HomeMy WebLinkAboutINDIAN HILLS VILLAGE PRELIMINARY PUD - 81 93 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSFinal mylars and other documents are due as soon as possible
following the hearing.
Please be aware that the development agreement and utility
plans must be signed prior to the Planning and Zoning Board
Hearing, for all PUD's. If not, a condition will be placed on
the project giving you 30 days to finalise the plans and
agreement, after which time, you must submit a request for an
extension, to the Planning and Zoning Board.
If you have.any questions about these comments or would like to
schedule a time to meet to discuss them, please contact me at 221-
6750.
Sincerely,
Kirsten Whetstone, AICP
Project Planner
cc Kerrie Ashbeck, Engineering Department
Downing, Thorpe, James
File
proceed simultaneously with the planning process. The project
would require preliminary approval prior to first reading of
the vacation, and second reading of the vacation would occur
after final Planning and Zoning Board approval. It would not
necessarily hold up the approval process. Please contact
Kerrie for more information. It may be worth pursuing this
vacation, if it gives you 5 or 10 feet of additional space to
work with.
30. Have the Indian Hills Townhouses HOA agreed to the landscaped
materials being added on their property? We will need to see
something in writing that they have agreed to this and will
maintain it. If.they do not agree, then the buffer will have
to be provided on your property.
31. Additional street trees should be provided on E. Stuart Street
close to streets within the street ROW and/or easements.
32. Overall I believe that this concept is exceptional, creative,
and addresses many of the typical concerns of infill medium
density into an existing residential neighborhood. I have
sent plans to some of the neighbors who requested them. It
might be a good idea to contact some of the neighbors and see
if they have additional concerns, ideas, etc. I've attached
the list of people who attended the neighborhood meeting. I
would be interested in attending such a meeting.
33. Stormwater comments will be forwarded to you under separate
cover and will also be sent to your engineer.
34. The signature block at the lower left side of the site plan
can be eliminated. This site plan will be approved by the
Planning and Zoning Board, signed by the Secretary of the
Planning and Zoning Board, not the Planning Director. You can
also delete the information in "( )" next to the word
"certification". The attorney's signature is not necessary on
the site plan, as long as the owner's signature is notarized.
35. An engineering signature block will be required on the final
plat, along with the other signatures. "Approved as to form
by the Director of Engineering for the City of Fort Collins."
36. Please delete the word "access" from the Solar Orientation
Ordinance information.
This concludes staff comments at this time. In order to stay on
schedule for the January 24, 1994 Planning and Zoning Board
hearing, please note the following deadlines:
Plan revisions are due January 4th (4 sets, of plans and
written documentation responding to the above concerns),
PMT's (one PNT of each plan sheet), colored renderings, and 8
prints are due January 17th.
street standards. The variance must be prepared by a
registered traffic engineer, especially for the extent of
variances involved with this project. Kerrie Ashbeck or Mike
Herzig can provide more information on this issue.
18. The preliminary plat does not have typical plat information on
it, such as curve data, geometrics for streets, horizontal
street alignment, lot size, etc.
19. The soils report indicates that there is ground water within
6' of the surface, near Stuart Street.
20. Engineering and Transportation have concerns with the sidewalk
on one side of the street and would like to discuss this
concept further. A sidewalk connection to the Stuart Street
sidewalk needs to be provided.
21. Parking lots must be a minimum of 8' in width.
22. Front and rear setbacks must be specific, they can not be a
range. It is best to state the minimum setback that would be
allowed for front, rear, side, and corner side.
23. Please include the attached standard notes on the landscape
plan. Include the note that "the Homeowner's Association
shall be responsible for maintenance of all common
landscaping, including that in the public ROW and the existing
10' alley."
9
24. Parkland fees are currently $779.00 per dwelling unit and are
collected at the time of building permit issuance.
25. The written material references "public" open space areas.
Staff wonders whether you mean private open space, ie for the
homeowners, or truly public open space, ie dedicated to the
public.
26. Natural Resources Department has reviewed this project and
believes that it meets the City's Air Quality Goals because it
provides in -fill development and higher densities, which in
turn helps reduce automobile dependency and sprawl. The land
use and location meet many of the City's land use policies.
