HomeMy WebLinkAboutBOSTON CHICKEN PUD PRELIMINARY - 79 93 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSE---
Schlotzsky's
SOUTHEAST ELEVATION
SCALE: 1/4. V-0'
NORTHWEST ELEVATION
SCALE: va' . r-0
..,.- ----- --r--1
SOUTHWEST ELEVATION
SCALE. va'. 1' 0
WINDOW SIGN
SCALE: V . 1`0'
hlotzsky's
MONUMENT SIGN
SCALE: I/T . V-D'
NORTHEAST ELEVATION
SCALE: I/A. V-W
FEBRUARY 11,1994
SCI-ILOTZSKY'b
AT LEMAY &
PENNOCK PUD
0
ZTI
GROUP
m'mme
WEST ELEVATION EAST ELEVATION
SCALE: 1/A' • 1'-0' SCALE: 1/4'- 1'-0'
SOUTH ELEVATION
SCALE: 114 • 1'-0'
MONUMENT SIGN
SCALE: 3/6'• 1' 0'
IM
NORTH ELEVATION
BOSTON
CHIC"A"EN .. _.
AT LEMAY & ZTI
PENNOCK PUD GROUP
m. om
0
RIVERSIDE SHOPPING CENTERi
PENNOCK PLACE IT 1
I
ey I.
I
a
i
OIII!I1!0
ELISTING
VE7 CLINIC
BOSTON
CHICKEN
LOl 1
LOT 3
' y�ldlin'AL I r EXISTING GODFATHERS PIZZA
I I [
w
Il;g
:I�
FRIES ENTERPRISES
MINOR SUBDIVISION
FOURTH FILING
RIVERSIDE SUBDIVISION
VI 1VPL I.C<E31
sevsrMELV ml oe
11
' n4b o.e- �fQmr�
i ram
mintier
�ps/n f p'm/Yq mi
VICINITY MAP
a1,
DDLi ORs DEFILE _ �Fi nwa atMd'n
CONFER TREE PLANTING FEBRUARY a. lea.,
SHRUB PLANTING IRRIGATED AREA PRELIM LANDSCAPE PLAN
FIRST RIVERSIDE .0 E P. D. BOSTON
11 I I
_ CHICKEN
AT LEMAY &
I V I unoscvE MOM
.=-----Da��n PENNOCK PUD
. EXISTING
` RIVERSIDE SHOPPING CENTER
A�
OUND ELECIAL B IFPf1E
IEEWER
IE
AM'
.T HANDICAPPED
00% i � I� R UGNf n h /T I�
HANDICAPPED RAMP
V MC VAULT DUIE sevlsrorr 1so.W
D DIRECTIONAL 91GN
Y MENU BOARD
' • MOP SIGN.. ... .. .. .. ... _—
LEGAL DESCRIPTION
A haCl al bq Nuale In Xy MadnI&R ua ai 5,FIR, 19. Tovmlp ) NMn.
Rwge M WM al Xa. P.M. E CG , L., Ccvn, Cdwatlo, w K
coaldRanp Me Wevl Yne OI wltl Nxll,well I M a. Read, N W p Eantl Wlln
et IaM,W dan' ]1weN reMNe XrNo. b conlaM]. I Eau,Uvv
IF Ctl' f NO.CO lex aM a9aN
NIR 15E WXaml Ran ll,e Wx11/<aane,OlW Seclbn 18. ontl Run
I . N MW E 5)1 i) firm Xw¢e 5!p y' E 1b W NM, IMte
NW W' E )6 W f.1 1.— S 09 11' E 151.761est: IMn. S W . E 101 OB
Ieel:ll DSOI (0'5]'W ]GS.JO MI: Hpnce5B4 15'W 251051eet1alM
poF1IN OepYNp.
.a.....ea«......,...,„, VICINITY MAP
Al
EXISTING ,
DOCTORS OFFICE
FIRST RIVERSIDE P.U.D.
