HomeMy WebLinkAboutCOVENTRY SUBDIVISION FILING 2 FINAL - 80 93B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (5)Utility Services Stormwater October 24, 1995 City of Fort Collins Ms. Mary Wohnrade, P.E. Northern Engineering Services, Inc. 420 S. Howes, Suite 202 Fort Collins, CO 80521 Re: Coventry Second Filing, additional comments Dear Mary, This is a follow-up on our phone conversation of today the 24 th of October 1995. In our previous comments dated October 17, 1995 regarding the Second Filing utility plans of the Coventry Subdivision it was stated that those plans were not reviewed since easement issues along Harmony Road could significantly affect the layout of the Mail Creek channel and the development's lots. I would like to comment however on the fact that the crossing of the Mail Creek channel under Crest Road was not designed or shown as being improved as a part of these plans. This issue should be addressed with the next submittal of the Coventry Second Filing Subdivision, since that crossing should be improved as part of the improvements required of the Coventry Second Filing development and designed with this development's utility plans. Thank you for your attention to this matter. Please call me if you have any questions. Sincerely, Basil Hamdan Stormwater Utility City of Fort Collins !cc: Ted.Shepard r cc: Sheri Wamhoff 235 Mathews Street • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239 Soulb. Foil Colluts Sanitation District MEMO TO: Mr. Bud Curtiss, Northern Engineering FROM: Mr. Terry W. Farrill, Systems Engineer L DATE: October 24, 1995 RE: Coventry 2nd Filing The Fort Collins - Loveland Water District and the South Fort Collins Sanitation Distric: have reviewed the above mentioned project and submit the following comments; The existing sanitary sewer from MH 25 to the west property line is to be relocated, north, into Harmony Road. The elevations of the existing water line are to be verified to ensure that the water and sanitary sewer lines do not conflict. Erosion control is to be designed for the sanitary sewer line crossing at the Mail Creek Tributary. A casing pipe is to be install on the 8 inch water line. extending 10 feet on either side of the box culvert on Hinsdale south of Harmony Road. Wate line valves are to be installed on Hinsdale at the intersections of Harmony Road and Bently Place to provide isolation of the 8 inch water line during the installation of the casing. The existing 6 inch water is to be abandoned at the main in accordance with District requirements at the connections in Harmony Road and Hinsdale Drive. Note #7 on sheet 2 of 14 is to be revised to read; "The existing water and sanitary service lines are to be relocated in accordance with District requirements, at the developers expense, where conflicts with the City of Fort Collins Light and Power facilities occur." Please do not hesitate to contact me at 226-3104, ext. 14, if yju have any quest.iors.or require additional information. xc: Michael D. DiTullio, District Manager aw 9 1,:!:! -71 k 15 U.S. BEST ZS I 3\0 d C> �i f-- Y-1v,.3L-r ��ST preliminary approval of this revised channel section. This section has also been submitted to US West for their review. As you can see from this section, the original dimensions of the lots has not been affected. City of Fort Collins Stormwater Utility had previously commented that there will need to be a permanant stormwater crossing under Crest Road. It is the intent of the client to install this permanant crossing, to current City standard. This crossing will be sized to accomodate developed flows based on the study for Mail Creek recently completed by RBD, Inc. Plans for this improvement will be submitted to the City as a revision to the Coventry First Filing approved construction plans. Northern Engineering understands that further comments will be forthcoming from the City regarding this project. At that time we receive these additional comments we will also incorporate the above mentioned changes into the Final Utility Plans. We have attached sheets A-1 and A-2, which show the preliminary design of Harmony Road for 500' either side of the limits of construction, per an earlier request of the City. These sections were included in our latest submittal, but I understand that not all of the reviewing agencies received copies of the revised Utility plans. Please call if you have any questions regarding this letter, or any questions pertinent to the Coventry Second Filing submittal. Sincerely, - --� Roger A. Curtiss P.E. cc: Jim McCory, Colorado Land Source Tom Kehler, Jim Sell Design Sheri Wamhoff, City of Fort Collins Glen Schlueter, City of Fort Collins Terry Farrill, S. Ft. Collins Sanitation District Lucia Liley, March & Myatt Northern Engineering Services, Inc. November 1, 1995 Mr. Ted Shepard Community Planning and Environmental Services City of Fort Collins PO Box 580 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Coventry 2nd Filing Response to City Comments Dear Ted, This letter is in response to the comments regarding issues received regarding the Coventry Subdivision, Second Filing. As you may recall, this project was scheduled for the October 23rd P&Z Board on the consent agenda. Prior to the 23rd, I scheduled a Utility Coordination meeting, per the request of the City. At this meeting, two issues surfaced that alerted City staff that this project should be continued for a month. These two issues are summarized as; 1) The Ft. Collins/Loveland Water District had not seen the Utility plans, or had a chance to review and comment on the proposed improvements. 2) US West had requested a 15' exclusive phone easement to replace their exclusive easement that would be absorbed as part of the additional Right-of-way dedication along Harmony Road. It could not be determined at the Utility Coordination meeting whether this additional easement requirement might have any effect on the lot dimensions, and therefore project densities. Since this utility coordination meeting, Northern Engineering has submitted a set of Utility plans to the District, and have received comments, which will be incorporated into the final design documents. Attached is a copy of the comment letter from Terry Farrill. In regard to the second issue, I have attached a proposed section through Harmony Road, showing the new US West easement. This additional 15' was taken from the proposed drainage easement. The drainage channel was reconfigured to be contained entirely within the 25' alloted easement. We have contacted the Stormwater Utility for a 420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159