Loading...
HomeMy WebLinkAboutBOSTON CHICKEN PUD PRELIMINARY - 79 93 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTLOG OF BORING NO. 3 page 1 of 1 CLIENT ARCHITECT/ENGINEER Boston Chicken Inc. ZTI Group SITE Lemay Avenue PROJECT Fort Collins, Colorado Boston Chicken Rotissorie Restaurant SAMPLES TESTS o C . J o a J X z H� W a- H DESCRIPTION r U) � Z\ = 2 W � i cn 1m- O Zz crHJ (L I-- U) toW O 3 U) O W W H a. a. L) E= d V F-O H >_LL. L)WLL Hr_\ W U) O Y W a-J O OCU ZHU) I—HJ W Approx. Surface Elev.: 101.5 ft. o m z �-R Nm E as mwa ¢JJ 1 SS 12" 6 16.2 FILL -Sandy lean 2 SS 12" 13 clay with cinders 34/17/17 Brown, moist vn 6.5 SANDY LEAN CLAY Brown, moist, medium 10.0 WELL GRADED —['RAVEL WITH SAND rown, moist, dense BOTTOM OF BORING 3 SS 12" 10 110.8 5 PA 95.0 4 SS 12" 12 15.5 91.5 110 5 I SS 1 12"I 30 15.3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS BORING STARTED 11-15-91 WL g None W.D. = None A.B. Empire Laboratories BORING COMPLETED 11-15-93 WL Incorporated RIG CME-55 FOREMAN RLL WL Division of Terracon APPROVED IVR$ JOB N 20935290 Checked 2 days A.B. 0 e LOG OF BORING NO. 2 Page 1 of 1 CLIENT ARCHITECT/ENGINEER Boston Chicken Inc. ZTI Group SITE Lemay Avenue PROJECT Fort Collins, Colorado Boston Chicken Rotissorie Restaurant SAMPLES TESTS � > o r, o 0 • LL M z H F- H DESCRIPTION } cn W w z� o w LLO x a E a H U co.� F-o oLL cimu_ W N o} w a 03 o o: z 1-Cn Approx. Surface Elev.: 100.5 ft. 0 o z f- W mm E a. oa oinL :^".^: 0.5 6" TOPSOIL 100.0 1 SS 12" 13 7.2 CANDY LEAN CLAY Brown, moist, stiff 5 PA 2 ST 12" 1 4.1 106 1 1430. 3 1 IS 12" .9 1 7.1 7.5 93.0 4 IST 1 12" 4.1 5 IS 112" 26 2.9 PA WELL GRADED GRAVEL WITH SAND AND COBBLES Tan, dry, dense to extremely dense BOTTOM OF BORING 10 = 85.61 6 I IS 112"I 44 16.2 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS Empire Laboratories Incorporated Division of Terracon BORING STARTED 11-15-91 WL g None W.D.IT 14.5 A.B. BORING COLLETED 11-15-93 WL RIG CME-55 FOREMAN IRLL LWL Checked 2 days A.B. APPROVED PjRS JOB k 20935290 (0 LOG OF BORING NO. 1 Page 1 of 1 CLIENT ARCHITECT/ENGINEER Boston Chicken Inc. ZTI Group . SITE Lemay Avenue PROJECT Fort Collins, Colorado Boston Chicken Rotissorie Restaurant SAMPLES TESTS to Z O z W Li r F- Y M = O U W OR � W z U) 3 FO dJ in no � W M H N H O E > U) z O YLL a:U Da a z S HH z z ow L)XLL ZL-tn oEna W W _i cn J Ln WWLL :xmu) vno-a o 0 J H = LL 0 DESCRIPTION r Approx. Surface Elev.: 100.1 ft. r, U_ 2 F- d W o o 03 } U)W Ln U (n o FILL -Sandy lean clay 1 SS 12" 15 9.0 1.0 Brown, moist 99.1 SANDY CLAY PA LEAN Brown, moist Very stiff to hard 235 2 ST 12" 8.3 105 7350 3 SS 12" 33 7.9 5--PA 8.5 91.6 4 SS 12" 32 5.8 WELL GRADED GRAVEL. PA WITH SAND AND COBBLES Tan, dry to moist 10 Dense to extremely dense c 4 5 SS NR 50/9 14.9 85.2 BOTTOM OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS BORING STARTED 11-15-91 Empire Laboratories U None WD• None A.B. BORING COMPLETED 11-15-93 Incorporated Division of Terrdcon FJOBWL WL RIG CME-55 FOREMAN RLL R I Checked 2 days A.B. APPROVED jvRs a 20935290 ��� �... pro?EUf t� • z°g3s2�o N o bus 3�i Empire Laboratories, Inc. f The Terracon Companies Inc. A Drvison o i Boston Chicken Colorado Terracon ELI Project No. 20935290 The analyses and recommendations in this report are based in part upon data obtained from the field exploration. The nature and extent of variations beyond the location of test borings may not become evident until construction. If variations then appear evident, it may be necessary to reevaluate the recommendations of this report. Our professional services were performed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable geotechnical engineers practicing in this or similar localities. No warranty, express or implied, is made. We prepared the report as an aid in design of the proposed project. This report is not a bidding document. Any contractor reviewing this report must draw his own conclusions regarding site con*ditions and specific construction techniques to be used on this project. fThis report is for the exclusive purpose of providing geotechnical engineering and/or testing information and recommendations. The scope of services for this project does not include, either specifically or by implication, any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such contamination, other studies should be undertaken. We are available to discuss the scope of such studies with you. 16 � 1 Boston Chicken Colorado Terracon ELI Project No. 20935290 Additional Design and Construction Considerations: • Exterior Slab Design and Construction: Exterior slabs -on -grade, exterior architectural features, and utilities founded on, or in backfill may experience some movement due to the volume change of the backfill. Potential movement could be reduced by: • minimizing moisture increases in the backfill • controlling moisture -density during placement of backfill • using designs which allow vertical movement between the exterior features and adjoining structural elements • placing effective control