Loading...
HomeMy WebLinkAboutINDIAN HILLS VILLAGE PUD AMENDED FINAL - 81 93C - CORRESPONDENCE - STAFF'S PROJECT COMMENTSUtility Plans Cover sheet • Add 'Tract B' to title. Sheet 2, Grading, Drainage and Erosion Control Plan • Indicate where one can find'original' drainage report. • Highlight revised grading and drainage facilities (this helps define the changes). Sheet 3, Indian hills Circle Street Plan, Profile and Details • Refer to Soils Report that provides information regarding the street structural design. • Define concrete pavement limits as to slope at curb and gutter. • Indicate stationing on plan view. Sheet 4, Driveway'G' Street Plan and Profile. • Refer to Soils Report that provides information regarding the street structural design. mayWindianhi.amf Citv of Fort Collins Current Planning PROJECT COMMENT SHEET DATE: 21 March 1995 DEPARTMENT: G�g (new PROJECT: 81-93C INDIAN HILLS VILLAGE PUD - AMD. FINAL PLANNER: Steve Olt All comments must be received by: Friday, 31 March 1995 ❑ No Problems Problems or Concerns (see below) Site Plan • Title should include'Tract B. • Add legal description. • Six duplexes are called for only five are shown. • Highlight replat area. Plat • Show with of Pedestrian, maintenance, landscape, utility and drainage easement across lots 41 and 42. (Continued) 4 Date: " r "� R5 Signature" CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY COMMUNITY PLANNING and /S ENVIRONMENTAL SERVICES. . . Lal twmm Cut ursq r., r.u.nuA oau runt a uuuinn, �.vLvtcnw aura o-u�ou-�nu��cc a-v 0 CURRENT PLANNING DEPARTMENT !i v 16. An apparent path through Lots 41 & 41 on the Site Plan does not match the path on the Landscape Plan. -They should be consistent. 17. There apparently is some information missing at the end of the first item under Solar Orientation Ordinance on the Site Plan (Lots are designated by: ..... ). This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the May 22, 1995 Planning and Zoning Board.hearing: ****************************************************************** Plan revisions are due no later than the end of the working day, May 3, 1995. Please contact me for the number of folded revisions required for each document. PMT•s, renderings, and 8.folded copies of final revisions (for the Planning and Zoning Board packets) are due by 3:00 p.m. on May 15, 1995. Please contact me at 221-6750 if you have questions or concerns related to these comments. 2 would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. ASincely, Steve Olt Project Planner xc: Kerrie Ashbeck Stormwater Utility Transportation file/Project Planner F-�f%-_tt �ifl� { I C. Daemian Drive must be vacated by separate document, with that vacation reception number shown on this plat. d. There is a question as to whether a "private drive" can be vacated by a plat. What about the rights to that drive held by the other lots not included within the replat? Maybe this plat needs a signature block or note with a sianoff for the vacation. Please contact Jim Hoff or Wally Muscott if you have questions pertaining to these comments. They both can be reached at 221- 6605. 7. The Homeowners Association will be responsible for the maintenance of the sidewalk in Tract B along East Stuart Street. 8. The street tree placement needs to conform to the City-s, street light/trees separation standards. 9. The Water/Wastewater Department comments have been returned to Ayres Associates on a red -lined copy of the utility plans and to Ripley Associates on a red -lined copy of the Landscape Plan. 10. There are water conservation standards for landscaping that are being provided on a copy of the project review comment sheet (attached to this letter). 11. How many duplexes are there going to be? The Site Plan shows Lots 3 & 41 9 & 10, 13 & 14, 24 & 25, and 39 & 40 as duplex dwelling units (10 dwelling units); however, the Unit Tabulation indicates 6 duplexes (12 dwelling units). 12. How will the proposed drainage along the Busch Court homes impact the no disturbance zone for the existing trees along the west property line? 13. The storm drainage outfall from this property under East Stuart Street could be a problem. The outfall is going to be hard to meet and there could be a problem with stormwater backing up into this development. 14. The finish floor grades for Lots 46 and 47 have apparently been raised approximately 3' from what was previously planned. This could present a problem with the expectation of the adjacent property owners in Busch Court. It will also change the character of that portion of the development. 15. General Note 4 on the Site Plan states that Lots 40 and 47 shall be one story residences. Please refer to the previous comment about Lot 47. Also, Lots 39 & 40 are shown as duplexes. Does this mean that Lot 39 will automatically be .a one story residence? Comn ity Planning and Environment, Current Planning April 10, 1995 Paul R. Barker Ayres Associates 3665 J.F.K. Parkway, Building 2, Suite 300 Fort Collins, CO. 80525 ervices Dear Paul, Staff has reviewed your documents for the Amended Indian Hills Village P.U.D. (Lots 35-43) that were submitted to the City on March 20, 1995, and would like to offer the following comments: 1. U.B. West indicated that they had concerns but did not include any on the comment sheet that they returned to me (copy attached). I suggest that you contact Mr./Ms. Weaver directly to find out if there are, in fact, concerns that you should be aware of. 2. Public service company has indicated that the easement across Lot 43 (adjacent to Indian Hills Circle) needs to be 14.5' wide. It's already tight due to the unique design of this development, and a 9' wide easement is totally unacceptable. An option is to serve Lots 41-43 from a proposed main in the abandoned portion of Daemian Drive. 3. The building envelopes on Lots 41-43 need to be clarified: i.e. - what is the side setback, what is the rear setback? 4. A note must be added to the Landscape Plan stating that the landscaping must be completed prior to issuance of a certificate of occupancy or a letter of credit (or other form of acceptable collateral) be provided. 5. A copy of the comments received from the Building Inspection Department is attached to this letter. 6. The Mapping/surveying Department has the following comments to offer: a. Lots 41, 42, and 43 will be addressed on Indian Hills Circle. b. How wide is the easement running east/west across Lots 41 and 42? This should be shown on the Subdivision Plat and Site Plan. 281 North College Avenue • I'.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002