HomeMy WebLinkAboutBOSTON CHICKEN PUD FINAL - 79 93A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSi
ORT
T OF AN
k
RESTRICTEC
APPROVED
7W AS AN
'TELY
cD TO
JACENT
VICINITY MAP
��'�in41,VAeY
'IEW SITE STATISTICS
TOTAL SITE
NET SO FT
--AC
GROSS SO FT
AC
J PLAN. LOT 1 BOSTON CHICKEN
50455
1.1583
61713
1 4'67
LOT2 FAST FOOD RESTAURANT
37309
08565
44775
79
TOTAL
ATION AND -
87764
1 1583
106488 -
ING TO
ORDING
NET SO FT
%NET
GROSS SF
%GROSS
[VIEW
LOT 1.
BUILDING
3350
6.64
3350
543
A
STREET S DRIVES
29313
58 10
37.008
59.97
OPEN SPACE
SUBTOTAL
177792
21.35§
3460
5d455
61713
100
LUS,
THE
LOT 2.
NET SO FT
%NET
GROSS SF
%GROSS
D TWO IS
BUILDING
2500
6 70
2500
5 58
STREET S DRIVES
24319
1.8�
28785
64 29
OPEN SPACE
10490
28.1 �
13490
30.13
SUBTOTAL
37309
100
44 775
100
GTOTAL
NET SO FT
%.NET
GROSS SF
%,GROSS
BUILDING
5850
6.67
5850
549
STREET E DRIVES
53632
61.11
65 793
61 79
OPEN SPACE
28282
32.22
34845
3272
SUBTOTAL
87764
100
106488
10Q
LOT 1.
NET SO FT
BUILDING
3350
STREET&DRIVES
26103
UI'LN SPACL
21002
SUB TOTAL
50455
LOT 2,
NET SO FT
BUILDING
25M
STREET& DRIVES
21849
OPEN SPACE
1?w,n
SUBTOTAL
37309
TOTAL
BUILDING
NET SO FT
STREET & DRIVES
Saw
OPEN SPACE
47052
SUBTOTAL
33962
87764
PARKING
REQUIRED
LOT 1
50
LOT 2,
38
TOTAL
BB
r
%NET
' SO FT
3350"I
51 7
51 3
41.
33796
100
24565
61713
%NET
70
GROSS SO FT
5 56
2500
4
26315
100
IRQAO
44 775
%NET
6.67
GROSS SOFT
54.63
58506
3870
011340525
100
106488
PROVIDED
BICYCLE RACK
STANDARD
u
HANDICAP
.2
1
STANDARD
45
HANDICAP
4
1
95
t-1Naj- aAN/
„ dd
%GROSS
543
54 77
3980
100
%GROSS
558
5877
35 55
100
%GROSS
5.49
5645
3806
100
T
M =_�
ii
s �
'�■ I
Wll ��--FM
r- j
r
�lllyi�t��°flr
�..1. _
—-a�re- -x �iF. 7�+Ali7KaTif1R'Ti' _�j/.dl�'A�.'ie+T •
SCHLOTZSKY'S DELI
Salt Lake City, Utah (801) 255-3400
CJ J
------ - ----
SOUTHWEST ELEVATION
KALE: 1/1. l'-U.
SOUTHEAST ELEVATION
SCALE:
NORTHWEST ELEVATION
SCALE: 1/4 . 1'-0'
--- --------------------- r--
NORTHEAST ELEVATION
KALE. L<= 1'-0' -
WINDOW SIGN
FA-, = I' °
lotzskyIs
' FEBRUARY 11. +YYA
MONUMENT SIGN
KALE _ SCHLOWSKY'S
AT LEMAY &
PENNOCK PUD
ZriilGROUP
(r--t 04,
• � w
rRA.MYE_.EYLK W.0
...IIW-Ym,IM,.KY
YVA�WIWOLEI-�R.
-■
�iO�St�i�11Ii ��iiii;�f'aii
�
�MINE 0
�tl��ll�_I���1_?_e�������__�
Ell
ON
Mom
man
ME
IM
-- —
it--
-
MII.IfFIMfO%6 AKE;.J 1M1
WEST ELEVATION
SCALE 1 4 . i._0.
SOUTH ELEVATION
I H: 114'- 1'-0.
MONUMENT SIGN
w :Le'. 1a
i w�vz 6 pr
w���IOINI�11i IpK�
EAST ELEVATION
x 1/4'-Vo
NORTH ELEVATION
XAM: 1/4' . I'-V
BOSTON
CHICKEN
AT LEMAY & �
PENNOCK PUD I'� '
RIVERSIDE SHOPPING CENTER
f%ISE`N= NL1>IL
I ErvN
FBI
I
TREE PLANTING MNNTE•D AREA
VICINITY MAP
,ice... ems.
