HomeMy WebLinkAboutWATERGLEN PUD PDP - 71 93A - CORRESPONDENCE - CORRESPONDENCEurban design, inc.
Adopted City Land Use Policies (including 25, 40, and 41) clearly indicate that
City participation in infrastructure costs in the northeast area is appropriate.
" Note: In the notes provided by Jon Ruiz from our March 24, 1994 meeting, he
states that the "City will work out concepts of what work needs to be
done, options for funding the work, and timing of funding.... If (the)
City and Developer come to agreement on these issues, (the) Developer
will not submit waivers to P&Z. Waivers will be requested if (the
parties) can't agree..." This is not exactly correct. It is entirely possible
that the City and the Developer will agree on a solution that will still
require a waiver from P&Z. It was also our understanding that the
applicant would be involved in determining the extent of the work
required, and the funding options.
Revised Land Use Breakdowns and Density Charts are attached. Reductions, color
renderings, and 10 sets of prints will be submitted by April 18th. Please distribute copies of
this letter to the staff members who attended the March 24th meeting.
Sincerely,
Eldon Ward, President
Cityscape Urban Design, Inc.
cc: Bill Reynolds, W.W. Reynolds Companies
Libby Glass, W.W. Reynolds Companies
Mike Blank, W.W. Reynolds Companies
Jack Blake, Stewart & Associates
David Love, Love & Associates
Armando Balloffet, Balloffet and Associates
Matt Delich
Lucia Liley, March & Myatt
April 14, 1994
City of Fort Collins
Planning and Zoning Board
P.O. Box 580
Fort Collins, CO 80523
Dear Board Members;
Co�y7p@P(A)
urban design, inc.
3555 stanford road, suite 105
fort Collins, Colorado 80525
(303) 226-4074
FAX (303) 226-4196
As discussed at the March 7th P&Z meeting, we have indicated 36' wide local streets
with 48' rights -of -way and - where applicable - 28' streets with 40' rights -of -way, on the
revised Preliminary PUD Site and Landscape Plan for Waterglen. The standard utility
easements adjacent to these streets will be 12' wide. It is our understanding that this reduced
right-of-way width has been proposed by City Staff for local streets throughout Fort Collins;
but this new standard has not yet been finally adopted. Technically then, we must request
a variance to allow the street right-of-way width that has been proposed by Staff. This letter
represents that request.
Thank you for your consideration.
Sincerely,
Eldon Ward, President
Cityscape Urban Design, Inc.
cc:, Bill Reynolds, The W.W. Reynolds Companies
Libby Glass, The W.W. Reynolds Companies
Jack Blake, Stewart & Associates
TRANSMITTAL LETTER
TO: Steve Olt
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
DATE:
April 14, 1994
PROJECT: Waterglen Preliminary PUD
PROJECT NO: 6552
We are transmitting the following:
co�n@ @ o
urban design, inc.
3555 stanford road, suite 105
fort collins, colorado 80525
(303) 226-4074
FAX (303) 226-4196
1 each Letter to the Planning & Zoning Board requesting a Variance on the Street
Right -of -Way Width
BY MESSENGER
Sincerely, Received by:
Cit scape Design, Inc.