FERRUARY 9, 199e
PRELIMINARY SITE PLAN
BOSTON
ALRSi
CHICKEN
ATTORNEYAT LEMAY &.^S CERTIFICATION PENNOCK PUD
PLANNING 820NING BOARD CERTIFICAM ......
e�
O
OWNERS CERTIFICATION17
o sq o ROioY° Oil
IAMOY
P1 PN0Y
k i'Y OF FORT COLLIN
ENERGY CONSERVATION WORKSHEET
This worksheet must be completed and submitted at the time of application for
all non-residential Preliminary PUD's requesting energy conservation points
on the applicable Land Use Activity Point Chart. Please choose one of the two
methods below.
Be realistic in determining your commitment for energy conservation mea-
sures. Failure to fulfill a commitment made for energy conservation measures
may result in disqualification of a project under the applicable criteria of the
LDGS.
NAME OF PUD : Lemay and Pennock P,U,0.
Submittal Date: nPramhar 6, 1993
METHOD ONE:
I propose a percent reduction in the annual energy consumption for
the structure(s) in this proposed PUD.
This reduction receives point(s) for energy conservation.
NOTE FOR THOSE PROJECTS USING METHOD ONE: Certification by a professional engineer,
licensed in Colorado, and a summation of the engineer's calculation methods and results will be
required to document energy conservation measures at the time of building permit application.
METHOD TWO:
I propose the following energy conservation measures for the structure(s) in
this proposed PUD:
Measure
Long Axis of Building is East/West
Ratio of Exterior Wall
Overall Wall "U" Value
Vestibules, Airlocks Used
Automatic Spark Ignition
Electric Resistance Not Used
Total Points received from Method 2
Points
0.2
0,3
1.0
0.2
0.1
0.2
2,0
Preparer's Name: Edward G, Zdenek
l
AUTO -RELATED AND
ROADSIDE COMMERCIAL
POINT CHART D
For All Criteria
Applicable Criteria Only
theII
III IV
Criterion
Oftenon
AWUcODN
C:rc:e
me
mutlojer
pants
EarneG
vcx:rm.,:^
ADDIiC:oie
F
Yea No
Correct score
ixu
points
t Two Arterials
X
Q
0
2
4
f Planned Center
FX
X
2
0
3
6
0
.on -Arterial
X
X
2
Q
4
0
8
d. Two Acres or More
X
X
010
3
.6
6
e. Mixed -Use
X
X
2
Q
3
6
0
f. Joint Parking
1
Q
0
3
6
6
.g. Energy Conservation
X
1
31410
2
4
8
h. Contiguity
X
X
Q
0
5
10
10
i. Historic Preservation
1
2
Q
2
0
0
J•
1
2
0
k.
1
2
0
I'
1
F2 1
0
Totals 30 54
V vi
Percentage Earned of Maximum Applicable Points V/VI = Vil 55
vu
Mod
llll A 1111 k_ &lC
Yes No
4. DOES THE PROJECT EARN AT LEAST 501. OF THE
MAXIMUM POINTS AS CALCULATED ON "POINT CHART D" El ❑
.FOR THE FOLLOWING CRITERIA?
a. Is the activity located other than at the intersection of two arte-
rial streets?
b. Is the project contiguous to and functionally a part of an existing
neighborhood or community/regional shopping center, office or
industrial park?
c. Is the primary access to the activity from a non -arterial street?
d. Is the project on at least two acres of land?
e. Does the project contain two or more significant uses (for
instance, retail, office, residential, hotel/motel and recreation)?
f. Is there,direct vehicular and pedestrian access between on -site
parking _areas and adjacent existing or future off -site parking
areas which contain more than ten (10) spaces?
g. Does the activity reduce non-renewable energy usage, through the
application of alternative energy systems, use of existing build-
ings, and through committed energy conservation measures beyond
that normally required by City Code?
h. Is the project located with at least 1/6th of its property boundary
contiguous to existing urban development?
i. If the site contains a. building or place in which.a historic event
occurred, which has special public value because of notable archi-
tecture, or is of cultural significance, does the project fulfill
the following criteria.
i. Prevent creation of influences adverse to its preservation;
ii. Assure that new structures and uses will be in keeping with
the character of the building or place. Imitation of period
styles should be avoided; and
iii. Propose adaptive use of the building or place that will
lead to its continuance, conservation, and improvement in
an appropriate manner while respecting the integrity of the
neighborhood.