joints on relatively close centers • allowing vertical movements in utility connections • Corrosion Protection: Results of soluble sulfate testing indicate that ASTM Type I Portland cement is suitable for all concrete on and below grade. However, if there is no, or minimal cost differential, use of ASTM Type II Portland cement is recommended for additional sulfate resistance of construction concrete. Foundation concrete should be designed in accordance with the provisions of the ACI Design Manual, Section 318-121. GENERAL COMMENTS It is recommended that the Geotechnical Engineer be retained to provide a general review of final design plans and specifications in order that grading and foundation recommendations may be interpreted and implemented. In the event that any changes of the proposed project are planned, ' the conclusions and recommendations contained in this report should be reviewed and the report modified or supplemented as necessary. The Geotechnical Engineer should also be retained to provide services during excavation, grading, t foundation and construction phases of the work. Observation of footing excavations should be !•� performed prior to placement of reinforcing and concrete to confirm that satisfactory bearing materials are present and is considered a necessary part of continuing geotechnical engineering services for the project. Construction testing of fill placed on the site is considered part of continuing geotechnical engineering service for the project. Field and laboratory testing of concrete and steel should be performed to determine whether applicable requirements have been met. It would be logical for Empire Laboratories, Inc. to provide these services since we are most qualified to determine consistency of field conditions with those data used in our analyses. 15 Boston Chicken Colorado 7erracon ELI Project No. 20935290 Drainage: • Surface Drainage: 1. Positive drainage should be provided during construction and maintained throughout the life of the proposed facility. Infiltration of water into utility or foundation excavations must be prevented during construction. Planters and other surface features which could retain water in areas adjacent to the building or iavements should be sealed or eliminated. , �1 2. In areas where sidewalks or paving do not immediately adjoin the structure, we recommend that protective slopes be provided. -with a minimum grade of approximately ten percent for at least 10 feet from perimeter walls. Backfill against footings, exterior walls, and in utility and sprinkler line trenches should be well compacted and free of all construction debris to reduce the possibility of moisture infiltration. 3. Downspouts, roof drains or scuppers should discharge into splash blocks or extensions when the ground surface beneath such features is not protected by exterior slabs or paving. 4. Sprinkler systems should not be installed within five feet of foundation walls. Landscape irrigation adjacent to the foundation system should be minimized or eliminated. r • Subsurface Drainage: Free -draining, granular soils containing less than five percent fines. (by weight) passing a No. 260 sieve should be placed adjacent to walls which retain earth. A drainage system consisting of either weep holes or perforated drain lines (placed near the base of the wall) should be used to intercept and discharge water which would tend to ij saturate the backfill. Where used, drain lines should be embedded in a uniformly graded �! filter material and provided with adequate clean -outs for periodic maintenance. An impervious soil should be used in the upper layer of backfill to reduce the potential for IIwater infiltration. 14 C << Boston Chicken Colorado ELI Project No. 20935290 Terracon Minimum Percent Material Compaction (ASTM D698) On -site soils: Beneath foundations .................................... 95 Beneath slabs ....................................... 95 Beneath pavements ................................... 95 Imported fill: Beneath foundations ................................... 95 Beneath slabs ....................................... 95 Beneath pavements................0................... 95 Miscellaneous backfill....................................... 90 5. On -site clay soils below slabs should be compacted within a moisture content of optimum moisture to 2 percent above optimum. On -site clay below pavement and imported granular soils should be compacted within a moisture range of 2 percent below to 2 percent above optimum. • Compliance: Recommendations for slabs -on -grade, foundations, and pavement elements supported on compacted fills or prepared subgrade depend upon compliance with "Earthwork" recommendations. To assess compliance, observation and testing should be performed under the direction of the geotechnical engineer. • Utility Construction: Excavations into the on -site soils will encounter a variety of conditions. Excavations into the clays and bedrock can be expected to stand on relatively steep temporary slopes during construction. However, caving soils may also be encountered. