Loading...
HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - CORRESPONDENCE - CITY STAFF (3)PROJECT City of l cobs COMMENT SHEET DATE: 11 Oct 1994 DEPARTMENT: P443 Mara ' PROJECT: Waterglen PUD PLANNER: Kerrie Ashbeek *Note, This is a previously submitted project in which significant changes have been made, Therefore these plans supersede the previous submittal. Please respond to this project by Wednesday, 26 October 1994 ❑ No Problems E] Problems or concerns (see below) s)Tc !.. iLL .v6co 1 �i (�A;E2 Tqp Ac 3 "Ac;-=R T /OP I=o2 iRR�G p 7 u, i il,Eto W Uu c ro /3E G+fin Tv i✓AvE T.V4St L`kTE/v040 Q c yen 0 rT2EGT FG2 ou R F�CTI C,2� 1Hvurl- uP Z) P102k SiTc SNUy� cd /!Ol b 19CCESJ Fa/Z 1`441-Le LE SI✓vuLO A R�.ST,4a�n, F.f� PLAcc%� /J; 7,h'6 %�/J/� TI9/� 3.) E-IrWOLcL-0 TP �LECTR/GAL s 2wc>= �� �ARk �C7�A/v/VI /VGN i S`TiOrF N�E,oJ /+foR6 /lt9Eos /�-Pl.T /t?p f �2E'/� Lri //b SLuPE io P.ORic,rc FAR P,oI�Signatu q CHECK IF YOU WISH TO RECEIVEPLATCOPIES SITE OF REVISIONS: 0 LANDSCAPE 0 UTILITY COMMUNITY PLANNING & ENVIRONMENTAL. SERVICES 281 NORTII COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO :013)221-6750 • PLANNING: DF.P,Ur9'N1F.N'I' .. I \ MEMORANDUM DT: September 11, 1995 TO: Sheri Wamhoff, Civil Engineer FR: Randy Balok, Park Planning RE: Waterglen Comments After reviewing the recent plans for Waterglen PUD, it appears that our previous comments on the proposed park site have not been incorporated. A copy of the November 2. 1994 comments are attached. ♦ Additionally, the drainage swale at the east side of the proposed park may need to be in an easement. ♦ The Anheuser Busch overflow of 70 C.F.S., where does it go, does it cross proposed park site, how often does this occur? ♦ Park grading should be at least 1%. ♦ We would like to see a cross section of the swale I first mentioned. ♦ We need to have a discussion with the Stormwater Engineers on this area before we proceed. ♦ We need a proposal from the developer on how the park proposal is going to be handled. attachment