Loading...
HomeMy WebLinkAboutFIRE STATION #12, FALCON RIDGE PUD - PRELIMINARY / FINAL - 2-94H - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYC HCS: Unsignalized Intersections Release 2.1c Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) parking lot access (E-W) country club road Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ............. .----- mjd Date of Analysis.......... 8/22 96 Other Information.........am p 1994 short long Two-way Stop -controlled Intersection -; Eastbound ; Westbound ; Northbound ; Southbound L T R L T R; L T R; L T R '---- ----'---- ----'---- ---- ----'---- ---- ---- No. Lanes ; 0 1 < 0 0 > 1 0 0 > 0 < 0 0 0 0 Stop/Yield ; N; N; Volumes i 286 2; 1 197 2 1; PHF .9 .9: .9 .9 1 .9 .9; Grade 0 0 - I 0 MC's (%) I SU/RV's CV's (%) I I ' PCE's ; 11.10 :1.10 ------------------------------ 7----------- ----------------------------- 1.101 Adjustment Factors - Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1c Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB ------------------------------------------------------- Conflicting Flows: (vph) 319 Potential Capacity: (pcph) 954 Movement Capacity: (pcph) 954 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 2: LT from Major Street WB-----------EB ------------------------------------------ Conflicting Flows: (vph) 320 Potential Capacity: (pcph) 1207 Movement Capacity: (pcph) 1207 Prob. of Queue -Free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 1.00 , -------------------------------------------------------- Step 4: LT from Minor Street N8 S5 -------------------------------------------------------- Conflicting Flows: (vph) 539 Potential Capacity: (pcph) 516 Major LT, Minor TH Impedance Factor-- 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor ' due to Impeding Movements 1.00 Movement Capacity: (pcph) -------------------------------------------------------- 516 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length .LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- ------ ------ ------------- NB L 2 516 > ------- ----- --------- 609 5.9 0.0 B 5.9 NB R 1 954 > WB L 1 1207 3.0 0.0 A 0.0 Intersection Delay = 0.0 sec/veh HCS: Unsignalized Intersections Release 2.1c Page 1 ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) parking lot access (E-W) country club road Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... mjd Date of Analysis.......... am Other Information....... am pm 1994 short pm long Two-way Stop -controlled In rsection Eastbound ; Westbound Northbound ; Southbound L T R L T R L T R L T R I---- ---- ---- ---- --------;---- ---- No. Lanes ; 0 1 < 0 ; 0 > 1 0 0 > 0 ---- I---- < 0 0 0 0 Stop/Yield ; N; N; ; Volumes ; 149 3; 1 235 ; 3 1; PHF .9 .9; .9 .9 .9 .9; Grade ; 0 0 ; 0 MC's (%) ; SU/RV's (%)I CV's (%) PCE's ; 11.10 :1.10 ----------------------------------------------------------------------- 1.10: Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) ---------- ------------------------------------------------------- Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1c Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 168 Potential Capacity: (pcph) 1138 Movement Capacity: (pcph) 1138 Prob. of Queue -Free State: 1.00 " -------------------------------------------------------- Step 2: LT from Major Street-------------WB-----------EB ------: LT from -Major -Street Conflicting Flows: (vph) 169 Potential Capacity: (pcph) 1424 Movement Capacity: (pcph) 1424 Prob. of Queue -Free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 1.00 ------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Confl'icting Flows: (vph) 430 Potential Capacity: (pcph) 597 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) -------------------------------------------------------- 597 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) -------- ------ ------ ------ -------------- (sec/veh) NB L 3 597 > ----- --------- 678 5.3 0.0 B 5.3 NB R 1 1138 > WB L 1 1424 2.5 0.0 A 0.0 Intersection Delay = 0.1 sec/veh HCM: SIGNALIZEE) INTERSECTION SUMMARY Version 2.4c 08-22-1996 I HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4c 08-22-1996 enter For Microcomputers In Transportation Center For Microcomputers In Transportation Streets: (E-W) country club road (N-S) sh1 Streets: (E-W) country club road (N-S) shl Analyst: Matt Area Type: Othe File Name: 8-22-96 am pm Analyst: Matt Area Type: Other File Name: 8-22-96 am pm Comment: short long ong Comment: short 1 Eastbound ; Westbound ; Northbound Southbound , Eastbound ; Westbound , Northbound Southbound L T R L T R L T R: L T R L T R L T R; L T R; L T R ---- ---- ----I---- ---- ----;---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- --------1---- ---- ---- No. Lanes ; ; i 1; 1 1; 1 1 No. Lanes 1 ; 1 1; 1 1 7 7 Volumes 222 161 131 1151 37 493 Volumes 161 38; 615 2501 36 271 PHF or PKI51 10.90 0.90: 0.90 0.90:0.90 0.90 PHF or PK151 :0.90 0.90: 0.90 0.90:0.90 0.90 Lane W (ft); :12.0 12.01 12.0 12.0;12.0 12.0 Lane W (ft); :12.0 12.0; 12.0 12.0;12.0 12.0 Grade i 0 0 0 Grade ; 0 0 i 0 % Heavy Veh; ; 1 1; 2 1; 1 2 % Heavy Veh; ; 7 1: 2 1; 1 2 Parking :(Y/N) N t(Y/N) N j(Y/N) N Parking :(Y/N) N :(Y/N) N :(Y/N) N Bus Stops I 0; 0; 0 Bus Stops 1 I 0; 0; 0 Con. Peds ; 0; 0; 0; 0 Con. Peds ; 0; 0; 0; 0 Ped Button ; ;(Y/N) N ;(Y/N) N ;(Y/N) N Pod Button ; ;(Y/N) N ;(Y/N) N ;(Y/N) N Arr Type ; i 3 3; 3 3; 3 3 1 Arr Type ; 3 3; 3 3; 3 3 RTOR Vols ; ; 0; 01 0 1 RTOR Vols ; 0; 0; 0 Lost Time :3.00 3.001 3.00 3.0013.00 3.00 Lost Time :3.00 3.00: 3.00 3.00:3.00 3.00 Prop. Share; I I Prop. Share; ; Prop. Prot.: i Prop. Prot.; _______________________________________________________________________ , __9_-_---------- Signal Operations Signal Operations Phase Combination 1 2 3 4; 5 6 7 8 Phase Combination 1 2 3 4; 5 6 7 8 EB Left ;NB Left EB Left ;NB Left Thru ; Thru * Thru ; Thru Right Right •* Right Right Peds ; Peds Peds ; Peds WB Left * ;SB Left * WB Left * ;SB Left Thru Thru * Thru ; Thru Right * ; Right Right * Right Peds ; Peds Peds ; Peds NB Right ;EB Right NB Right ;EB Right SB Right :WB Right SB Right ;WB Right Green 15.OA ;Green 55.OP I Green 15.OA ;Green 55.OP Yellow/AR 5.0 ;Yellow/AR 5.0 , Yellow/AR 5.0 ;Yellow/AR 5.0 Cycle Length: 80 secs Phase combination order: #1 #5 Cycle Length: 80 secs Phase combination ----------------------------------------------------------------------- order: #7 #5 ----------------------------------------------------------------------- Intersection Performance Summary Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- Mvmts Cap Flow Ratio ----- ---- ------- ----- Ratio Delay LOS Delay ----- LOS ----- ---- WB L 380 ------- ----- 1787 0.650 ----- ----- --- ----- 0.213 21.3 C 21.0 C WB L 380 1787 0.471 ----- --- ----- 0.213 18.5 C 18.1 --- C R 340 1599 0.053 0.213 16.2 C R 340 1599 0.124 0.213 16.5 C NB T 1327 1863 0.110 0.712 2.3 A 2.3 A NB T 1327 1863 0.515 0.712 3.7 A 3.4 A R 1139 1599 0.112 0.712 2.3 A R 1139 1599 0.244 0.712 2.6 A SB L 879 1234 0.047 0.712 2.2 A 3.1 A SB L 153 215 0.274 0.712 2.9 A 2.6 A T 1327 1863 0.413 0.712 3.2 A T 1327 1863 0.227 0.712 2.6 A Intersection Delay = 7.1 sec/veh Intersection LOS = B Intersection Delay = 5.3 sec/veh Intersection LOS = B Lost Time/Cycle. L ----------------------------------------------------------------------- = 6.0 sec Critical v/c(x) = 0.467 Lost Time/Cycle. L = 6.0 sec Critical ---------------------------------------------------------------------- v/c(x) = 0.505 APPENDIX C HCS: Unsignalized Intersections Release 2.1c Page 1 Center For Microcomputers In Transportation University of Florida 512 Well Hall Gainesville. FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) parking lot access (E-W) country club road Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... mjd Date of Analysis.......... 8/2 Other Information ......... am pm 1994 short long Two-way Stop -controlled Interse ion Eastbound Westbound I Northbound , Southbound L T R; L T R; L T R L T R ---- --- ---- ---- --- -- ---- ----I---- ---- ---- No. Lanes 0 1 < 0 ; 0 > 1 0 � 0 > 0 < 0 ; 0 0 0 Stop/Yield N; N; ; Volumes ; 187 2; 1 127 2 1; PHF 1 .9 .9; .9 .9 1 .9 .9; Grade 0 0 0 MC's (%) ; i i SU/RV's CV's (%) PCE's ; 11.10 :1.10 1.10: ----------------------------------------------------------------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 0 HCS: Unsignalized Intersections Release 2.1c Page 2 Worksheet for TWSC Intersection ------------------------------------------- Step 1: RT from Minor Street NB Conflicting Flows: (vph) 209 Potential Capacity: (pcph) 1085 Movement Capacity: (pcph) 1085 Prob. of Queue -Free State: 1.00 Step- ------------- 2: LT from Major StreetWB_-_--_-----EB '------------------------------------------ Conflicting Flows: -(vph) 210 Potential Capacity: (pcph) 1361 Movement Capacity: (pcph) 1361 Prob. of Queue -Free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 1.00 ---"'-------------------------------------------------- Step 4: LT from Minor Street NB SB ________________________________________________________ Conf Ticting Flows: (vph) 351 Potential Capacity: (pcph) 663 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) -------------------------------------------------------- 662 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length .LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) -------- ------ ------ ------ ------- ------- ----- (sec/veh) --------- NB L 2 662 > 761 4.7 0.0 A 4.7 NB R 1 1085 > WB L 1 1361 2.6 0.0 A 0.0 Intersection Delay = 0.1 sec/veh HCS: Unsignalized Intersections Release 2.1c Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) parking lot access (E-W) country club road Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... mjd Date of Analysis......... 