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. 13 Boston Chicken Colorado Terracon ELI Project No. 20935290 • general site grading • exterior slab areas • foundation areas • pavement areas • interior floor slab areas • foundation backfill 2. Select granular materials should be used as backf ill behind walls which retain earth. 3. Frozen be fill backfill. soils should not used as or 4. Imported soils (if required) should conform to the following: • Gradation (ASTM C136): percent finer by weight 6100 ............................................... 3" 70-100 No. 4 Sieve ....................................... 50-100 No. 200 Sieve ................................... 25 (max) - • Liquid Limit ... 35 (max) • Plasticity Index 15 (max) . • .. • ... • .... • ......... • .......... 5. Aggregate base should conform to City of Fort Collins Class 5 or 6 specifications. • Placement and Compaction: 1. Place and compact fill in horizontal lifts, using equipment and procedures that will recommended moisture contents and densities throughout the lift. produce 2. Uncompacted fill lifts should not exceed 10 inches loose thickness. 3. No fill should be placed over frozen ground. . 4. Materials should be compacted to the following: 12 10 Z,!(n Boston Chicken Colorado ELI Project No. 20935290 • Excavation: Terracon 1. It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. 2. Some additional effort may be necessary to extract boulder sized materials, particularly in deep narrow excavations such as utility trenches. • Slab Subarade Preparation: 1. Where existing clay soils will support floor slab, the soils should be scarified, moisture conditioned and compacted to a minimum depth of 6 inches. 2. A minimum 4-inch layer of clean, graded gravel or crushed rock devoid of fines should be placed beneath slabs. • Pavement Subarade Preparation:. The subgrade should be scarified, moistened as required, and recompacted for a minimum depth of 8 inches prior to placement of fill and pavement materials. 1. On -site clay soils may pump or become unstable or unworkable at high water contents. Workability may be improved by scarifying and drying. Overexcavation of wet zones and replacement with granular materials may be necessary. Use of lime, fly ash kiln dust, cement or geotextiles could also be considered as a stabilization technique. Adequate laboratory testing should be performed to. evaluate the effectiveness of each chosen method of stabilization. Lightweight excavation equipment may be required to reduce subgrade pumping. • Fill Materials: 1. Clean on -site soils or approved imported materials may be used as fill material for the following: Boston Chicken Colorado ELI Project No. 20935290 Terracon Although fills or underground facilities, such as septic tanks, cesspools, basements, or utilities, were not observed during site reconnaissance, such features might be encountered during construction. • Site Clearing: 1. Strip and remove existing vegetation, debris, and other deleterious materials from proposed building and pavement areas. All exposed surfacesrshould be free of mounds and depressions which could prevent uniform compaction. 2. All existing fill should be removed from below the proposed building. The upper two feet of fill should be removed from below paved areas and stockpiled for reuse. 3. Unexpected fills or underground facilities may be encountered during site clearing, such features should be removed, the excavation thoroughly cleaned and backfilled. All excavations should be observed by the geotechnical engineer prior to backfill placement. 4. Stripped materials consisting of organic materials should be wasted from the site, or used to revegetate exposed slopes after completion of grading operations. If it is necessary to dispose of organic materials on -site, they should be placed in non- structural areas, and in fill sections not exceeding 5 feet in height. 5. Existing foundations from razed buildings should include removal of any concrete to a depth of at least 3 feet below finished grade. 6. The site should be initially graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed building structures. 7. All materials derived from burned existing structures should be removed from the site, and not be allowed for use in any fills. 8. All exposed areas which will receive fill,. once properly cleared and benched where necessary, should be scarified to a minimum depth of twelve inches, conditioned to near optimum moisture content, and compacted. 