Loading...
HomeMy WebLinkAboutWILDFLOWER RIDGE PUD UGA WAIVER COUNTY REFERRAL ..... 11 16 93 CITY COUNCIL HEARING - 75 93 - REPORTS - CITY COUNCILWildflower Ridge PUD Off -site Street Waiver Request - page 3 While the small incremental increase in traffic generated by this development seems intuitively evident, a traffic impact study prepared by Matthew Delich, P.E. has quantified this impact. The study considered the influence on traffic, not just of this development, but of all the residential development ultimately envisioned for the entire area to be served by Red Fox Road. The study concludes: (1) the existing configuration of WCR 38E is more than adequate to provide satisfactory levels of service for the traffic quantities involved; (2) at ultimate build -out, the traffic turning onto Red Fox Road from west -bound WCR 38E is sufficient to warrant a left- hand turn lane on WCR 38E. Wildflower Ridge is prepared to share the cost of building this recommended left-hand turn lane on WCR 38E with the developers of the remainder of the land served by Red Fox Road. E. The development will incorporate streets designed to urban standards and be responsible for an equitable contribution to improvements of .the adjoining street system to ensure that it will not create unsafe traffic conditions. The development will extend an urban sewage disposal system to the site so that it will not create undesirable sanitary conditions. The development will incorporate a stormwater detention basin to control increased stormwater runoff in an effort to avoid any adverse environmental influence in the area. Wildflower Ridge PUD Off -site Street Waiver Request - page 2 The site slopes gently from its high point in the southwest corner to its low point in the northeast corner where increased stormwater runoff due to the development will be collected in a stormwater detention basin and allowed to drain off at a rate no greater than that which currently exists, This should eliminate any potential for surface erosion and sedimentation. There are no known sources of pollution to contend with: the site has been used exclusively as cropland and grazing land. New development will, of course, need to be tested for natural ly-occuring radon gas infiltration. C. This waiver application is consistent with the intent and purposes of the Supplemental Regulations (Section 2.0 Par. 2.1 through 2.8) in that it is an attempt to achieve the orderly use and development of compatible land uses within the UGA. it can achieve the requisite capacities of infrastructural elements needed to serve the development. It complies with density requirements in the unique Foothills area of the Urban Growth Area. It conforms to urban design standards so that it may eventually be annexed without the need for additional capital improvements. D. Exceptional circumstances apply to this property which do not apply to other property in the UGA: the property is accessed by the existing West County Road 38E leading out of the City of Ft. Collins to Horsetooth Reservoir (an extremely popular recreational destination for many city residents), a number of mountain subdivisions, the town of Masonville, and the mountains beyond. While the system of collector streets which tie this development into the city street system is not fully developed to urban standards, it is a system which is used by numerous other residential developments, recreational traffic from the city to outlying areas, and intracity traffic. This subdivision will contribute incrementally to the traffic on this road system and is prepared to pay a street improvement fee (as stipulated in the Intergovernmental Agreement for the Ft. Collins Urban Growth Area) which represents its equitable share of the cost to improve the street system, just as other developments served by this street system in the past have contributed their equitable share of fees to the fund for street improvements. Wildflower Ridge PUD Public Street Capacity Waiver Request A. The waiver will not result in any unplanned public expense for provision of public services, improvements or facilities. It is totally consistent with the City and County's joint planning policy of encouraging infill development between existing developments within the Urban Growth Area in an effort to most efficiently use existing parks and recreational opportunities, utility and street networks to serve new development. Standards for all contemplated development conform to the County's urban street and site design criteria to insure that future annexation can occur without extensive future capital improvement costs. B. The proposed PUD complies with the County's Urban Growth Area requirements as well as the requirements of the Foothills overlay zone. In addition, residential development is grouped in a manner similar to the Cluster Development concept of the City of Ft. Collins' Foothills Area. Gross density falls within the prescribed limits of the County's Foothills overlay