HomeMy WebLinkAboutWATERGLEN PUD - FINAL - 71 93B - CORRESPONDENCE - CITY STAFF (3)PROJECT
City of l cobs COMMENT SHEET
DATE: 11 Oct 1994 DEPARTMENT: P443 Mara '
PROJECT: Waterglen PUD
PLANNER: Kerrie Ashbeek
*Note, This is a previously submitted project in which significant changes have
been made, Therefore these plans supersede the previous submittal.
Please respond to this project by Wednesday, 26 October 1994
❑ No Problems
E] Problems or concerns (see below)
s)Tc !.. iLL .v6co 1 �i (�A;E2 Tqp
Ac 3
"Ac;-=R T /OP I=o2 iRR�G p 7 u, i il,Eto W Uu c ro /3E G+fin Tv i✓AvE
T.V4St L`kTE/v040 Q c yen 0 rT2EGT FG2 ou R F�CTI C,2� 1Hvurl- uP
Z) P102k SiTc SNUy� cd /!Ol b 19CCESJ Fa/Z 1`441-Le LE
SI✓vuLO A R�.ST,4a�n, F.f� PLAcc%� /J; 7,h'6 %�/J/� TI9/�
3.) E-IrWOLcL-0 TP �LECTR/GAL s 2wc>=
��
�ARk �C7�A/v/VI /VGN
i
S`TiOrF N�E,oJ /+foR6
/lt9Eos
/�-Pl.T
/t?p f �2E'/� Lri
//b SLuPE io P.ORic,rc FAR
P,oI�Signatu
q
CHECK IF YOU WISH TO RECEIVEPLATCOPIES
SITE
OF REVISIONS:
0
LANDSCAPE
0
UTILITY
COMMUNITY PLANNING &
ENVIRONMENTAL. SERVICES 281 NORTII COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO :013)221-6750
• PLANNING: DF.P,Ur9'N1F.N'I' ..
I \
MEMORANDUM
DT: September 11, 1995
TO: Sheri Wamhoff, Civil Engineer
FR: Randy Balok, Park Planning
RE: Waterglen Comments
After reviewing the recent plans for Waterglen PUD, it appears that our previous
comments on the proposed park site have not been incorporated. A copy of the
November 2. 1994 comments are attached.
♦ Additionally, the drainage swale at the east side of the proposed park may
need to be in an easement.
♦ The Anheuser Busch overflow of 70 C.F.S., where does it go, does it cross
proposed park site, how often does this occur?
♦ Park grading should be at least 1%.
♦ We would like to see a cross section of the swale I first mentioned.
♦ We need to have a discussion with the Stormwater Engineers on this area
before we proceed.
♦ We need a proposal from the developer on how the park proposal is going to
be handled.
attachment