10 Boston Chicken Colorado Terracon ELI Project No. 20935290 The performance of all pavements, but in particular the recommended asphalt sections, can be enhanced by minimizing excess moisture which can reach the subgrade soils. The following recommendations should be considered at minimum: • Site grading at a minimum 2% grade away from the pavements; • Compaction of any utility trenches for landscaped areas to the same criteria as the pavement subgrade; • • Sealing all landscaped areas in, or adjacent to pavements to minimize or prevent moisture migration to subgrade soils; • Placing compacted backfill against the exterior side of curb and gutter; and, • Placing curb, gutter and/or sidewalk directly on subgrade soils without the use of base course materials. Preventative maintenance should be planned and provided for through an on -going pavement management program in order to enhance future pavement performance. Preventative maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Preventive maintenance consists of both localized maintenance (e.g. crack sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Recommended preventative maintenance policies for asphalt and jointed concrete pavements, based upon type and severity of distress, are provided in Appendix D. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type, and extent of preventative maintenance. Earthwork: • General Considerations: The conclusions contained in this report for the proposed construction are contingent upon compliance with recommendations presented in this f_ section. 9 0 Boston Chicken Colorado Terracon ELI Project No. 20935290 Where rigid pavements are used the concrete should be obtained from an approved mix design with the following minimum properties: • Compressive Strength @ 28 days ................... 3750 psi minimum • Modulus of Rupture @ 28 days ..................... 650 psi minimum • Strength Requirements ............................... ASTM C-94 • Minimum Cement Content ....................... e.. 5.5 sacks/cu.yd. • Cement Type .................................... Type I Portland • Entrained Air Content ................................ 6% + 2% • Concrete Aggregate ................ ASTM C-33 and CDOT Section 703 • Aggregate Size ................................. 1 inch maximum • Maximum Water Content 0.49 lb/lb of cement • Maximum Allowable Slump ............................... 4 inches Concrete should be deposited by truck mixers or agitators and placed a. maximum of 90 minutes from the time the water is added to the mix. Other specifications outlined by the Colorado Department of Transportation should be followed. Longitudinal and transverse joints should be provided as needed in concrete pavements for expansion/contraction and isolation. The location and extent of joints should be based upon the final pavement geometry and should be spaced (in feet), at roughly twice the slab thickness (in II inches), on center in either direction. Sawed joints should be cut within 24-hours of concrete placement, and should be a minimum depth of 25% of slab thickness plus 1/4 inch. All joints _. should be sealed to prevent entry of foreign material and dowelled where necessary for load I- transfer. Where dowels cannot be used at joints accessible to wheel loads, pavement thickness should be increased by 25 percent at the joints and tapered to regular thickness in 5 feet. Future performance of pavements constructed on the clay soils at this site will be dependent upon several factors, including: • Maintaining stable moisture content of the subgrade soils; and, • Providing for a planned program of preventative maintenance. Since the clay soils on the site have shrink/swell characteristics, pavements could crack in the future primarily because of expansion of the soils when subjected to an increase in moisture content to the subgrade. The cracking, while not desirable, does not necessarily constitute structural failure of the pavement. 8 Boston Chicken Colorado Terracon ELI Project No. 20935290 Recommended Pavement Section Thickness (Inches) Asphalt Concrete Surface Aggregate Base Course Plant Mix Bituminous Base Course Portland Cement Concrete TOTAL Traffic Area Alternative A 3" 5" 8" Automobile Parking B 2" 3" 5" C 5" 5" A 3" 8" 11" B 2" 4" f 6" Drive Areas C 6" 6" Each alternative should be investigated with respect to current material availability and economic conditions. In view of the subgrade soil conditions and projected traffic, either full -depth asphalt or rigid concrete pavement sections should be considered in areas of main traffic corridors, drive bays or truck access. Rigid concrete pavement is recommended at the location of dumpsters where trash trucks will park and load. Aggregate base course (if used on the site) should consist of a blend of sand and gravel which meets strict specifications for quality and gradation. Use, of materials meeting Colorado Department of Transportation Class 5 or 6 specifications is recommended. Aggregate base course should be placed in lifts not exceeding six inches and should be compacted to a minimum of 95% Standard Proctor density (ASTM D-698), Within a moisture content range of 2 percent below, to 2 percent above optimum. Where base course thickness exceeds 6 inches, the material should be placed and compacted in two or more.lifts of equal thickness. Asphalt concrete should be obtained from an approved mix design stating the Hveem properties, optimum asphalt content, job mix formula, and recommended mixing and placing temperatures. Aggregate used in asphalt concrete should meet a particular gradation. Use of materials meeting Colorado Department of Transportation Grading C or CX specifications is recommended. The mix design should be submitted prior to construction to verify its adequacy. The asphalt material should be placed in maximum 3-inch lifts, and should be compacted to a minimum of 95% Hveem density (ASTM D-1561). 