Loading...
HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 10/04/1995October 4, 1995 Ted Shepard, Senior Planner City of Ft. Collins, Planning 281 North College Ave. Ft. Collins, CO 80524 Dear Ted, Jim Sell Design Inc. has responded as follows to City comments which concern landscape portions of the Coventry Subdivision, Second Filing. Other comments are being addressed separately by the engineer. Item 5. We have spoken with Alan Rutts of City Light and Power to determine proposed streetlight locations along the south side of Harmony Road. These locations and our planting revisions, are indicated on the landscape plan. The westerly light falls in the center of a three tree grouping and the center tree was deleted in this case. No revisions were required at the center light. At the easterly light, the two tree grouping was shifted west to fall outside the suggested 40 foot setback. Item 6. A project note was added as directed. Item 7. A landscape catagories list was added as directed. Item 13. Lot numbers on the plat were changed to correspond to the Landscape Plan. Item 15. We are prepared to revise note number nine as needed to match language in the development agreement at the appropriate time. Item 16. A note was added to the project notes as directed. Please feel free to contact us with any questions or additional comments. Sincerely, JIM SELL DESIGN INC. O� Thomas W. Kehler Senior Landscape Architect kms rV J Sell De�S 117 nor Ave80524 Fort Cdli Gol� (30484-1921 November 16, 1995 Mr. Ted Shepard, Senior Planner City of Fort Collins Planning 281 North College Avenue Fort Collins, CO 80524 Dear Ted, I have enclosed the November 13, 1995, revised Final Landscape Plan for Coventry Subdivision, Second Filing. This revised plan incorporates comments submitted by the City on September 8, 1995, plus additional changes that developed after this date as a result of discussions on the drainage and utility easements along Harmony Road. Please feel free to contact us with any questions or additional comments. Sincerely, JIM SEET L DESIGN INC. Thomas W. Kehler Project Manager TWK/kms c: Northern Engineering Jim McCory, Colorado Land Source, LTD enc. 1 SellD Fort i��Wnlsg'21 W3) coe`� Northern Engineering Services, Inc. October 4, 1995 Mr. Ted Shepard Community Planning and Environmental Services City of Fort Collins PO Box 580 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Coventry 2nd Filing Response to City Comments Dear Ted, This letter is in response to the comments regarding issues received regarding the Coventry Subdivision, Second Filing. This letter will address those issues which are applicable to Northern Engineering Services, Inc (NES). All other issues will be addressed by Jim Sell Design, Ripley and Associates, or Landstar Surveying. Item 1 A-E, & 14 - These comments have been forwarded to Landstar Surveying, and they will incorporate these comments into the final plat. The Final plat will be resubmitted to your office as a separate submittal from Landstar. Item 2, 3, 4, & 17 - A Utility coordination meeting has been scheduled for October 12th at 1:30 at 281 North College. All comments from this meeting will also be incorporated into the Final Utility plans and the Final plat. Item 8 - Northern Engineering has received comments from Stormwater, and we have revised our Final Utility plans accordingly. Item 9 - Front Range Community College declined the request to grant the developer an easement. Therefore, we have revised our plans to show no grading or development to occur on their site. Item 10 - There is no irrigation ditch in the proximity of this project. Mail Creek is a regional drainage improvement. Therefore, no ditch approvals will be sought. Item 11 - We have reviewed the cross sections of Harmony Road adjacent to Hinsdale Drive. There are a couple of locations where there is less than 2% cross slope. This was done to provide clearance for the regional 420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159 drainage improvements under Hinsdale Drive. We will coordinate with Engineering to work towards a acceptable solution. Item 12 - Easements will be provided on the affected lots. Other individual concerns from the City provided under separate cover have been incorporated into our Final Utility plans, and these comments have also been returned to your office. Each pertinent reviewing agency can review their comments and our proposed revisions. Please call if you have any questions regarding this letter, or any questions pertinent to the Coventry Second Filing submittal. Sincerely, Roger A. Curtiss P.E. cc: Jim McCory, Colorado Land Source Tom Kehler, Jim Sell Design Kerrie Ashbeck, City of Fort Collins Glen Schlueter, City of Fort Collins