Loading...
HomeMy WebLinkAboutALPINE BANK - PDP200020 - - VARIANCE REQUEST 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 • GallowayUS.com January 20, 2021 Spencer Smith, PE City of Fort Collins, Engineering – Development Review 281 N. College Avenue Fort Collins, CO 80524 RE: Alpine Bank at SEC of S. College & E. Prospect 1608, 1610, and 1618 S. College Avenue Fort Collins, Colorado Request for Variance from 15’ Wide Utility Easement to 10’ Wide Utility Easement which parallels S. College Avenue ROW Background Information Alpine Bank is currently under contract to lease approximately .96 Acres at the Southeast corner of S. College Avenue * E. Prospect Road in Fort Collins. Colorado. Property is more commonly identified as 1608, 1610, and 1618 S. College Avenue. Property consists of multiple lots which include three existing buildings. All three buildings either have been or are currently being used for commercial purposes. Two of the three buildings appear to have been designed for commercial purposes and are believed to have been constructed in the mid-1960s. The remaining building is a residential design and believed to have been constructed in 1928. All three properties are currently zoned General Commercial District (C-G) which allows for a variety of retail and commercial uses including “Offices, Financial Services & Clinics” as defined in the Zoning District Matrix of the City of Fort Collins Land Use Code. The proposed development would be subject to a Preliminary Development Plan (PDP), subsequent Type 1 Review and Public Hearing, and eventually a Final Development Plan (FDP). The decision maker for Type 1 Hearings is an Administrative Hearing Officer which is a land use attorney from outside of Fort Collins. In order to facilitate the proposed project, we anticipate the demolition of two of the three buildings and on-site relocation of the third building which has been identified as being ‘Architecturally Significant’ as the result of a Colorado Cultural Resource Survey completed in January 2020. The two buildings to be demolished are located at 1608 and 1618 S. College Avenue. The building to be relocated on-site is currently located at 1610 S. College Avenue and would be relocated to the South end of the site to better facilitate redevelopment of the northern portion of the property into a branch office for Alpine Bank. In addition to demolition of existing buildings and relocation of one building on site, the proposed development will also be required to dedicate 12’ of right-of way to facilitate the construction of a new deceleration/right-hand turn lane from north bound College Avenue to east bound Prospect Road. Right-of-way dedication will also include 8’ for a tree lawn as well as an additional 10’ easement to accommodate a new sidewalk and potential future utilities. The reduction in the overall width of the site in the east-west direction has necessitated the consideration of alternative parking, circulation, and access scenarios. Request for Variance We are requesting a variance from the 15’ wide utility easement as identified in details for Arterial Streets 7-1F, 7-2F, and 7-3F as found in the Larimer County Urban Area Street Standards (LCUASS). Compare to Standards As an alternate to the required 15’ utility easement, we are proposing an alternate easement width of 10’. We do not believe the reduction in easement width will have any impact on future capital maintenance requirements, costs, or design since most if not all utilities in the area are existing. For Alpine Bank S. College & E. Prospect January 20, 2021 Galloway & Company, Inc. Page 2 of 3 instance, the existing water main along College Avenue is already in place and will be located entirely in the ROW once the 20’ land dedication is complete. Please see exhibit below which illustrates both the 20’ (12’ deceleration lane and 8’ tree lawn) land dedication as well as the proposed 10’ utility and access easement. Justifications Given that most, if not all, utilities (wet and dry) are already constructed and operational in and around the property, we do not anticipate the need for additional utilities to be constructed in the future. As previously noted, an existing water main already exists along College Avenue and will be fully located within the ROW once the 20’ land dedication is completed. Dry utilities exist in the alley located e ast of Alpine Bank S. College & E. Prospect January 20, 2021 Galloway & Company, Inc. Page 3 of 3 the property and for the most part are already located underground. Based on the existing utility situation we do not believe a full 15’ of width will be required in the future and therefore request that the overall width be reduced to 10’. This additional 5’ of width not encumbered by an easement will allow for a more efficient site design which is already being compromised by a 20’ ROW dedication. We do not believe the reduction in width will be detrimental to public health, safety, welfare, and will not reduce the design life of any future improvement installed within the easement. The reduced width will continue to advance the public purpose by allowing improved pedestrian circulation along College while at the same time providing space for installation of future utilities along the ROW. We believe the proposed reduction in easement width will not diverge from the standards of the LCUASS Standards except in a nominal, inconsequential way, that will not impact future development. ROW improvements of infrastructure installation along College Avenue. Please review and let us know if you have any questions or require additional information. Thank you in advance for your consideration. Sincerely, GALLOWAY Zell O. Cantrell Site Development Project Manager Zell Cantrell@GallowayUS.com