Loading...
HomeMy WebLinkAboutINDIAN HILLS VILLAGE PUD PHASE 2 PRELIM AND FINAL - 81-93B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS4. Building Inspections concerns have been met. Fire wall requirements will be noted on the site plan. 5. Existing electrical vault will be used and trees will be removed as required to provide the necessary access to same. 6. This property will become part of the existing Indian Hills Village Homeowners Association and snow removal will be handled by this association. 7. Water Conservation standards and guidelines will be complied with 8. City Forester has visited site, developer has met with City Forester, plan has been worked out with regard to which trees to save, remove, thin and replace. His requested tree protection language will be included as notes on the landscape plan. 9. Water and Waste Water comments have been responded to by our engineer. 10. Engineering requests for subdivision plat, clarified tract A-1 and tract A-2 boundaries and Stuart Street curb and gutter extension have been met. 11. We had a meeting with Storm Drainage, our engineer and myself and have resolved how to integrate this small site into the existing Indian Hills Village storm water plan. 12. Clarification on the site plan regarding lots 1 and 2 have been made. If there are any more concerns which need to be addressed, please let me know ASAP. We respectively request a quick approval of this combined preliminary - final minor PUD in order that this outlot can be efficiently integrated into the Indian Hills Village project. Thank ypu. Sinc re , Jon th J. Pres t dk April 5, 1995 Mr. Steve Olt, Planner City of Fort Collins Planning Department 281 N. College Fort Collins, CO 80522 RE: 601 E. Stuart Street / Combined Preliminary - Final PUD Dear Steve: This request is for a combined preliminary - final PUD approval for a minor PUD for the purpose of integrating a small outlot into the established Indian Hills Village PUD. Specifically, this property is a small outlot at the northeast corner of the Indian Hills Village development. Your approval of this combined preliminary - final PUD at this time will enable this existing residence and building site to be incorporated into the Indian Hills Village development currently under way in an efficient and expeditious manner. In general, the result which we desire to achieve is integrating the existing residence into the Indian Hills development, adding one additional building site, removing the existing driveway access from Stuart Street, providing access to garages from the internal Indian Hills Village private drive street which runs adjacent to this property, integrating this property into the Indian Hills Village Homeowners Association for control purposes and extending the presently planned Indian Hills Village landscaping along Stuart Street so that it integrates with the Stuart Street frontage in front of this existing house and building site. In more specific response to your comments: 1. Public Service's requirements will be met. 2. Columbine's request will be satisfied. 3. Property will be replatted. Plat is being submitted at this time. 3307 South College Avenue, Suite 200, Fort Collins, CO 80525 • (303) 226-5000 • Fax (303) 226-5125