27. When details about the replacement schedule for the elms, etc.
is available, please submit it for review by Natural Resources
and the City Forester..
28. The sidewalk along E. Stuart Street should be shown on the
site plan.
29. Please have a title company research the 10' alley. When we
know who.own's it, we can look into vacating it or otherwise
using it as a buffer strip. Kerrie Ashbeck would handle the
vacation. It would have to go to City Council, and could
I
heard from Public Service to know whether that is O.K. with
them.
8. You will also want to place trees such that electric and gas
line placement is not cramped. The issue of trees still needs
to be resolved for Light and Power and possibly other
utilities.. Contact Light and Power (221-6700) for information
on placing the existing utilities in the 10' "alley" to the
east, underground.
9. I believe that an additional utility coordination meeting is
necessary before approval of this project to bring all of the
utilities into agreement with you and each other.
10. Public Service requests a 13' easement adjacent to ROW and
front lot easements. They request that phone, TV, and
electric be in a joint trench adjacent to the sidewalks, with
gas parallel in easements.
11. Trees need to be a minimum of 4' away from the gas lines.
Please add a note to this effect on the site and landscape
plans.
12. Please provide street names at the time of final. Our
Engineering Mapping Division will review the names and assign
addresses on the plat.
13. Poudre Fire has stated that the 27' streets don't work for
them. They are requesting 36' street widths. Their concern
is with fire access and unenforceable on -street parking. I
will schedule a meeting with Planning, Engineering, Fire, and
Transportation early in January to discuss this issue. Does
Zanuary 3rd at 3:00 pm work for you?
14. Please provide a note on the site plan stating that "all
dwelling units .must have all portions of the first floor
exterior walls within 150' of an approved fire access drive or
public street. Lots 37, 40, and 43 appear to be out of
access. If private drives are used for emergency access
purposes or the 150' access measurement, they must meet fire
access road design criteria. Poudre Fire Authority suggests
that if residential fire sprinkler systems are provided, they
could entertain the narrower street widths and greater access
distance.
15. Gates must be provided in fences between units if units are
zero lot line.
16. The fire hydrant shown in the southeast corner will be
obstructed by parking. It must be moved or eliminated.
17. The variance request submitted is inadequate for Engineering's
review. It does not adequately address safety, maintenance,
etc. Please consult the City's guidelines for variances to
(MMF16N MUM
City of Fort Collins
Community Planning and Environmental Services
Planning Department
December 23, 1993
John Prouty
Lagunitas Co.
3307 S.. College Avenue #200
Fort Collins, CO 80525
Dear Mr. Prouty,
City Staff has reviewed your submittal for Indian Hills West PUD-
Preliminary, and offers the following written comments:
1. Review of these plans should not be construed as a.commitment
that telephone facilities sufficient to serve this project are
presently available. US West will provide telephone service
in accordance with the rates and tariffs on file with the
Colorado Utilities Commission.
2. Telephone facilities generally occupy rear lot utility
easements, which must be located on terrain which permits
trenching operations. If the developer prefers a front lot
telephone layout, the front lot easement should be wide enough
to accommodate all utilities that will be located there.
3. The developer is responsible for. providing all trench for
telephone facilities within the project, and the developer
pays. construction costs for those facilities before
construction begins.
4. Any relocation of existing telephone facilities required by
these plans will be paid for by the developer.
5. The developer may choose to provide joint trench for electric,
television, and telephone cables. In this case the developer
coordinates the placing sequence of each utility.
6. Placement of utility lines for this project is a major issue
for Light and Power due to the very tight restrictions on
space. Light and Power needs to see some indication that this
has been resolved to everyone's satisfaction before they feel
comfortable signing off on this development.
7. The last scenario had the water stop boxes placed 6" behind
the curb line. This would put the electric line 4' to 4.5'
behind the stop box and require the line to be staked by the
developer who would then take responsibility for its
placement. This is O.K. with Light and Power, but it pushes
the gas line further back in the easement and L&P has not
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750