HomeMy WebLinkAboutCOVENTRY SUBDIVISION FILING ONE FINAL - 80 93A - SUBMITTAL DOCUMENTS - ROUND 1 -JREngineering, Ltd.
6857 South Spruce Street
Englewood, Colorado 80112
(303) 740-9393 • FAX (303) 721-9019
Mr. Ted Shepard
City of Fort Collins
Planning Department
281 North College Avenue
Fort Collins, Colorado 80522-0580
Re: The Coventry Subdivision
Dear Mr. Shepard:
6455 N. Union Blvd., Suite 202
Colorado Springs, Colorado 80918
(719) 593-2593 • FAX (719) 528-6613
March 7, 1994
Attached please find one copy of the Application form, a check to cover the filing fee, twenty-one
(21) copies of the Final Plat, folded, ten (10) copies of the Utility plans (rolled), four (4) copies
of the Final Drainage Report and Plan, and two (2) copies of the Soils Report, for the above
referenced project for your review and comment.
We have not included the final design for the proposed concrete box culverts under Hinsdale
Road, or Crest Road, likewise we have not included the design for the additional 36 inch
reinforced concrete pipe under Harmony Road. These have not been included since the City has
not yet approved the recently completed drainage study performed by RBD, Inc. I have spoken
with Mr. Glen Schleuter on this subject and he indicated that your review process could begin
with the understanding that these plans will be completed in a timely fashion after the report has
been approved by the City of Fort Collins.
Thank you for all of the assistance you have given us with this project. Please do not hesitate
to call if you have any questions.
Sincerely,
JR Engineering, Ltd.
Stephen C. Jenkins, P.E.
Project Manager