7 l Boston Chicken Colorado Terracon ELI Project No. 20935290 the subsurface materials, a seismic site coefficient, "s" of 1.0 should be used for the design of structures for the proposed project (Uniform Building Code, Table No.. 23-J). Floor Slab Design and Construction: Low -swelling natural soils or engineered fill will support the floor slab. Some differential movement of a slab -on -grade floor system is possible should the subgrade soils become elevated in moisture content. Such movements are considered within general tolerance for normal slab -on -grade movements. To reduce any potential slab movements, the subgrade soils should be prepared as outlined in the earthwork section of this report. Additional floor slab design and construction recommendations are as follows: • Positive separations and/or isolation joints should be pro*ided between slabs and all foundations, columns or utility lines to allow independent movement. • Contraction joints should be provided in slabs to control the location and extent of cracking. Maximum joint spacing of 15 to 20. feet in each direction is recommended. • Interior trench backfill placed beneath slabs should be compacted in accordance with recommended specifications outlined below. • In areas subjected to normal loading, a minimum 4-inch layer of clean, graded gravel or crushed rock devoid of fines should be placed beneath interior slabs. For heavy loading, reevaluation of slab and/or base course thickness may be required. • Floor slabs should not be constructed on frozen subgrade. • Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1 R are recommended. Pavement Design and Construction: The required total thickness for the pavement structure is dependent primarily upon the foundation soil or subgrade and upon traffic conditions. Based on the soil conditions encountered at the site, the type and volume of traffic and using a group index of 10 as the criterion for pavement design, the following minimum pavement thicknesses are recommended: 2 Boston Chicken Colorado ELI Project, No. 20935290 Terracon Slab -on -grade construction is considered acceptable for use when subgrade soils consist of the clays, provided that design and construction recommendations are followed. Existing fill should be removed from below slabs on grade. Foundation Systems: Due to the presence of non to low swelling soils on the site, spread footing and/or grade beam foundations bearing upon undisturbed subsoils and/or engineered fill is recommended for support of the proposed structure. The footings may be designed for a maximum bearing pressure of 1,750 psf. In addition, the footings should be sized to maintain a minimum dead -load pressure of 500 psf. Exterior footings 'should be placed a minimum of 30 inches below finished grade for frost protection. Interior footings should bear a minimum of 12 inches below finished grade. Existing fill on the site should not be used for support of foundations without removal and recompaction. 0 Finished grade is the lowest adjacent grade for perimeter footings and floor level for interior footings. The design bearing capacities apply to dead loads plus design live load conditions. The design bearing capacity may, be increased by one-third when considering total loads that include wind or seismic conditions. Footings should be proportioned to minimize differential foundation movement. Proportioning on the basis of equal total settlement is recommended; however, proportioning to relative constant dead -load pressure will also reduce differential settlement between adjacent footings. Total or differential settlements resulting from the assumed structural loads are estimated to be on the order of 3/4-inch or less, provided that foundations are constructed as we recommend. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, proper drainage should be provided in the final design and during construction. All foundation walls and masonry walls should be reinforced to reduce the potential for distress caused by differential foundation movements. The use of joints ,at openings or other discontinuities in masonry walls is recommended. Foundation excavations should be observed by the geotechnical engineer. