HomeMy WebLinkAboutINDIAN HILLS VILLAGE FINAL PUD - 81 93A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSt The sidewalk culvert should also be"designed, along with the concrete pan leading to it. Please address flooding potential for the garage shown in a street cross-section near this pan. Please address the impacts of the increased flows to the existing inlet. Confirm that there is room in this inlet and the downstream facilities for the increased flows that Indian Hills Village will add. 'C' coefficients throughout the site do not reflect the amounts of impervious area that the site plan shows. For example, the composite 'C' coefficient calculations for basin C shows almost half the site to be impervious, but the building envelope shown on the site plan indicates that the amount of impervious area will be much less than this. Please revise these, coefficients accordingly. Please check street capacities for both the 2 year and the 100 year storm. Grading plan needs more detail, including .all street and swale slopes, high points of all roads, elevations showing how drainage will be conveyed around the homes, and enough elevations to completely define all swales and pans. Please provide more detail as to how flows from roads and offsite areas will reach the east -side and west -side swales. Specifically, certain areas are shown crossing curbs and sidewalks without chases being used, and offsite swales are.shown draining into onsite basins, not into the swales. Please provide more detail as to the guarantee of complete restoration of the area adjacent to Spring Creek. A list of requirements was sent back with the return of the preliminary submittal. Please address these issues. Please address tailwater issues with the storm sewer drain at Spring Creek. If the 100-year wsel is higher than the crown of the pipe at the outlet, tailwater effects could reduce the amount of drainage obtained by the storm drains, or conceivably it could introduce flows into the site. Please see additional comments in the drainage report, on all plan sheets, and on the drainage report checklist. indnhl.fin PROJECT COMMENT SHEET 5 April1994 DEPARTMENT: PROJECT: 81-93A INDIAN HILLS PUD.- Final PLANNER: Kirsten Whetstone Please respond to this project by Friday, April 15,1994. No Problems 0 Problems or concerns (see below) The 100 year storm has not been addressed with this submittal. Please provide a plan, and verification of this plan, for the major storm, demonstrating that street criteria will not be exceeded, and that flooding will not occur around the area inlet, or into garages in the surrounding area. Please verify that flows from this storm will be safely conveyed to Spring Creek. All swales and concrete pans need to be designed. These designs should take into account the major storm. A cross- section of all swales should be shown on the drainage plan, showing .the 100-year depth and the freeboard provided. Please include offsite flows in all swale designs where appropriate. It will need to be shown that the loo-year storm, with freeboard, will not impose on the adjoining properties. Please include the spot elevations of the adjoining properties on both sides. Date:_ -L C Signature: l CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT PROJECT �A�,�o,„Collins COMMENT SHEET DATE: 5 April1994 DEPARTMENT: PROJECT: 81-93A INDIAN HILLS PUD - Final PLANNER: Kirsten Whetstone Please respond to this project by Friday, April 15,1994. No Problems 0 Problems or concerns (see below) TNG—EC�s1� (�0��5 NUT MArc.H 7—r+6 h-t 4 (O� 5Z7.37 L.EC�A l VS . 1N'- CUr2va— IS .I. )4CI41,..9 s pace t'� t 5 h at >-vl e w l l II JG.' �n1 Ge 'ti F-4S F n- ?• at-' c:k- 0Ln.1vv'aV,- �yo`^ti• EyneP. SeYvJcef pOs+ C)Pic, opt � O W � 4 G C1 N S5 Date: Signature: CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS: rOMM1INITV PLANNING & 0 PLAT L "J7 C G-j, O SITE U re a � : k. LANDSCAPE 0 UTILITY ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT a questions, please contact Mike Herzig at 221-6750. 29. You will also need variances for curvature that does not meet current City standards and for the proposed 7' parking lanes. 30. Street cross -sections need to be revised. 31. There may be addressing problems for the loop street. 32. Hastings Place has already been used. Please choose another street name. 33. Please describe the accent paving. 35. The Title of the Site Plan should match the title of the plat, ie "Indian Hills.Village PUD". This concludes staff comments at this time. In order to stay on schedule for the May 23, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due May 6th by 8:30 an for Final Review (3 sets of plans and written documentation responding to the above concerns), PMT1s (one PMT of each plan sheet), colored renderings, and e prints are due May 16th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUD's. If not, a condition will be placed on the project giving you 30 days to finalise the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, KirC`sten Whetstone, AICP Project.Planner cc Kerrie Ashbeck, Engineering Department Stewart and Associates 20. Please rework the plant legend with sizes, quantities, and labels for species. Remove the note about sizes, species, and quantities to be determined by the Landscape Architect prior to construction. In Fort Collins, all of that information must be provided prior to Planning and Zoning Board approval. 