17. Parkland fees are $779.00 per dwelling unit and are collected
at the time of building permit issuance.
18. A note should be included on the landscape plan indicating
that Parks and Recreation will not be maintaining any
landscaping, including any landscaping in the ROW of Stuart
street. All landscaping needs to be maintained by a
Homeowner's Association or by individual property owners.
19. A traffic impact study will be required as part of the
submittal. The study should look at trip generation, impacts
on local streets, and access to Stuart Street.
20. Pedestrian access, through the site and connecting .to the
existing sidewalk/bike path system, should be addressed with
the plans. A 4' detached sidewalk, placed 4 1/ V behind the
curb, will be required on Stuart Street, if it is not already
constructed.
21. A standard. set of utility plans must be submitted by. a
registered engineer (State of Colorado registration).
22. At the time of final approval, the developer/owner will be
required to enter into.a development agreement with the City.
23. Street oversizing fees are $584.00 per unit and are payable at
the time of building permit issuance.
24. A standard planning submittal for a Planned Unit Development
requires a site and landscape plan, architectural elevations,
written documentation on planning objectives, point charts,
and other information as listed in the "Submittal
requirements" in the LDGS and the Development Manual.
25. The site design should be sensitive to existing residential
property to the east, west, and south. The area to. the south
is of particular concern and landscaping will be important to
buffer. existing units from.the new drive lane and garages.
26. A neighborhood meeting will be required. I have prepared a
notification area map for the .APO (affected property owner's)
list. Please submit the list when you are prepared to
schedule a neighborhood meeting. The Planning Department will
send out letters and schedule a meeting place.
6. It has been our experience in the past, that narrower streets
make it difficult to get all utilities in the ROW or
easements. You may have to provide wider front lot easements
to accommodate the utilities.
7. A utility coordination meeting will likely be necessary.
Kerrie Ashbeck will set up this meeting and contact the
various utility representatives. Normally this meeting is
held after your preliminary submittal.
8. The development will have to meet the Fire Access code. All
parts of the first.floor of all buildings must be within 150'
of an approved fire access road or lane. Emergency vehicles
do not back up and therefore they need through lanes or
approved. cul-de-sacs for turning.around. Contact Roger Frasco
at 221-6570 for more information.
9. Fire hydrants may be needed. They are normally spaced 800'
apart. Any building is to be within 400' of a hydrant.
10. Water and sewer mains need to be under asphalt or paved areas'
and no closer than 5' from curb and gutter. A 9' easement is
normally required behind the 54' ROW.
il.. Water is available in the western street. A sewer main will
have to be constructed in that street. You may be able to use
the existing individual services. If not, they will have to be
abandoned at the main. Contact Mark Taylor at 221- 6681 about
televising the existing sewer mains to determine the exact
location of these services and mains.
12. The detention pond at the north end of the property was not
constructed. This development will be responsible for
completing the design and construction of this area. Contact
Glen Schlueter, at 221-6589, for more.information.
13.. The property is located in the Spring Creek drainage basin.
Development fees for this basin are $1804.00 per acre, subject
to the coefficient of run-off.for the developed site.
14. No on -site detention is required, given the proximity to
Spring Creek, but if you are unable to convey flows to the
creek without detention, it should be provided in the location
indicated..
15. A standard drainage report and drainage and.grading plans will
be required with the submittal. An erosion control plan is
also a standard submittal requirement.
16. A portion of the site is located in the Floodplain of Spring
Creek as is currently shown on the FEMA maps. With the new
work done on the Spring Creek floodway, this area is
technically out of the flood plain. As the maps have not been
updated, you should show the existing flood plain on the site
plan.
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE:. October 25, 1993
ITEM:
APPLICANT:
LAND USE DATA:
Indian Hills West
John Prowty
3307 S..College Ave #200
Fort Collins, CO 80525
This is a request for 48 zero lot line residential units (cottage
concept with rear alley access garages) on 6.25 acres (8.1 du/ac),
located south of East Stuart Street, between Stover and Busch Ct.
COMMENTS:
1. Normal Light and Power development charges apply. Light and
Power normally goes in the front lot easements with meters on
garages. You will have to coordinate with Light and Power,
for an acceptable location for meters.
2. Power is stubbed into the south side of the site and is also
available on Stuart Street.
3. The property is located in the rp, Planned Residential, Zoning
District. There is a Planned Unit Development (PUD) condition
on the zoning, therefore, any use will be required to be
submitted and processed as a PUD according to the requirements
and criteria of the Land Development Guidance System (LDGS).
4. The street system will have to be approved by the City
Engineering Department and by Poudre Fire Authority. City
standards for local streets would apply if these are to be
publicly dedicated ROW. If these are privatestreets, they
need to look more like driveways than streets. City standards
call for 54' ROW (36' flowline to flowline). There is a
variance procedure available to you if your design concept
does not meet the strict standards. The variance should be
provided in written form and prepared by a licensed engineer.
5. If narrower streets are desired, there should be provisions
for off-street visitor parking. The Fire Authority has
concerns with parking on narrower, streets. Single loaded
streets may be 28' wide, without a variance.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)2216750
PLANNING DEPARTMENT
Commu,LLty Planning and Environmental services
Planning Department
City of Fort Collins
October 28, 1993
John Prowty
3307 S College Avenue
Fort Collins, CO 80525
Dear Mr. Prowty:
For your information, attached is a copy of the Staff's comments. concerning
I,ndian Hills West, presented before the Conceptual Review Team on .October 25,
1993.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project. application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If .you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirst�hetstone, AICP
Project Planner
KAW/gjd
Attachments
cc: Tom Peterson, Planning Director
Transportation Department
Stormwater Department
Project. Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750