zone, while net density approximates that which the City deems desirable in its Cluster Development guidelines. Moreover, 74% of the lots are oriented to the south in an effort to encourage solar energy usage. Required open space is provided in one continuous band that surrounds the residential cluster and ties together with open space in the adjacent Fox Hills development as well as West County Road 38E to create a network of open space conducive to use by both residents and the wildlife which frequents this unique area close to the Front Range of the Rockies. Although not under the control of this development, this open space network should be easily extended through Fox Hills PUD Phase 2'to tie into the Community Park proposed directly to the south. The highest ground of the site is dedicated to open space in an effort to maintain development with as low a profile as possible. This is a response to the concern for how the development will be viewed by others in the city as they look towards the Front Range. File # UGA FORM 2 WAIVER REQUEST APPLICATION Date of Application:11-4-93 1. Development Name: WII� �OW15R R,l]c?r-- ()� Location: 2--7I.% W • G4lJl.V FZI>- 38 -f::, Owner: 'i�&RF-APA uPSKY Address Z, V) WLR\ 36 E Urban Growth Area Name: FT COWNS 2. Type of Waiver Requested (check one) Public Sewer Public Street Capacity 1/6th Contiguity Phone: 22-3 -4;9 2, 3. Please attach a typed report that fully answers the following questions: (5 copies) Check if submitted 7X a. Will the waiver result in unplanned public expense for provision of public services, improvements or facilities? L b. How is the waiver consistent with the intent and purpose of the County and adjoining municipalities' comprehensive plans and policies? Xc. How is the waiver consistent with the!intent and purposes of the Supplemental Regulations (See Article IV Para. A- H) d. What are the exceptional circumstances applying to the property which do not apply to other property located inside the Urban Growth Area? e. What actions are contemplated by the developer to insure that the waiver willnot create unsafe traffic conditions, undesirable sanitary conditions or adverse environmental influence in the area? 4. For public street capacity waiver request attach four (4).copies of a traffic analysis in the format approved by the County and City Engineers of ice. Check if traffic report submitted PRE-VtoOL`1 -0 all FLAtipiA)G SP Ft 5. I have read and consent to the minimum,waiver conditions (Article V, Paragraphs C. 2 & 3 Supplemental Regulations). LCPZ-116 (5/84) CIL i j DAL -Tom M. NNEAb srf. a FLA7r 8 H r �. ml� RESOLUTION 93-182 OF THE COUNCIL OF THE CITY OF FORT COLLINS AUTHORIZING A WAIVER FROM THE UGA PUBLIC STREET CAPACITY REQUIREMENT TO CONSTRUCT OFF -SITE STREET IMPROVEMENTS FOR WILDFLOWER RIDGE PRELIMINARY PUD WHEREAS, Section II, Paragraph 5 (b) of the Intergovernmental Agreement between the City of Fort Collins and Larimer County for the establishment of the Fort. Collins Urban Growth Area provides that the City Council shall have the right to review and comment upon development proposals which propose waiver requests to the phasing criteria for development in the Fort Collins Urban Growth Area; and WHEREAS, Larimer County has forwarded to the City Council for review and comment the waiver request for the "Wildflower Ridge Preliminary PUD", whereby it has been requested that a waiver be granted with respect to the public street capacity requirement, as set forth in the aforesaid, Intergovernmental Agreement; and WHEREAS, the "Wildflower Ridge Preliminary PUD" is located within the Urban Growth Area and qualifies as "in -fill" development in accordance with the aforesaid Intergovernmental Agreement, and therefore, is eligible for entitlement to the waiver of the requirement for public street capacity and one -sixth contiguity. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS that the Council hereby recommends to the Board of County Commissioners that the requirements of the Intergovernmental Agreement for the establishment of the Fort Collins Urban Growth Area, with respect to the public street capacity requirement as defined in the Larimer County Supplemental Regulations, be waived as that requirement is or may be applicable to the "Wildflower Ridge Preliminary PUD", with the following conditions: 1. The applicant and all future property owners commit to proportionate financial participation in funding future street improvements for adjacent and off -site streets in such manner and at such time as the governmental entity having jurisdiction may lawfully determine. 