HomeMy WebLinkAboutTOTAL PETROLEUM WEST PROSPECT NCU EXPANSION FINAL - 78 93 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT SUBMITTAL AND RESUBMITTALDEVELOPMENT NOTES:
1. TOTAL PETROLEUM, WEST PROSPECT is a proposed enlargement
of a building containing a non -conforming use. Specifically,
consists of the addition of an 8' x 16' toilet/
storage rooms.
2. The current facility does not have a public accessible toilet
room. The proposal is to add an 8' x 8' accessible toilet
room and an 8' x 8' storage room. The addition will be
attached to the East end of the building and match the current
building in appearance. Total additional square footage is
128 square feet.
3. Addition of the toilet/storage facility will not increase
traffic generation at the site. The addition is being
proposed to meet the Americans with Disabilities Act and to
provide storage for yard maintenance equipment.
4. The addition is being proposed at an existing impervious
area, so changes to storm water run-off will not occur.
Consequently, no impact to surrounding property is expected.
5. Property is currently, and shall remain, in the BL, limited
business, zoning district.
I
LAND USE DATA:
ZONING:
SITE AREA:
SITE COVERAGE
EXISTING BUILDING
PARKING AND DRIVES
LANDSCAPING
PROPOSED BUILDING
PARKING PROVIDED
STANDARD
HANDI-CAP
TOTAL
MAX. BUILDING HEIGHT
11
- BL, LIMITED BUSINESS
- 26,848 SO. FT. (0.62 ACRES)
- 828 SQ. FT (3.1%)
- 15,146.0 SQ. FT. (56.4%)
- 10,746.0 FT. (40.0%)
- 128 SQ. FT. (0.5%)
- 5 + 6 AT DISP. ISLANDS
- 1
12
- APPROX. 20 FT.