Loading...
HomeMy WebLinkAboutCOVENTRY SUBDIVISION FILING ONE FINAL - 80 93A - SUBMITTAL DOCUMENTS - ROUND 1 -JREngineering, Ltd. 6857 South Spruce Street Englewood, Colorado 80112 (303) 740-9393 • FAX (303) 721-9019 Mr. Ted Shepard City of Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80522-0580 Re: The Coventry Subdivision Dear Mr. Shepard: 6455 N. Union Blvd., Suite 202 Colorado Springs, Colorado 80918 (719) 593-2593 • FAX (719) 528-6613 March 7, 1994 Attached please find one copy of the Application form, a check to cover the filing fee, twenty-one (21) copies of the Final Plat, folded, ten (10) copies of the Utility plans (rolled), four (4) copies of the Final Drainage Report and Plan, and two (2) copies of the Soils Report, for the above referenced project for your review and comment. We have not included the final design for the proposed concrete box culverts under Hinsdale Road, or Crest Road, likewise we have not included the design for the additional 36 inch reinforced concrete pipe under Harmony Road. These have not been included since the City has not yet approved the recently completed drainage study performed by RBD, Inc. I have spoken with Mr. Glen Schleuter on this subject and he indicated that your review process could begin with the understanding that these plans will be completed in a timely fashion after the report has been approved by the City of Fort Collins. Thank you for all of the assistance you have given us with this project. Please do not hesitate to call if you have any questions. Sincerely, JR Engineering, Ltd. Stephen C. Jenkins, P.E. Project Manager