2. The waiver fee of $700 per developed acre, for a total fee.of $15,400, be collected at the time of building permit, issuance. Passed and adopted at a regular meeting of the Council of the City of Fort Collins held this 16th day of November, A.D. 1993. ATTEST: City Clerk DATE: November 16, 1993 I 2 ITEM NUMBER: 35 be required, given that this area has developed, to a large extent, through the County's Minor Residential Development (MRD) process, which does not require street improvements, and through subdivisions approved before the enactment of the UGA Agreement's development requirements. The intent of the waiver process is to avoid the imposition of unnecessary impediments to in -fill development proposals or sites. In -fill development sites are those in essentially developed portions of the UGA whose impact on existing services and facilities is relatively minimal. In -fill sites are differentiated, in the Larimer County Supplemental Regulations, from sites that require the extension of upgrading of basic infrastructure and other services and facilities, so that the development or use of the site can proceed (which, in the County's Regulations are referred to as "Sequential Development Proposals"). A joint traffic study for this project, and the Fox Hills PUD located to the south, was completed and reviewed by City and County traffic engineers. The study indicates a number of improvements to County Road 38E are needed, including left turn lanes and bicycle lanes, and will be required to protect public health and safety. These will be required as a condition of approval of the subdivision request. The Larimer County Commissioners may waive phasing criteria provided that: 1. The waiver will not result in unplanned public expense for provision of public services, improvements, or facilities; 2. The waiver is consistent with the intent and purpose of the County and adjoining municipality's Comprehensive Plan or Policies; 3. The waiver application contains materials indicating approval may be granted without substantial detriment to the intent and purposes of the Supplementary Regulations which apply to the area; 4. The waiver application contains materials indicating there are exceptional circumstances which apply to the specific piece of property which do not apply generally to the remaining property in the Urban Growth Area; and 5. The waiver application contains material indicating approval would not impair the public health and safety by creating undesirable traffic conditions, unhealthy sanitary conditions or adverse environmental influences in the area. This site is considered an in -fill site. The basic infrastructure needed to serve the site is in place or planned to be improved (the intersection of County Road 38E and Taft Hill Road will be improved using MPO funds). The waiver will not result in unplanned public expense for provision of public services, improvements, or facilities and is consistent with the intent and purpose of the County and adjoining municipality's Comprehensive Plan or Policies. Staff is recommending approval of the waiver request with the following condition: The waiver fee of $700 per additional lot be collected at the time of building permit. URBAN GROWTH AREA REVIEW BOARD: The waiver request will be considered by the Urban Growth Area Review Board at its December 1, 1993 meeting. AGENDA ITEM SUMMARY ITEM NUMBER: 35 DATE: November 16, 1993 FORT COLLINS CITY COUNCIL STAFF: Ken Waido SUBJECT: Resolution 93-182 Authorizing a Waiver from the UGA Public Street Capacity Requirement to Construct Off -Site Street Improvements for Wildflower Ridge Preliminary PUD. RECOMMENDATION: Staff recommends adoption of this Resolution. FINANCIAL IMPACT: A waiver to the public street capacity requirement results in the payment of a waiver fee of $700 per additional lot for development of this site, for a total of $15,400. EXECUTIVE SUMMARY: This waiver request pertains to the Wildflower Ridge Preliminary PUD, which consists of 23 single family lots (one with an existing residence on it) and two tracts of open space totalling 3.5 acres, on a total of 12.1 acres. The site is located 1/2 mile west of Taft Hill Road on the south side of County Road 38E. The site is zoned for single-family residential use and presently contains one residence. The site is not eligible for annexation because it does not meet the 1/6 contiguity requirements. City limits are presently located approximately 1/4 mile east of the site. In order for a property to be subdivided in the Urban Growth Area, it must be shown that the property will conform to the UGA Phasing Criteria. Of the four Urban Growth Area Phasing Criteria, the proposed preliminary plan meets the requirements for public water capacity, public sewer capacity, and 1/6 contiguity to existing development. A waiver is being requested for the requirements for public street capacity. Under the Phasing Criteria for public street capacity, the developer would be responsible for improving Red Fox Road from the site to County Road 38E, to current City local street standards, and for improving County Road 38E, an arterial street, from the site to Taft Hill Road. Improvements to Taft Hill Road to the Horsetooth/Taft Hill intersection would also be required. The addition of 22 homes in this area does not warrant the extensive improvements that would