21. Trees planted between. the sidewalk and curb on city ROW can be of the follow types only: Shade Trees: Green Ash, Hackberry, Burr Oak, American Linden, and Littleleaf Linden. Ornamental Trees: Radiant Crabapple, Springsnow Crabapple, Mayday Tree. 22. Please rework the general note #3. The City Forester suggests the following wording: The east and west tree lines shall be thinned, pruned, and replaced starting the first year and extending over a 10 year period. The City Forestry Department shall be consulted about this work. The management plan is on file in the Planning Department. All interior trees will be pruned to city's medium prune standards. 23. Please add street trees between Lot 1 and Stuart Street. Please add street trees between Lots 33-36 and Stuart Street. Fort Collins is a "Tree City" and it is important to provide shade trees on all collector streets. These trees should be planted as close to the street as possible. 24. Please remove the note on the far left side of the site plan, regarding"150' access. The first part of that note, up to "within 150' of an approved fire access drive or public street", should be added as a general note #3. The rest of the note should be deleted. The units on Stuart Street will be addressed off of Stuart Street, there. is not a problem with - fire access to these units. 25. Would you consider having a single garbage removal contractor for the entire development? This would cut down on the number of trucks entering the development, reducing miles and pollution. 26. Please indicate that the open space is "Existing Private Open Space" . Please remove any reference to a gazebo, see attached letter from Indian Hills Townhouses. 27. -Add a note to the plat that a variance to the requirements of the Solar Orientation Ordinance was granted at the time. of preliminary approval (ie revise the existing note). 28. You will need a formal, written variance from a traffic engineer, to address turnaround requirements for Hastings Place and Prouty Court. Engineering does not have the information they need to base a decision on. If you have 9. Easements on the plat don't match the site plan. The plat easements are ok with Public Service, except that the private drives also need to be dedicated as utility easements. 10. No trees shall be planted within 4' of gas lines. 11. Power, phone, and cable TV need to be joint trench adjacent to walks and PSC gas will be in parallel easements. 12. Please see attached comment sheet for Stormwater Utility comments. The drainage report and plans are not sufficient for final approval. Staff will wait to see what comes in at revision time, but strongly suggests that you hold off on the final Planning and Zoning Board date until all of the major drainage issues are adequately addressed. If the project is appealed, for lack of a final drainage plan or for whatever reason, you will lose much more time. Staff suggests that you take the time you need to get the drainage submittal in final form and delay until the June 27th Planning and Zoning Board date. 13. Please see attached comment sheet for Mapping Division's comments on the plat.. 14. The setback information diagram is not acceptable. Setbacks must be a single number, can't be 3' or 41, which is it? 15. Section 504 of the 1991 edition of the UBC as adopted by the City requires that exterior walls of one and two family dwellings located closer than 3 feet from a property line be of one hour fire resistive construction. A parapet extending 30 inches above the roof surface is required unless the structure complies with the exceptions to Section 1710. Projections, such as cornices, eave overhangs or exterior balconies shall not extend over the property line and must comply with UBC sections 1711 and 504. 16. Please make a note on the site plan that parking will not be allowed on the south side of.Stuart Street. This area will need to be signed. Please call Tom Vosburg at Transportation (221-6608) if you have questions. 17. Parkland fees are $779.00 per dwelling unit, collected at the time.of building permit issuance. 18. Street oversizing fees are $584.00 per dwelling unit, collected at the time of building permit issuance. 19. Parks will not maintain any landscaping in the ROW or in the 10' alley area. This must be maintained by the HOA and will be subject to the language of the Site and Landscape Covenants filed at the City with the site plan. Commt y Planning and Environmental rvices Planning Department City of Fort Collins April 28, 1994 John Prouty Lagunitas Co. 3307 S. College Avenue #200 Fort Collins, CO 80525 Dear Mr. Prouty, City Staff has reviewed your submittal for Indian Hills Village PUD- Final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. Telephone facilities generally occupy rear lot utility easements. If the developer prefers a front lot telephone layout, the front lot easement should be wide enough to accommodate all utilities that will be located there. The developer will be responsible to provide recorded easements for the telephone cables as placed. 3. The developer is responsible for provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 4. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 5. The developer may choose to provide joint trench for electric, television, and telephone cables. In this case, the developer coordinates the placing sequence of each utility. 6. Light and Power will require a utility coordinating meeting before approving final plans. 7. Additional easements will be required per enclosed map. 8. Some trees will need to be relocated per enclosed landscape map. Large shade trees need to be located a minimum of 40' from lights and ornamental trees need 151. Have you resolved your street lighting request with Light and Power? 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750