Loading...
HomeMy WebLinkAboutWINDTRAIL ON SPRING CREEK PUD PHASE TWO PRELIMINARY - 66 93B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE RELATED DOCUMENTJanuary 3, 1994 Mr. Basil Harridan City of Fort Collins Stormwater Department P.O. Box 580 Fort Collins, Colorado 80522 RE: Windtrail P.U.D. Project No. 10-770-000 Dear Mr. Hamdan: The preliminary drainage report which was submitted for the Windtrail P.U.D. included both the townhomes section (Phase One) and the single family section (Phase Two). Therefore, there will not be a drainage report submitted separately for just the single family portion. If you have any questions, please feel free to call me. Sincerely, TST, INC., CONSULTING ENGINEERS Keith G. Sheaffer Engineer KGS/kd TST1�C• 748 Whalers Way - BuildingD 102 Inverness Terrace East ! Fort Collins, CO 80525 Suite 105 Consulting Engineers (303)226-0557 Englewood. CO 80112 Metro Denver (303) 595 -9103 (303)792-0557 Fax (303) 226-0204 Fax (303) 792-9489