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required. Seismic Considerations: The project site is located in Seismic Risk Zone I, of the Seismic Zone Map of the United States as indicated by the Uniform Building Code. Based upon the nature of L Y 5 Boston Chicken Colorado Terracon ELI'Project No. 20935290 • Well -Graded Gravel with Sand and Cobbles: The granular stratum was encountered at depths of 6'% to 8'/: feet below the surface and extends beyond the depths explored. The well -graded gravel contains varying amounts of sand and cobbles, is dense to extremely dense in its in situ condition. Laboratory Test Results: Laboratory test results indicate that the clay subsoils at shallow depth have low swell potential and moderate bearing characteristics. Groundwater Conditions: Groundwater was not encountered in any test boring at the time of field exploration. When checked two days after drilling, groundwater was encountered at a depth of 14'/s feet in Boring 2. No groundwater was encountered in Borings 1 and 3 two days after drilling. These observations represent only current groundwater conditions, and may not be indicative of other times, or at other locations. Gilbundwater levels can be expected to fluctuate with varying seasonal and weather conditions. Based upon review of U.S. Geological Survey maps ('Hillier, et al, 1979), regional groundwater is expected to be encountered in unconsolidated alluvial deposits on the site, at depths ranging from 10 to 20 feet below the existing ground surface at the project site. Fluctuations in groundwater levels can best be determined by implementation of a groundwater monitoring plan. Such a plan would include installation of groundwater monitoring wells, and periodic measurement of groundwater levels over a sufficient period of time. CONCLUSIONS AND RECOMMENDATIONS Site Development Considerations: The site appears suitable for the proposed construction Potentially expansive soils will require particular attention in the design and construction. Because of variations in the engineering properties of the on -site soils, foundation bearing levels, structural loads, and possible final grades, the following foundation systems were evaluated for use on the site: • spread footings and/or grade beams bearing on undisturbed soils; and, • spread footings and/or grade beams bearing on engineered fills. 2Hillier, Donald E.; Schneider, Paul A., Jr.; and Hutchinson, E. Carter, 1983, Depth to Water Table (1979) in the Boulder -Fort Collins -Greeley Area, Front Range Urban Corridor Colorado,United States Geological Survey, Map 1-8554 4 Boston Chicken Colorado 7erracon ELI Project No. 20935290 The significance and purpose of each laboratory test is described in Appendix C. Laboratory test results are presented in Appendix B, and were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. All laboratory test were performed in general accordance with applicable ASTM, local or other accepted standards. SITE CONDITIONS The site consists of a vacant parcel of land on the east side of Lemay Avenue. The area is vegetated with grass and weeds. Cottonwood trees are located west of the proposed building. The site is bordered on the north, south and east by commercial development and on the west by Lemay Avenue. The property is relatively flat and has minor drainage to the northwest. An old topographic map prepared by Stewart & Associates, Inc. indicates that two frame houses, a frame garage and a frame barn occupied the area of the proposed restaurant. A large concrete slab was located south of the property: SUBSURFACE CONDITIONS Mapping completed by the Colorado Geological Survey ('Hart, 1972), indicates the site in an area of "Moderate Swell Potential". Potentially expansive materials mapped in this area include bedrock, weathered bedrock and colluvium (surficial units). Soil Conditions: As presented on Logs of Borings, the subsurface soils encountered at the site are described in order of increasing depths: • Fill Material and Silty Topsoil: A 1 to 6'/z foot layer of fill material was encountered at the surface of Borings 1 and 3. The fill consists of a sandy lean clay mixed with cinders. It is not known whether the fill has been uniformly or properly compacted. The fill was probably placed in conjunction with filling of excavations of razed structures. A 6-inch layer of silty topsoil was encountered below the surface of Boring 2. The topsoil has been penetrated by root growth and organic matter. • Sandy Lean Clay: This stratum was encountered below the topsoil and/or fill and extends to the gravel below. The lean clay contains varying amounts of sand, is moist, stiff to hard and exhibits generally moderate bearing characteristics. 'Hart, Stephen S., 1972, Potentialty Swelling Soil and Rock in the Front Range Urban Corridor, Colorado, Colorado Geological Survey, Environmental Geology No. 7. 