Loading...
HomeMy WebLinkAboutWATERGLEN PUD PDP - 71 93A - CORRESPONDENCE - CORRESPONDENCEurban design, inc. Adopted City Land Use Policies (including 25, 40, and 41) clearly indicate that City participation in infrastructure costs in the northeast area is appropriate. " Note: In the notes provided by Jon Ruiz from our March 24, 1994 meeting, he states that the "City will work out concepts of what work needs to be done, options for funding the work, and timing of funding.... If (the) City and Developer come to agreement on these issues, (the) Developer will not submit waivers to P&Z. Waivers will be requested if (the parties) can't agree..." This is not exactly correct. It is entirely possible that the City and the Developer will agree on a solution that will still require a waiver from P&Z. It was also our understanding that the applicant would be involved in determining the extent of the work required, and the funding options. Revised Land Use Breakdowns and Density Charts are attached. Reductions, color renderings, and 10 sets of prints will be submitted by April 18th. Please distribute copies of this letter to the staff members who attended the March 24th meeting. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Bill Reynolds, W.W. Reynolds Companies Libby Glass, W.W. Reynolds Companies Mike Blank, W.W. Reynolds Companies Jack Blake, Stewart & Associates David Love, Love & Associates Armando Balloffet, Balloffet and Associates Matt Delich Lucia Liley, March & Myatt April 14, 1994 City of Fort Collins Planning and Zoning Board P.O. Box 580 Fort Collins, CO 80523 Dear Board Members; Co�y7p@P(A) urban design, inc. 3555 stanford road, suite 105 fort Collins, Colorado 80525 (303) 226-4074 FAX (303) 226-4196 As discussed at the March 7th P&Z meeting, we have indicated 36' wide local streets with 48' rights -of -way and - where applicable - 28' streets with 40' rights -of -way, on the revised Preliminary PUD Site and Landscape Plan for Waterglen. The standard utility easements adjacent to these streets will be 12' wide. It is our understanding that this reduced right-of-way width has been proposed by City Staff for local streets throughout Fort Collins; but this new standard has not yet been finally adopted. Technically then, we must request a variance to allow the street right-of-way width that has been proposed by Staff. This letter represents that request. Thank you for your consideration. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc:, Bill Reynolds, The W.W. Reynolds Companies Libby Glass, The W.W. Reynolds Companies Jack Blake, Stewart & Associates TRANSMITTAL LETTER TO: Steve Olt City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 DATE: April 14, 1994 PROJECT: Waterglen Preliminary PUD PROJECT NO: 6552 We are transmitting the following: co�n@ @ o urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 1 each Letter to the Planning & Zoning Board requesting a Variance on the Street Right -of -Way Width BY MESSENGER Sincerely, Received by: Cit scape Design, Inc.