HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - CORRESPONDENCE - (3)August 31, 1995
Mr. Mike Herzig
Engineering Department
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
z !wa
7rr
& Associates, Inc.
teo u r c e c o n s u l t a n t s
2995 Centergreen Court South. Sulte C
Boulder, Colorado 80301-5421
Phone (303) 4403439
FAX (303) 4403035
REF: 9333K - WATERGLEN PUD - FINAL ENGINEERING SUBMITTAL
Dear Mike:
On behalf of our client, W.W. Reynolds Company, we are hereby transmitting to the City of Fort
Collins the final engineering plans for the Waterglen PUD project. The following items are being
transmitted:
• 3 sets of the "Waterglen PUD Infrastructure" Construction Drawing Package includes
Plat drawing.
• 3 sets of Phase 1 and 2 Construction Drawings
• 1 set of "Water PUD Utility Construction Drawings"
• 3 copies of the "Waterglen PUD Stormdrainage, Floodplain, Erosion Control Plan,
Wetland - 404 Permit, Groundwater Issues, FINAL REPORT"
We are also transmitting to you the City's marked up redline review copies from our October,1994
submittal, including drawings packages and reports. We have incorporated changes to our designs
and reports based upon these comments.
With this submittal, we are hereby requesting final approval. Please let me know as soon as
possible if you have any questions or require additional information. Thank you and your staff for
all of your assitance to date. We look forward to receiving your final approval.
Enclosures
cc: Jerry Lee - WW Reynolds Company
Eldon Ward - Cityscape
Sincerely,
LOVE & ASSOCIATES, INC.
By- )
Z:�r
.Love, �.E.