3 Boston Chicken Colorado Terracon ELI Project No. 20935290 Field Exploration: A total of three test borings were drilled to depths of 10 to 15 feet at the locations shown on the Site Plan, Figure 1. Two borings were drilled within the footprint of the proposed building, and one boring was drilled in the area of proposed parking lot construction. All borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem auger. The location of borings were positioned in the field by measuring from existing site features and from the intersections. Elevations were taken of the ground surface at each boring location by measurements with an engineer's level from a temporary bench mark (TBM) shown on the Site Plan. The accuracy of boring locations and elevations should only be assumed to the level implied by the methods used to determine each. Continuous lithologic logs of each boring were recorded by the engineering geologist during the drilling operations. At selected intervals, samples of the subsurface materials were taken by means of pushing thin -walled Shelby tubes, or by driving split -spoon samplers. Penetration resistance measurements were taken with each sampling with the split -spoon by driving the sampler with a 140 pound hammer falling 30 inches. When properly interpreted, the penetration resistance is a useful index to the consistency, relative density or hardness of the materials encountered. Groundwater conditions were evaluated in each boring at the time.of site exploration, and two days after drilling. Laboratory Testing: All samples retrieved during the field exploration were returned to the laboratory for evaluation by the project geotechnical engineer, and were classified in accordance with the Unified Soil Classification system described in Appendix C. At that time, the field descriptions were confirmed or modified as necessary, final boring logs prepared, and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Boring Logs for the project are presented in Appendix A. Selected soil samples were tested for the following engineering properties: • Water content • Consolidation • Dry density • Plasticity • Unconfined compression • Soluble sulphate content • Expansion K iGEOTECHNICAL ENGINEERING REPORT Terracon PROPOSED BOSTON CHICKEN ROTISSERIE RESTAURANT SOUTH LEMAY AVENUE AND PENNOCK PLACE FORT COLLINS, COLORADO ELI PROJECT NO. 20935290 NOVEMBER 23, 1993 INTRODUCTION This report contains the results of our geotechnical engineering exploration for the proposed Boston Chicken Rotisserie Restaurant to be located on South Lemay Avenue and Pennock Place in Fort Collins, Colorado. The site is located in the Northwest 1 /4 of Section 18, Township 7 INorth, Range 68 West of the 6th Principal Meridian. I The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • subsurface soil conditions • groundwater conditions 0 foundation design and construction I• floor slab design and construction • pavement design and construction • earthwork • drainage The conclusions and recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil and structural conditions. PROPOSED CONSTRUCTION The proposed construction is to consist of a single -story, slab -on -grade building. Driveway and parking areas are planned adjacent to the restaurant. Although final site grading plans were not available prior to preparation of this report, ground floor level is anticipated to be at, or near existing site grades. SITE EXPLORATION The scope of the services performed for this project included site reconnaissance by an engineering geologist, a subsurface exploration program, laboratory testing and engineering analyses. C Boston Chicken Colorado ELI Project No. 20935290 Q TABLE OF CONTENTS (Cont'd) Terracon Page No. APPENDIX A Figure No. SITEPLAN ........................................................... 1 Logs of Borings .......................................... Al thru A3 APPENDIX B Laboratory Test Data: Consolidation Test ......... Summary of Test Results APPENDIX C: GENERAL NOTES ............................... B1 .................................... B2 Drilling & Exploration ............................................ C1 Unified Soil Classification ......................................... C2 Laboratory Testing, Significance and Purpose C3 Report Terminology ............................................. C4 APPENDIX D Recommended Preventative Maintenance -Asphalt Concrete Pavements ......... D1 Recommended Preventative Maintenance -Jointed Concrete Pavements ......... D2 v Boston Chicken Colorado Terracon ELI Project No. 20935290 TABLE OF CONTENTS Page No. Letter of Transmittal................................................... i INTRODUCTION..................................................... 1 PROPOSED CONSTRUCTION ........................................... 1 SITE EXPLORATION .................................................. 1 Field Exploration ............................................... 2 Laboratory Testing .............................................. 2 SITE CONDITIONS ................................................... 3 SUBSURFACE CONDITIONS ............................................ 3 Soil Conditions ......... .. ............................ ..... 3 Laboratory Test Results .......................................... 4 Groundwater Conditions .......................................... 4 CONCLUSIONS AND RECOMMENDATIONS ................................. 4 Site Development Considerations .................................... 