Lemay & Pennock P.U.D.
ACTIVITY: Auto- Related and.
Roadside Commercial
DEFINITION:
Those retail and wholesale commercial activities which are generally con-
sidered and typically found along highways and arterial streets. Uses
include: free standing department stores; auction rooms; automobile service
stations, repair facilities, car washes.; boat, car, trailer, motorcycle
showrooms, sales and repair; fuel and ice sales; greenhouses and nurseries;
warehouses and storage; repair or rental of any article; exterminating
shops; drive-in restaurants; adult. book stores; eating places with adult
amusement or entertainment; adult photo studios; adult theatres; any uses
intended to provide adult amusement or entertainment; and, other uses which
are of the same general character.
CRITERIAEach of the following applicable criteria must be
answered "yes" and implemented within the develop-
ment plan.
Yes No NA
1. Does the project gain its primary
vehicular access from a street other FX n
than South College Avenue?
2. Are all repair, painting and body work Elactivities, including storage of refuse
and vehicular parts, planned to take
place within an enclosed structure?
3. If the project contains any uses intended.
to provide adult amusement or entertainment, 1:1 El x❑
does it meet the following requirements:
a. Is the use established, operated or maintained no less than 500
feet from a residential neighborhood, church and/or school meeting
all the requirements of the compulsory education laws of the State
of Colorado?
b. Is the use established, operated or maintained no less than 1,000
feet from another similar use?
wi n n iuu�
oS Ton/ �inc�,«.✓ -�9- 93
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA APPLICABLE CRITERIA ONLY
s the emermn wig Me"Otaw
. .
aopfiawe? be sa6sfled?
CRITERION
� � � � Yes No If no, please explain
i 3
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation I .
1.2 Ccmcrehensive Plan
1.3 Wildlife Habitat
1.4 Mineral Deposit
1.5 Eccicgically Sensitive Areas' I reserved
1.6 Lands of Acricultural Importance reserved
1.7 E^ercv Ccnservaticn ✓
1.8 Air Qualitv � I ✓ I.
-.. ;.
Y .
1.9 Water Quality
I.
1 '0 Sewace and Wastes
A 2.` NEIGHBORHOOD COMPATIBILITY-CRITER
2.1 Vehicular. Pedestrrari, Bike Transportation)
2.2 Euildina Placement and Orientation
2.3 Natural Features
2.4 Vehicular Circulation and Parking
yj
2.5 E-ergencr Access
2.6 Pedestrian Circulation
I
4
2.7 Architecture
i \v/f,
2.8 Euiiding Height and Views
2.9 � Shading
2.10 Selar Access
2.11 Historic Rescurces
II
AOT I
2.12 Setbacks
✓
2.13 Landscape :
2.14 Sions
2.15 Site Lighting
2.16 Ncise and Vibration
2.17 . Glare or Heat
t
2.18 Hazardous Materials
1
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
3.2 Design Standards
3.3 Water Hazards
L
3.4 Geologic Hazards
L
e
54
c
26. Availability of existing services
LOCATIONAL POLICIES FOR SPECIFIC LAND USES.
63. Walking distance to residential areas.
64. Alternative transportation modes
65. Existing services
LEMAY AND PENNOCK P.U.D.
STATEMENT OF PLANNING OBJECTIVES
The P.U.D. is a neighborhood service center containing two (2) food service
establishments located in the 800 block of Lemay Avenue. The project will utilize the
same access point to Lemay as the Neighborhood Shopping Center to the west and
be designed to accommodate future access to the north and the east. Directly south
of the P.U.D. is an existing restaurant, and it will be functionally incorporated into our
design. The landscaping will accommodate two large, existing trees at the entrance to
the site and be designed to enhance the streetscape with a combination of shade
trees and shrubs to screen the parking areas while allowing good visual access to the
development: The internal traffic system will be predominately one way, reducing the
amount of pedestrian/vehicular conflicts. Parking for the approximately twenty (20)
employees will be on the east end of the parking lot. Included within the P.U.D. is a
park/detention area, that is designed as a wetland and potential outdoor dining area
and will be privately owned and maintained.
