Loading...
HomeMy WebLinkAboutBOSTON CHICKEN PUD FINAL - 79 93A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSr Additional landscaped islands should be added along Lemay, as well as in the interior of the site. 22. Drainage comments will be forwarded under separate cover. If you have questions, please contact Basil Hamdon or Glen Schlueter at 221-6589. 23. Please include the energy conservation information in note form on the site plan, following note #14. This concludes staff comments at this time. In order to stay on schedule for the March 28, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due March 9th by noon (4 sets of plans and written documentation responding to the above concerns). PMTs (one PMT of each plan sheet), colored renderings, and 8 prints are due March 21. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUD's. If not, a condition will be placed on the project giving you 30 days to finalize the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221-6750. Thank you. Sincerely, Kirsten Whetstone, AICP Project Planner cc: Kerrie Ashbeck, Engineering Department Stewart and Associates a f 10. Please refer to redlined utility plans and landscape plan for comments from the City Water and Wastewater Utility. 11. The Mapping Division of City Engineering has found some errors on the plat. The acres in the "legal" are not correct. The 15' distance near the NW corner of the plat should be moved down to the easement line. The plat must state the scale of 1"= 301 . 12. A soils report was not submitted. Please contact Mike Herzig or Kerrie Ashbeck for information about the required soils report. The project can not advance to the final Planning and Zoning Board hearing without the soils report. 13. Additional details are needed for the site curb, gutter, and walk installation. 14. Please submit a plan for the interior drive pattern/striping plan. Use turning templates to establish driveway geometry. It appears that the building could be shifted to the east and that the row of parking behind the building could function as a one-way. 15. Engineering would like to discuss the Pennock/Lemay intersection, site circulation, . stacking space for drive-thru lanes, future connection locations, etc. 16. Please refer to additional comments on the utility plans, which have been sent to your project engineer. 17. Please include a note on the landscape plan that existing trees shall be pruned to City of Fort Collins medium prune standards. The landscape plan does not show the location of specific trees/shrubs. The key and plan need to be related. 18. Please provide bike racks for both restaurants. Planning would like to discuss the pedestrian/bike circulation system with you. There should be a safe way for pedestrians to get from the sidewalk along Lemay and from adjacent properties to the restaurants. 19. The site and landscape plans need to reflect the future curb cuts with islands. No landscaping should be shown and the access points, on this property, should be constructed with this development. 20. Staff would like to meet to discuss the architectural details for the two projects. The building, roof, and awning colors should be complimentary, if not the same. The Boston Chicken on South College is proposing a maroon, off-white, and gray awning which staff would like to see on this building. If this is the case, the bright reds and greens of Schlotzsky's would not be compatible. Staff would like the awning colors to be the same tones, i.e., same reds, grays, blacks, etc. Please submit samples with your revisions. 21. The Planning and Zoning Board has concerns about the setback from Lemay to the parking lots, the amount of asphalt on the site, and circulation through the site. Commum,f Planning and Environmental Svrvices J `- Planning Department City of Fort Collins March 2, 1994 Ed Zdenek ZTI Group 1220 S. College Ave. Fort Collins, CO 80524 Dear Mr. Zdenek, City Staff has reviewed your submittal for Boston Chicken at Lemay and Pennock PUD- Final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. The developer is responsible for providing conduit or trench for telephone facilities within the project. Please refer to the US West Communications engineer for more information (303-224-7470) Provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 4.. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 5. The developer may choose to provide joint trench for electric, television, and telephone cables. In this case the developer coordinates the placing sequence of each utility. 6. You will need to coordinate a transformer location with Light and Power. Please contact Bruce Vogel at 221-6700. 7. Relocation of streetlights is at the developer's expense and is in addition to normal Light and Power development charges. 8. Please reword note number 6 on the Site Plan to read, "All signs must comply with the City Sign Code. Sign permits are required for all signage and are obtained through the City Building Department." 9. The ID sign must be a minimum of 15' from any side lot line (property line). 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750