Loading...
HomeMy WebLinkAboutROBBINS MINOR SUBDIVISION - BDR180034 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSissuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/20/2018 11/20/2018: Light and Power does not currently serve this property with electricity. We may decide to take over this area at a later date, but as of now, we will not be your power provider. Thank you. Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 11/16/2018 11/16/2018: For Information: >PFA does not have any comments regarding the RePlat itself At is understood from the submitted information that no development will take place on the 6.1 acre residential Lot. Should further development be planned at a future date, then PFA may have comments on access and hydrant availability. No action required at this time. Department: Stormwater Engineering Contact: Dan Mogen, 970-305-5989, dmogen@fcqov.com Topic: General Comment Number: 1 Comment Originated: 11/05/2018 11/05/2018: No comments. Contact: Jesse Schlam, 970-218-2932, ischiam@fcgov.com Topic: Erosion Control Comment Number: 2 Comment Originated: 11/20/2018 11/20/2018: Information Only: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 31-1:1 V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit 3 further development at this time. In coordinating with City Real Estate staff, we are evaluating the requirement of the dedication at this time. The property owner would benefit from the dedication at this time, but requires further coordination. I've asked the ROW and utility easement to be shown on the revised survey plat. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcqov.com Topic: General Comment Number: 2 Comment Originated: 11/20/2018 11/20/2018: INFORMATION ONLY: The Boundary Line Adjustment provided is not necessary. We will not submit the boundary line adjustment as part of the final packet for approval. However, the surveyor needs to indicate the existing boundary line and the re -aligned north boundary line between the two parcels on the subdivision plat. Topic: Plat Comment Number: 1 Comment Originated: 11/19/2018 11/19/2018: FOR APPROVAL: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Comments were forwarded to King Surveying. Please see attached revised survey. S Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/20/2018 11/20/2018: FOR APPROVAL: Please schedule an onsite meeting with City Environmental Planning and Natural Areas staff to view limits of development and potential wetlands located at the site. Comment Number: 2 Comment Originated: 11/20/2018 11/20/2018: INFORMATION ONLY: For the portion of wetlands to remain on private parcel property, it may be necessary to get this portion of the wetlands professionally delineated at this time. Alternatively, it could be memorialized somehow now with the understanding that in the future if/when actual development occurs on the private lot, the wetlands on the private lot would need to be delineated and protected or mitigated according to Land Use Code standards (1:1 mitigation requirement). Wetlands, federal or otherwise would be protected and/or mitigated for. Let's discuss the approach further after the onsite visit. Stephanie B. and I toured the property. Subsequently it was decided to remove all references to wetlands from the plat. Please see Stephanie's additional comments in Accela regarding any future development. 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax ficgov.com/developmentreview November 21, 2018 Tawnya Ernst City of Fort Collins Natural Areas 300 Laporte Ave Building B Fort Collins, CO 80521 RE: Robbins Minor Subdivision, BDR180034, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Development Review Coordinator, Tenae Beane, at 970-224-6119 or tbeane@fcgov.com. Comment Summary: Department: Planning Services Contact: Clay Frickey, 970-224-6045, cfrickev@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/14/2018 11/14/2018: Please keep in mind the minimum side yard setback for an accessory building is 5 feet. It looks like one of the out buildings is very close to being closer than 5 feet from the new lot line. Ensure that no building is closer than 5 feet from the new lot line. I've communicated this to the surveyor and asked that it be noted on the final survey plat. Department: Engineering Development Review Contact: Dave Betley, 970-221-6573, dbetlev@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/20/2018 11 /20/2018: Submittal of a subdivision map is considered development under City Code. The submittal generally requires dedication of right of way and utility easements. The right of way requirement would be a total of 27.5 feet with a 15 foot utility easement. It is understood that the applicant does not have any