The initial phase of the project will be the northern site and park area. And it
will accommodate a Boston Chicken Restaurant and drive up facility. The second
phase is designed to accommodate a future restaurant that will be designed to
harmonize with the design of the initial phase, and will be submitted as a subsequent
P.U.D.
It would appear that our Neighborhood Shopping Center will be well suited to
provide needed services to medical community to the east and south of the site as
well as the east side neighborhood to the west. The location on Major Bicycle and
Mass Transit Routes will provide easy access. We protect a new traffic control at the
entry to the site, as has been projected in the last 2 traffic studies presented to the
city. This new control will provide for a superior traffic situation at what is presently a
very difficult intersection
The project is in keeping with the land use policies of the city in several specific
areas:
THE LAND USE POLICIES PLAN
GENERAL POLICIES.
3. The City shall promote
A. Maximum utilization of land within the City
B. Alternative transportation modes
C. Efficient mass transit systems
GROWTH MANAGEMENT.
22. Encourage contiguous Development
LEGAL DESCRIPTION
A tract of land situate in the Northwest 1/4 of Section 18, Township 7 North, Range 68
West of the Sixth P.M., Fort Collins, Larimer County , Colorado, which, considering
the West line of said Northwest 1/4 as bearing N 00 06' E and with all bearings
contained herein relative thereto, is contained within the boundary lines which begin at a
point which bears N 00 06' E 300.00 feet and again N 89 15' E 50.00 feet from the
West 1/4 corner of said Section 18, and run thence N 00 06' E 374.47 feet; thence
S 89 54' E 136.00 feet; thence N 00 06' E 75.00 feet; thence S 08 17' E 151.78 feet;
thence S 89 54' E 101.08 feet; thence S O1 40' 57" W 295.70 feet; thence S 89 15' W
251.08 feet to the point of beginning.
�° \\ Poudre
.- J
\ \ } Ma n011a SI. L.inK 'ane
ir
o C \ J
C p
p U U
V) 3 U V1 Lo
c q) in \ Ri
Laurel S►
V\ \\ 4IFr*
Kenro Pennock
CT Ploce � \ \2Cl
ELIZABETH ST. •' s�Cc \
Ln ° N \ \ \
G V O
° D
G 0 rf St .0 1 h
d° Q Doc tor0s Ln in � N Sr o\
W edsords S �\ J Q = in QUI
E E
vi w
Bucke e c � 5 E. Pi t k i n st ucke e
St
Z `4 C w � t ` a c
O O r f
_ St. La ke �
w E. Pros p Gt _Rd.
ITEM: BOSTON CHICKEN PUD
@ Lemay & Pennock- Prelim. North
NUMBER: 79-93
City of Fort Collins
Communi., Planning and Environmental Se.,,ices
Planning Department
MEMORANDUM
TO: Planning and Zoning Board Members
FR: Kirsten Whetstone, City Planner
RE: Boston Chicken PUD conditions
DA: February 28, 1994
The following conditions replace the recommended conditions of
preliminary PUD approval, for the Boston Chicken PUD, as
previously stated in the Staff Report:
1. That final building elevations and samples of proposed
materials be submitted to the Planning Department for review
in order to assist the Board in addressing Criterion A-2.7,
Architecture, of the All Development Chart of the LDGS, at the
time of consideration of the final plans. Staff has concerns
about the compatibility of architectural materials, textures,
colors, architectural accents, and awning details between the
two buildings.
2. That the layout and dimensions of drive aisles and the
northern entrance drive be approved by the City Engineering
Department prior to final approval. The entrance geometrics
may not allow a safely negotiated southbound or northbound
turn into the site, and the entire northern building may need
to be shifted slightly to the east. Parking spaces and drive
aisles may need to be altered accordingly. Therefore, this
preliminary approval is conditioned upon the reservation of
the right, by the Board, to change the layout at the time of
consideration of the final plan.