4 Foundation Systems .................. ........................ 5 Seismic Considerations ........................................... 5 Floor Slab Design and Construction .................................. 6 Pavement Design and Construction ................................... 6 Earthwork.................................................... 9 General Considerations ........................................ 9 Site Clearing ........... 10 Excavation ............................................. 11 Slab Subgrade Preparation .................. ................... 11 Pavement Subgrade Preparation .. 11 Fill Materials ............................................ 11 Placement and Compaction ................................... 12 Compliance ............................................. 13 Utility Construction ........................................ 13 Drainage............................:....................... 14 Surface Drainage ......................................... 14 Subsurface Drainage ....................................... 14 Additional Design and Construction Considerations ...................... 15 Exterior Slab Design and Construction .......................... 15 Corrosion Protection ........................................ 15 GENERAL COMMENTS ............................................... 15 Boston Chicken Colorado Terracon ELI Project No. 20935290 We have appreciated being of service to you in the geotechnical engineering phase of this project, and are prepared to assist you during the construction phases as well. If you have any questions concerning this report or any of our testing, inspection, design and consulting services, please do not hesitate to contact us. Sincerely, EMPIRE LABORATORIES, INC.'-`` 1 `Y% A Division of Th Te;conCornpanies, Inc. .AFF3 i it R. Sh 0'nn s. ch Senior Engineering Geologist Reviewed by: %�/�'fi� 'i C 'u ✓ CGGrC OC ^`' W i Chester C. Smith, P.E. 4•:v� , _ Division Manager NRS/CCS/cic r C!5,UO Copies to: Addressee (2) ZTI Group - Mr. Ed Zdenek (1) a 0 November 23, 1993 Boston Chicken Colorado 9034 East Easter Place, Suite 100 JEnglewood, Colorado 80112 Attn: Mr. Mark E. Nelson N Empire Laboratories, Inc. A Division of The Terracon Companies, Inc. P.O. Box 503 • 301 No. Howes Fort Collins, Colorado 80522 (303) 484-0359 FAX No. (303) 484-0454 Chester C. Smith, P.E. Neil R. Sherrod, C.P.G. Re: Geotechnical Engineering Report, Proposed Boston Chicken Rotisserie Restaurant South,Lemay Avenue and Pennock Place Fort Collins, Colorado ELI Project No. 20935290 Empire Laboratories, Inc. (ELI) has completed a geotechnical engineering exploration for the proposed Boston Chicken Rotisserie Restaurant to be located at the intersection of Lemay Avenue and Pennock Place in southeast Fort Collins, Colorado. This study was performed in general 1 accordance with our proposal number D2093174 dated November 9, 1993. The results of our engineering study, including the boring location diagram, laboratory test results, test boring records, and the geotechnical recommendations needed to aid in the design and construction of foundations and other earth connected phases of this project are attached. The subsurface exploration indicated soil conditions which are typical of soils commonly found in the northeast portion of the Fort Collins area. The subsurface soils at the site consisted of fill material underlain by sandy lean clay. The lean clay is underlain by well graded gravel with sand and cobbles. The information obtained by the results of field exploration and laboratory testing completed for this study indicates that the soils at the site have low expansive potential and moderate bearing characteristics. 1 Based on the geotechnical engineering analyses, subsurface exploration and laboratory test results, we recommend that the proposed building be supported on a narrow spread footing and/or grade beam foundation system. Slab -on -grade may be utilized for the interior floor system provided that care is taken in the placement and compaction of the subgrade soil. Other design and construction details, based upon geotechnical conditions, are presented in the report. 1� Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers Arizona: Tucson ■ Colorado: Colorado Springs, Denver, Ft. Collins. Greeley, Longmont m Idaho: Boise (i Illinois: Bloomington. -- Chicago, Rock Island ■ Iowa: Cedar Falls, Cedar Rapids. Davenport, Des Moines, Storm Lake 0 Kansas: Lenexa, Topeka, Wichita ■ Minnesota: St. Paul N Missouri: Kansas City ■., Nebraska: Lincoln, Omaha ■ Nevada: Las Vegas ■ Oklahoma: Oklahoma City, Tulsa ■ Texas: Dallas ■ Utah: Salt lake City M Wyoming: Cheyenne QUALITY ENGINEERING SINCE 1965 GEOTECHNICAL ENGINEERING REPORT PROPOSED BOSTON CHICKEN ROTISSERIE RESTAURANT SOUTH LEMAY AVENUE AND PENNOCK PLACE 'FORT COLLINS, COLORADO ELI PROJECT NO. 20935290 Prepared for: BOSTON CHICKEN COLORADO 9034 EAST EASTER PLACE, SUITE 100 ENGLEWOOD, COLORADO 80112 ATTN: MR. MARK E. NELSON Empire Laboratories, Inc. A Division of. The Terracon Companies, Inc.