HomeMy WebLinkAboutBOSTON CHICKEN PUD MAJOR AMENDMENT - 79 93B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: �ff;co- CL
Planner: Lc�C` c�2P l�%.r i� r TraM( Operations:
Engineer: ��r C�Uam��
Items Requested
Site land Plat Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility I Drainage Rpt Other hems Being Returned
Engineering
x
Stormwater
Water/Wastewater
C'.;e• Cr;' -
x
Traffic Operations
Trans. Planning
Tran*rt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Project: Date:
Planner: Traffic Operations:
Engineer:
Items Requested
EngineeringSiteI land Plat Utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat I Utility Drainage Rpt I Other Items Being Returned
Stormwater
Water/Wastewater
TraM( Operations
Trans. Planning
Trantrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
RoutingRevisions r
PROJECTMEN
..
ENGINEERING: PAVEMENT
.........
BUILDING
....
.......
-
:.•
....�.....
MAPPINGDRAFTING..........:::
ADVANCEPOLICE
...........STREETS
-
R.O.W. PLANNING
............
WATER CONSERVATION
............POST
�.
OFFICE
.........C..�.
PUBLIC...........DITCH
.
-
STATE HIGHWAY DEPARTMENT
COMPANY
1
RAILROAD:
.....�....::-'
' DOE
............=
..............
:::.......
.......:::::C
�:�......
..