Loading...
HomeMy WebLinkAboutINDIAN HILLS VILLAGE PUD AMENDED FINAL - 81 93C - CORRESPONDENCE -PROJECT COMMENTSHEET city of Fort collim DATE: Z/-)�-,7�-DEPARTMENT: ITEM: -7brl)) 10,1' , . cl� ����5 oh. Please res o-this-p ec - " P No Problems Problems or Concerns (see below) Please provide a detail of the transition into Spring Creek for the three proposed pipe outlets. The detail should include the distance between the outside diameters of each pipe. Please show the bank of Spring Creek and how it will be repaired after the installation of the,storm sewer. The existing 8" sanitary sewer is in close proximity to the proposed storm sewer. Please show a profile of this 8" line with concrete encasing 10' on each side. Please provide documentation behind the water surface.elevation of Spring greek of 65'. Is this the WSL at the peak discharge of Spring Creek ? The calculations by Ayres used the discharge of Spring Creek at the time of peak discharge from Indian Hills Village. Please show the HGL that was calculated by Ayres. Date: �t /�7 �/9 Signature: CHECK IF REVISIONS REQUIRED: ❑ 13 El 13 PLAT SITE LANDSCAPE UTTILM PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 AfRES ASSOCIATES November 8, 1996 Mr. Jeff Butler Wonderland Custom Builders 745 Poplar Avenue Boulder, Colorado 80304 Re: Indian Hills Village Foundation Elevations Dear Jeff. In response to your request, we surveyed the elevations of existing home foundations on lots 33, 35, and 37 of Indian Hills Village PUD, Replat A on November 7, 1996. The following table summarizes our findings: Lot First Floor Elevation Shown on Approved Grading Plan First Floor Elevation Shown on Vaught-Frye's Foundation Plan As -Built First Floor Elevation' 33 73.0 75.2 75.3 35 72.5 73.2 74.4 37 72.0 72.2 74.6 Estimated assuming the first floor elevation is 14 inches higher than the top of the existing foundation wall. Please call me if you need additional information. 'ncerely, en Ayres'& Associates, Inc. Asc ott Quee P.E. Civil Engine r SQ:sp cc: Mr. Steve Olt, City of Fort Collins Planning Mr. Basil Harridan, City of Fort Collins Stormwater Utility Owen Ayres & Associates, Inc. Engineers/Scientists/Surveyors 3665 JFK Parkway. Building 2, Suite 300, P.O. Box 270460. Fort Collins, CO 80527 BUTLER11.11-TR (970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-5578 34-0237.01 Printed on recycled paper