HomeMy WebLinkAboutROBBINS MINOR SUBDIVISION - BDR180034 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSissuance any issues arise please email erosion@fcgov.com to help facilitate
getting these permits signed off.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/20/2018
11/20/2018: Light and Power does not currently serve this property with
electricity. We may decide to take over this area at a later date, but as of now,
we will not be your power provider. Thank you.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 11/16/2018
11/16/2018: For Information:
>PFA does not have any comments regarding the RePlat itself
At is understood from the submitted information that no development will take
place on the 6.1 acre residential Lot. Should further development be planned at
a future date, then PFA may have comments on access and hydrant availability.
No action required at this time.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 11/05/2018
11/05/2018: No comments.
Contact: Jesse Schlam, 970-218-2932, ischiam@fcgov.com
Topic: Erosion Control
Comment Number: 2 Comment Originated: 11/20/2018
11/20/2018: Information Only:
No Comment from Erosion Control. Based upon the submitted Planning
Materials it has been determined that this project; will disturb less than
10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes
(greater than 31-1:1 V) within or adjacent to the project, and is not part of a
larger common development that will or is under construction. Therefore, no
Erosion Control Material submittal is needed. If this project substantially
changes in size or design where the above criteria now apply, erosion control
materials should be submitted. Though the project at this time requires no
erosion control material submittal, the project still must be swept and
maintained to prevent dirt, saw cuttings, concrete wash, trash & debris,
landscape materials and other pollutants from the potential of leaving the
site and entering the storm sewer at all times during the project in
accordance with City Code 26-498. If complaint driven or site observation of
the project seem not to prevent the pollutant discharge the City may require
the project to install erosion and sediment control measures. Nearby inlets
that may be impacted by the pollutants, in particular dirt, should be
protected as a good preventative practice and individual lots should be
protected from material escaping onto the sidewalk. If at building permit
3
further development at this time. In coordinating with City Real Estate staff, we
are evaluating the requirement of the dedication at this time. The property
owner would benefit from the dedication at this time, but requires further
coordination.
I've asked the ROW and utility easement to be shown on the revised survey plat.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcqov.com
Topic: General
Comment Number: 2 Comment Originated: 11/20/2018
11/20/2018: INFORMATION ONLY:
The Boundary Line Adjustment provided is not necessary.
We will not submit the boundary line adjustment as part of the final packet for approval. However,
the surveyor needs to indicate the existing boundary line and the re -aligned north boundary line
between the two parcels on the subdivision plat.
Topic: Plat
Comment Number: 1
Comment Originated: 11/19/2018
11/19/2018: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
Comments were forwarded to King Surveying. Please see attached revised survey. S
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/20/2018
11/20/2018: FOR APPROVAL: Please schedule an onsite meeting with City
Environmental Planning and Natural Areas staff to view limits of development
and potential wetlands located at the site.
Comment Number: 2 Comment Originated: 11/20/2018
11/20/2018: INFORMATION ONLY: For the portion of wetlands to remain on
private parcel property, it may be necessary to get this portion of the wetlands
professionally delineated at this time. Alternatively, it could be memorialized
somehow now with the understanding that in the future if/when actual
development occurs on the private lot, the wetlands on the private lot would
need to be delineated and protected or mitigated according to Land Use Code
standards (1:1 mitigation requirement). Wetlands, federal or otherwise would be
protected and/or mitigated for. Let's discuss the approach further after the
onsite visit.
Stephanie B. and I toured the property. Subsequently it was decided to remove all references to
wetlands from the plat. Please see Stephanie's additional comments in Accela regarding any future
development.
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
ficgov.com/developmentreview
November 21, 2018
Tawnya Ernst
City of Fort Collins Natural Areas
300 Laporte Ave Building B
Fort Collins, CO 80521
RE: Robbins Minor Subdivision, BDR180034, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickev@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/14/2018
11/14/2018: Please keep in mind the minimum side yard setback for an
accessory building is 5 feet. It looks like one of the out buildings is very close to
being closer than 5 feet from the new lot line. Ensure that no building is closer
than 5 feet from the new lot line.
I've communicated this to the surveyor and asked that it be noted on the final survey plat.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetlev@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/20/2018
11 /20/2018: Submittal of a subdivision map is considered development under
City Code. The submittal generally requires dedication of right of way and utility
easements. The right of way requirement would be a total of 27.5 feet with a 15
foot utility easement. It is understood that the applicant does not have any