........,�.
41iM1B 0.M1iN0 EAGAlEO AIEI.
WtiB1 TfH R/J1TNfi
MRRLX BIBBR
FINAL LANDSCAPE PLAN
BOSTON
N
CHICX%I]U-.d
AT LEMAY & I
PENNOCK PUDI
GRO
P 'a ^R Imtomw,
\ \
.■ -
■
\\
Povdre
v
L
Lnx La
c'
\ \
�1CCnolip S�.
\
Y
C
_c
\
\
! V e r
fJ)
U
to u)"
C GO\
Q
\
F'VrJra it�i
4er.
C�
Laurel St
EaStdaie
Kenro
—
Pennock
CT
S/r \
ELIZABETH ST.
U)
N °
4 \
z
Garfi I
m
.St, �
>
>
h
z
<
Dcctor's Ln
Lu `c4fwa
E
2
s
�\
E
Q
euc
N
Uj
E•Pi t in
Buck
ke e c
St
5�
o
Z
v
c m
c
.� '+
r
t -' ! �► o !�
o
a
n
E. . am
o` ,,*e
P1.
..
'o j `n o
"
L "'
N <o/re
St.
. Lal e
w
E.
Pros p ct Rd.
ITEM: BOSTON CHICKEN PUD ,,
@ Lemay & Pennock -Final
North
NUMBER: 79-93A
Boston Chicken PUD at Lemay & Pennock, #79-93A
March 28, 1994 P & Z Meeting
Page 5
this planned unit development shall be deemed to be the date
that the condition is met, for purposes of determining the
vesting of rights. For purposes of calculating the running of
time for the filing of an appeal pursuant to Chapter 2,
Article II, Division 3, of the City Code, the "final decision"
of the Board shall be deemed to have been made at the time of
this conditional approval; however, in the event that the
dispute is presented to the Board for resolution regarding
provisions to be included in the development agreement, the
running of time for the filing of an appeal of such "final
decision" shall be counted from the date of the Board's
decision resolving such dispute.
Boston Chicken PUD at Lemay & Pennock, #79-93A
March 28, 1994 P & Z Meeting
Page 4
RECOMMENDATION
Staff finds that Boston Chicken PUD, Final:
1) Is in conformance with and meets the requirements of the All
Development Criteria of the Land Development Guidance System.
2) Is a compatible land use with the surrounding area.
3) Meets conditions of preliminary approval concerning building
materials and colors, entrance and parking lot configuration,
and provision of additional landscaping.
Therefore, based on these findings, staff is recommending approval
of Boston Chicken PUD, Final- #79-93A with the following condition:
1. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the development
agreement, final utility plans, and final P.U.D., plans for
the planned unit development be negotiated between the
developer and City staff and executed by the developer prior
to the second monthly meeting (May 23, 1994) of the Planning
and Zoning Board following the meeting at which this planned
unit development final plan was conditionally approved; or, if
not so executed, that the developer, at said subsequent
monthly meeting, apply to the Board for an extension of time.
The Board shall not grant any such extension of time unless it
shall first find that there exists with respect to said
planned unit development final plan certain specific unique
and extraordinary circumstances which require the granting of
the extension in order to prevent exceptional and unique
hardship upon the owner or developer of such property and
provided that such extension can be granted without
substantial detriment to the public good.
If the staff and the developer disagree over the provisions to
be included in the development agreement, the developer may
present such dispute to the Board for resolution if such
presentation is made at the next succeeding or second
succeeding monthly meeting of the Board. The Board may table
any such decision, until both the staff and the developer have
had reasonable time to present sufficient information to the
Board to enable it to make its decision. (If the Board elects
to table the decision, it shall also extend the term of this
condition until the date such decision is made).
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for
Boston Chicken PUD at Lemay & Pennock, #79-93A
March 28, 1994 P & Z Meeting
Page 3
evergreen and flowering shrubs are proposed as foundation and
accent plantings around the buildings and monument signs. Several
large existing trees along Lemay and in the detention area to the
north will be retained.
A significant amount of landscaping has been added to the plan in
response to a condition of preliminary approval. Reconfiguration
of the parking aisles, moving the buildings closer together, and
replacing several parking spaces along Lemay Avenue with landscaped
islands provided an increase in the amount of landscaped area. The
number of parking spaces has decreased from 105 to 95, which is an
adequate number of spaces for these uses.
Two free standing signs, with a base to match the buildings, will
be located on Lemay Avenue. The entire sign package will comply
with the City's sign ordinance.
The parking lot along Lemay Avenue is set back a minimum of 25'
from the flow line, separated from Lemay by two 10' landscaped
strips and a 5' detached walk which is compatible with the setbacks
along Lemay across the street. The buildings are setback
approximately 70' from Lemay Avenue with the drive-thru lanes
situated on the north and east sides.
