and shown on the site plan. Those to be preserved have been
noted.
We hope that these revisions address the concerns of the development
review staff.
Sincerely,
JIM SELL DESIGN, INC.
—dYCe"'/
Kay Force
xc: John McCoy
TST
February 10, 1994
Ted Shepard
Planning Department
City of Fort Collins
RE: Windtrail on Spring Creek PUD
Preliminary Revisions
Dear Ted:
This letter is in response to staff comments of January 27, 1994,
regarding Windtrail on Spring Creek P.U.D., Preliminary. The
response numbers correspond to those of staff comments. Those not
noted will be addressed by the project engineer.
1. OK
2. OK
3. A hydrologic study is under way, and will accompany the final
submittal.
4. The owner is aware of this.
5. Lots will access off Gilgalad Way.
6. Designation is now consistent with ODP.
7. Open Space designation changed.
9. Open Space maintenance noted as homeowner assoc. responsibility.
10. Suggested path location between Lots 11 and 12 has been shown on
site plan and engineering drawings. The path connection east of
Gilgalad Ct. will be eliminated.
im Sell Dom.
J,
n"G eon
117 C303)484.1921