.�- tf CIGI /nOY14.I �Qv7 Lf SCc��,7 / �
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
Boston Chicken PUD - Preliminary, #79-93
February 28, 1994 P & Z Meeting
Page 5
2. That the layout and dimensions of drive aisles and entrance
drive be approved by the Engineering Department prior to final
approval. The entrance geometrics may not allow a safely
negotiated southbound left turn into the site, and the entire
northern building may need to be shifted slightly to the east
Parking drive aisles may need to be altered accordingly.
Boston Chicken PUD
February 28, 1994 P
Page 4
- Preliminary, #79-93
& Z Meeting
standpoint. There will eventually be a traffic signal at the
Lemay and Pennock intersection, which will ultimately control the
entrance drive to this site. The applicant is negotiating with the
City to have the signal installed with this development.
Both the Planning and Transportation Department staff are working
with the surrounding property owners to develop a system of cross
access connections to the north, east and south. City Staff
believes that cross access points are important to enable
properties in this area to be connected, for vehicular and\or
pedestrian use. Staff will continue to work with the property
owners to facilitate construction of these access points.
Engineering staff has concerns about the geometrics of the entrance
and parking aisles. They are recommending a condition of
preliminary approval that the layout and dimensions of drive aisles
and entrance drive be approved by the Engineering Department prior
to final approval. The entrance geometrics may not allow a safely
negotiated southbound left turn into the site, and the entire
northern building may need to be shifted slightly to the east
Parking drive aisles may need to be altered accordingly.
RECOMMENDATION
Staff finds that Boston Chicken PUD, Preliminary:
1) Is in conformance with and meets the requirements of the All
Development Criteria of the Land Development Guidance System.
2) Is a compatible land use with the surrounding area.
3) Meets the absolute criteria of the Auto -Related and Roadside
Commercial Point Chart of the LDGS as the proposal 1) does
gain its primary access from a street other than South
College Avenue and 2) the project earns a score of 55%,
exceeding the minimum required score of 50%.
Therefore, based on these findings, staff is recommending approval
of Boston Chicken PUD, Preliminary- #79-93 with the following
conditions related to access, traffic flow, and architectural
compatibility.
1. That final building elevations and samples of proposed
materials be submitted to the Planning Department for review
and that Criterion A-2.7, Architecture, of the All Development
Chart of the LDGS. be addressed prior to final. Staff has
concerns about the compatibility of architectural materials,
textures, colors, architectural accents, and awning details
between the two buildings.
Boston Chicken PUD - Preliminary, #79-93
February 28, 1994 P & Z Meeting
Page 3
addressed prior to final. Staff has concerns about the
compatibility of architectural materials, textures, colors,
architectural accents, and awning details between the two
buildings.
The maximum height of the buildings is 30' (actual height is
approximately 201).
All mechanical equipment and trash receptacles will be either
enclosed within the building or will be adequately screened from
public view.
Site landscaping consists of shade trees and evergreen shrubs along
Lemay Avenue and a mix of ornamental and evergreen trees and
evergreen and deciduous shrubs throughout the site to enhance the
aesthetic character of the site. A variety of evergreen and
flowering shrubs are proposed as foundation and accent plantings
around the buildings and monument signs. A detailed landscape plan
will be reviewed as part of the final submittal.
Several large existing trees along Lemay and in the detention area
to the north will be retained. The applicants intend to use the
detention area for outdoor picnic tables. The City Forester has
been in contact with the applicant to provide information
concerning the existing trees.
Two free standing signs, with a base to match the buildings, will
be located on Lemay Avenue. The entire sign package will comply
with the City's sign ordinance.
The parking lot along Lemay Avenue is setback a minimum of 25' from
the flow line, separated from Lemay by two 10' landscaped strips
and a 5' detached walk which is compatible with the setbacks along
Lemay across the street. The buildings are setback approximately
70' from Lemay Avenue with the drive-thru lanes situated on the
north and east sides.