3. Transportation
A traffic impact analysis for the site was submitted and has been
reviewed by the City Transportation Division staff. Staff finds
that this request is feasible from a traffic engineering
standpoint. There will eventually be a traffic signal at the
Lemay and Pennock intersection, which will ultimately control the
entrance drive to this site. The applicant is negotiating with the
City to have the traffic signal installed with this development.
Both the Planning and Transportation Department staff are working
with the surrounding property owners to develop a system of cross
access connections to the north, east and south. City Staff
believes that cross access points are important to enable
properties in this area to be connected, for vehicular and\or
pedestrian use. Staff will continue to work with the property
owners to facilitate construction of these access points.
From a Transportation point of view, the revised configuration of
parking lot and aisles is not ideal as far as providing the safest
and most efficient route for cross movements across this property.
Engineering staff's concerns about geometrics of the entrance and
parking aisles and a condition of preliminary approval, concerning
layout and dimensions of drive aisles and entrance drive, have been
addressed.
Boston Chicken PUD at Lemay & Pennock, #79-93A
March 28, 1994 P & Z Meeting
Page 2
�G iaEZk"
1. Background
The surrounding zoning and land uses are as follows:
N: BP; Lemay Animal Hospital and Fries Carwash and Lube;
S: C; Godfathers Pizza and Hospital 66 service station;
E: BP; Northern Colorado Kidney Center, medical offices,
Vineyard Christian Church, and vacant;
W: C; Existing commercial, retail, fast food, and medical
offices (Riverside and Lemay Shopping Center).
The site is currently vacant and undeveloped.
2. Design
The proposal consists of two fast food restaurant pad sites for
Boston Chicken and Schlotzsky's, adjacent to an existing fast food
restaurant (Godfathers Pizza). The building elevations are
designed to be compatible with each other and compatible with the
surrounding area. The use of externally illuminated awnings, using
goose neck fixtures, in similar color schemes, and the use of
complimentary building materials and colors, provides a unified
development. The awnings of the Boston Chicken have been broken up
into short sections, as was done at the South College Boston
Chicken restaurant (Matterhorn PUD). Schlotzsky's has a single
awning over the entrance.
Primary accent colors for the Boston Chicken building include reds
and grays. Red and greens are the primary accent colors for
Schlotzsky's. The Godfather's Pizza restaurant, to the north, uses
a red accent color. A condition of preliminary approval, that
final building elevations and samples of proposed materials be
submitted to the Planning Department for review and that Criterion
A-2.7- Architecture of the All Development Chart of the LDGS be
addressed prior to final, has been met.
The maximum height of the buildings is 30' (actual height is
approximately 201).
All mechanical equipment and trash receptacles will be either
enclosed within the building or will be adequately screened from
public view.
Site landscaping consists of shade trees and evergreen and
deciduous shrubs along Lemay Avenue and a mix of ornamental and
evergreen trees and evergreen and deciduous shrubs throughout to
enhance the aesthetic character of the site. A variety of
ITEM NO. I R
MEETING DATE 3/28/94
STAFF Ki r-tPn Whetstone
PLANNING AND ZONING BOARD
J
STAFF REPORT
PROJECT: Boston Chicken PUD- Final, #79-93A
APPLICANT: Boston Chicken
c/o ZTI Group
1220 S. College Avenue
Fort Collins, CO 80524
OWNER: Boston Chicken Inc., A Delaware Corp.
1804 Centre Point Dr. Suite 106
Naperville, Illinois 60563
PROJECT DESCRIPTION:
This is a request for a final PUD for 6,000 square feet of fast
food restaurant uses on two pad sites. Both restaurants have
drive-thru lanes. The 2.01 acre site is located on the east side
of Lemay Avenue, north of Elizabeth Street and southwest of
Riverside Drive. The property is zoned BP, Planned Business.
RECOMMENDATION: Approval with condition
EXECUTIVE SUMMARY;
The applicant proposes two fast food restaurant pad sites on a 2.01
acre site for a Boston Chicken restaurant and a Schlotzsky's Deli.
Both restaurants have drive-thru lanes. The architectural
character of the two buildings is complimentary and is compatible
with the existing buildings in the area. Similar building
materials and complimentary fabric awnings with external lighting
are proposed for the two buildings. Landscaping consists of street
trees, ornamental trees, evergreen trees and shrubs and deciduous
shrubs. The large existing trees on either side of the proposed
entry drive, and in the detention/open space area to the north,
will be retained. Primary access to the site is from Lemay Avenue
across from the future signalized Pennock and Lemay intersection.
The PUD meets applicable criteria of the All Development Point
Chart of the Land Development Guidance System. A condition
regarding signing and execution of utility plans and development
agreement are recommended.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT