Loading...
HomeMy WebLinkAboutINDIAN HILLS VILLAGE PUD PHASE 2 PRELIM AND FINAL - 81-93B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTSTEWART&NSSOC[ATES 10 S. MEL9331DRFM, FOR AX gT COLLINS, CO 80521 Consulting Engineers and Surveyors By: a. A Date: '/1p/ qs- Client: LAG U A/ I r As Sheet No. of ' Project: AI D/ A N T7 /L L f V i L L AG E �. (l , D P N A: f C Z Subject: rn P.,AA_ (A )ATF�i_ uA)/')Fl= �.ALGVL-AT/DAlf ----- — - _ � PE12. I ! I i � I I I i I i , i STEWART&OSSOCIATES 103 S- MEL933DR1FAX UM, FORT COLLINS, CO 80521 PH. 482-482-9382 Consulting Engineers and Surveyors By: R 4 PDate: z/ z QClient: A 6VA) 17-A,r Sheet No. of Project: --r A I D I A AJ PILLS IZZ Z- LA 6, E P-0 Subject: ST p te m A -rEe- ICyAl o)=-,= G. A I- e- 0 1- A 7�-/ AJ-f H is r.o..2.i c, �I� ij�i I i -P- 15 A 0'/0 A 'A 0.t olzo ------ ---- TIC '7 01144), /io A?zyR z '5 x 0. Zze, 01�zs- ')V Ji 70\ 0. 4�4— c r'r.' -p job os- x 0. 4 i,. I_. I I I .I - I i i I I i I ! i i I ! I i I I February 21, 1995 Page 2 The utility plans and grading and drainage plans for Indian Hills Village P.U.D. are being revised to show the changes that Indian Hills Village P.U.D., Phase Two will cause. The proposed plan does not change any of the grading or storm drainage facilities being constructed in the first phase. If you have any questions regarding this report, please call. ..Sincerely, ��P�� N. RUTyFq,, �V`%� Q�G1STEj;FG0 Richard A. Rutherford, P.E. & L. S. = * 5 2 8 President - rsC LF CO,f c,',,�� �1 N,,,l1060 STEWART&kSSOCIATES Consulting Engineers and Surveyors February 21, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: The following is the final drainage report for Indian Hills Village P.U.D., Phase Two. It is a 0.2265 acres tract in the Northeast comer of Indian Hills Village. The P.U.D. consists of a part of Tract "A", Indian Hills Village P.U.D., and a part of Indian Hills West P.U.D., which contained the existing house. The site is bounded on the North by East Stuart Street, on the East by Indian Hills, Second filing, and on the South and West by Driveway "I" of Indian Hills Village P.U.D.. There is an existing house and garage and driveway on the site. It is proposed to use the existing house on Lot 1 and build a new garage on Lot 1. Also, it is proposed to construct a new house on Lot 2 and raise the floor elevation of the garage on Lot 2. The impervious area in the developed site increases form the historic area of 0.069 acres to 0.081 acres. Some of the existing paved driveway on Lot 2 is being removed and the proposed house will replace the rest of the driveway. The existing driveway on Lot 2 will be closed and the garage will access from Driveway "1". The house on Lot 2 will also have a higher floor elevation to avoid any problems with stormwater at the exiting inlet on Stuart Street. The increase of stormwater runoff with the proposed P.U.D. is from 0.25 c.f.s. to 0.29 c1s. in the minor storm. The major storm runoff increases from 0.90 a.f.s. to 1.04 c.f.s. with the new layout. Due to the close proximity to Spring Creek, there is no onsite.stormwater detention required. The site will continue to drain to the existing inlet in Stuart Street. The existing inlet cannot accept all of the runoff that drains to it, and so the runoff historically will overtop Stuart Street. The 0.04 c.f.s. increase will be rather insignificant in the amount of water that presently overtops the street. The silt fence will be extended along the South side of East Stuart Street to the Northeast comer of the P.U.D. for erosion control purposes. February 21, 1995 James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 STORM DRAINAGE REPORT FOR INDIAN HILLS VILLAGE, P.U.D., PHASE 2 PREPARED FOR THE LAGUNITAS COMPANY FEBRUARY 21, 1995 STEWART & ASSOCIATES, INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 303/482-9331