4. Neighborhood Compa_tibilit
A neighborhood meeting was not held for this request because the
proposed use is considered compatible with the surrounding uses
along this portion of Lemay Avenue.
5. Transportation
A traffic impact analysis for the site was submitted and has been
reviewed by the City Transportation Division staff. Staff finds
that this request is feasible from a traffic engineering
Boston Chicken PUD - Preliminary, #79-93
February 28, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background
The surrounding zoning and land uses are as follows:
N: BP; Lemay Animal Hospital and Fries Carwash and Lube;
S: C; Godfathers Pizza and Hospital 66 service station;
E: BP; Northern Colorado Kidney Center, medical offices,
Vineyard Christian Church, and vacant;
W: C; Existing commercial, retail, fast food, and medical
offices (Riverside and Lemay Shopping Center).
The site is currently vacant and undeveloped.
2. Land Use
The request for two fast food restaurants with drive-thru lanes was
evaluated against the Auto -Related and Roadside Commercial Point
Chart of the Land Development Guidance System. The proposal earns
a score of 55% for a) being located, not at two arterial streets,
b) being two acres or more, c) joint parking, d) contiguity to
existing urban development, and e) providing energy conservation
measures over those required by the City code.
The request was also evaluated against the new All Development
Criteria of the LDGS, which were adopted in December of 1993.
Staff finds that the request satisfies requirements of applicable
"All Development" criteria. The land use is compatible with the
surrounding area.
3. Design
The proposal consists of two fast food restaurant pad sites for
Boston Chicken and Schlotzsky's, adjacent to an existing fast food
restaurant (Godfathers Pizza). The building elevations are
designed to be compatible with each other and compatible with the
surrounding area. Both buildings will be the same color of grey
and will be of similar building materials. The use of externally
illuminated awnings, using goose neck fixtures, in similar color
schemes ties the two buildings together.
The primary accent colors for the Boston Chicken building include
reds and grays. Green and red are the primary accent colors for
Schlotzsky's. The Godfather's Pizza restaurant uses a red accent
color. Staff is recommending a condition of preliminary approval
that final building elevations and samples of proposed materials be
submitted to the Planning Department for review and that Criterion
A-2.7 Architecture, of the All Development Chart of the LDGS, be
ITEM NO. 21
MEETING DATE 9/9R/94
(=6�mzi STAFF Kirc_ n Whetstone
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Boston Chicken PUD- Preliminary, #79-93
APPLICANT: Boston Chicken
c/o ZTI Group
1220 S. College Avenue
Fort Collins, CO 80524
OWNER: Boston Chicken Inc., A Delaware Corp
1804 Centre Point Dr. Suite 106
Naperville, Illinois 60563
PROJECT DESCRIPTION:
This is a request for a preliminary PUD for 6,000 square feet of
fast food restaurant uses on two pad sites. Both restaurants have
drive-thru lanes. The 2.01 acre site is located on the east side
of Lemay Avenue, north of Elizabeth Street and southwest of
Riverside Drive. The property is zoned BP, Planned Business.
RECOMMENDATION: Approval with conditions
EXECUTIVE SUMMARY:
The applicant proposes two fast food restaurant pad sites on a 2.01
acre site for a Boston Chicken restaurant and a Schlotzsky's Deli.
Both restaurants have drive-thru lanes. The architectural
character of the two buildings is complimentary and is compatible
with the existing buildings in the area. Similar building
materials and fabric awnings with external lighting are proposed
for the two buildings. Landscaping consists of street trees,
ornamental trees, evergreen trees and shrubs and deciduous shrubs.
The large existing trees on either side of the proposed drive and
in the detention/open space area to the north will be retained.
Primary access to the site is from Lemay Avenue across from the
future signalized Pennock and Lemay intersection. The proposed
uses are compatible with the surrounding area. The PUD earns a
score of 55% of the maximum applicable points on the Auto -Related
and Roadside Commercial Point Chart and meets applicable criteria
of the All Development Point Chart of the Land Development Guidance
System. Conditions regarding architectural details, access and
traffic flow are being recommended.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT