HomeMy WebLinkAboutWATERGLEN PUD PDP - 71 93A - CORRESPONDENCE - OTHER JURISDICTIONSUtility _.vices
Streets Department
City of Fort Collins
January 31, 1994
Mr. Ric Eversole
Mayor, Town of Timnath
P.O. Box 335
Timnath, Colorado 80547
Dear Mayor Eversole:
Since our phone conversation last week about the proposed
Project, I've talked with Keith Dixon, Director of PR-1
Development Division, about your concerns. As I mentioned in
we feel it is important to consider all input from people and
by a proposed development, so I appreciate your comments.
Waterglen Housing
Construction and
our conversation,
entities affected
Keith mentioned that Poudre R-1 is not comfortable taking a position one way or
another on any particular proposed development, to include the Waterglen project.
Instead, they continually try to project growth in different areas of the
District, and adjust individual school boundaries to accommodate new
developments. In this particular situation, PR-1 has projected growth in the NE
portion of Fort Collins in their long-range plan, and have taken actions to
accommodate this growth. For example, an addition to Eyestone Elementary School
in Wellington has been completed, and an addition to Tavelli Elementary School
is currently underway.
As you mentioned, elementary students from the Waterglen development would
currently attend Timnath Elementary. However, if the Waterglen project is
approved, PR-1 will work closely with the developer to project student loads and
adjust boundaries as needed to ensure school populations are reasonably balanced.
The additions at Eyestone and Tavelli are examples of how PR-1 is continually
trying to ensure that physical capacity is available to accommodate the boundary
changes anticipated as a result of growth or development.
Hope this helps. We -will continue to look at the overall impacts of the proposed
Waterglen project, and I will keep you informed of things that might impact
Timnath. For your information, this project is currently scheduled to go before
the Planning and Zoning Board for preliminary consideration on February 28.
Sincerely,
J o`er Ruiz
Project Manager
cc: Keith Dixon, PR-1
Libby Glass; W.W.. Reynolds
Steve Olt, City of Fort Collins Project Plannet
700 Wood Street • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6615