8/22/96 Other Information....... .am pm 1994 short long Two-way Stop -controlled eisection Eastbound , Westbound ; Northbound Southbound L T R L T R L T R L T R ---- ---- --- --- ---- ----I---- ---- --- ---- ---- ---- No. Lanes ; 0 1 < 0 ; 0 > 1 0 ; 0 > 0 < 0 0 0 0 Stop/Yield N; N; ; Volumes 95 3i 1 151 3 1; PHF .9 .9; .9 .9 .9 .9; Grade 0 0 ' 0 ; MC's (%) SU/RV's (%); CV's (%) PCE's ; :1.10 ;1.10 1.10: Adjustment Factors Vehicle Maneuver Left Turn Major Road Right Turn Minor Road Through Traffic Minor Road Left Turn Minor Road Critical Follow-up Gap (tg) ---------------------------- Time (tf) 5.00 2.10 5.50 2.60 6.00 3.30 6.50 3.40 HCS: Unsignalized Intersections Release 2.1c Page 2 Worksheet for TWSC Intersection --------------------------- Step 1: RT from Minor Street Conflicting Flows: (vph) Potential Capacity: (pcph) Movement Capacity: (pcph) Prob. of Queue -Free State: --------------------------------- Step 2: LT from Major Street --------------------------------- Conflicting Flows: (vph) Potential Capacity: (pcph) Movement Capacity: (pcph) Prob. of Queue -Free State: TH Saturation Flow Rate: (pcphpl) RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: Step 4: LT from Minor Street Confiicting Flows: (vph) Potential Capacity: (pcph) Major LT, Minor TH Impedance Factor: Adjusted Impedance Factor: Capacity Adjustment Factor due to Impeding Movements Movement Capacity: (pcph) --------------- NB SB 108 1221 1221 1.00 _________________ WBEB ----------- -- 109 1521 1521 1.00 1700 1_00 NB 276 733 1.00 1.00 1.00 732 SB Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement -------- (pcph) ------ (pcph) (pcph)(sec/veh) ------ ------ (veh) (sec/veh) NB L 3 ------- 732 > ------- ----- --------- 813 4.4 0.0 A 4.4 NB R 1 1221 > WB L 1 1521 2.4 0.0 A 0.0 Intersection Delay = 0.1 sec/veh HCM: SIGNAL IZEDnjNNTEer PECM[ONoSUMMuters InrVonsoo4 ation 08-22-1996 Streets: (E-W) country club road (N-S) shl Analyst: Matt File Name: Area Type• her 8-22-9 am pm Comment short long Eastbound ; Westbound ; Northbound ; Southbound L T R; L T R; L T ---- R; L ----;---- T R ---- ---- ---- --------1---- No. Lanes 1 ---- ---- ---- 1 1 1; 1 1 Volumes 144 10; 107 74: 24 396 PHF or PK15: :0.90 0.901 0.90 0.90:0.90 0.90 Lane W (ft); :12.0 12.0; 12.0 12.0;12.0 12.0 Grade i 0 0 i 0 % Heavy Veh; ; 1 1! 2 1; 1 2 Parking ; ;(Y/N) N :(Y/N) N ;(Y/N) N Bus Stops ; 0; 0; 0 Con. Peds 0; 0; 0; 0 Ped Button ; ;(Y/N) N ;(Y/N) N ;(Y/N) N Arr Type 3 3; 3 3; 3 3 RTOR Vols ; 0; 0; 0 Lost Time ; 13.00 3.00: 3.00 3.00:3.00 3.00 Prop. Share; I ' Prop. Prot.; _______________________________________________________________________ 1 Signal Operations Phase Combination 1 2 3 4; 5 EB Left ;NB Left Thru Thru Right Right Peds ; Peds WB Left * :SB Left Thru ; Thru Right * ; Right Peds ; Peds NB Right ;EB Right SB Right ;WB Right Green 15.OA ;Green 55.OP Yellow/AR 5.0 ;Yellow/AR 5.0 Cycle Length: 80 secs Phase combination order: #1 #5 -------------------------------- Intersection Performance Summary HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4c 08-22-1996 Center For Microcomputers In Transportation ------------------------------- Streets: (E-W) (E-W) country club road (N-S) shl Analyst: Matt Area Type: er File Name 8-22-96 a pm Commen short long _________________________ Eastbound Westbound ' Northbound ; Southbound L T '---- R; L T R; L T R; L T R ---- ---- No. Lanes ; ---- ---- ; 1 ----I---- 1; ---- ----I---- 1 1 1 ---- ---- 1 Volumes - 104 25: 394 162: 27 213 PHF or PK15: 10.90- 0.90: 0.90 0.90:0.90 0.90 Lane W (ft); 112.0 12.0; 12.0 12.0112.0 12.0 Grade ; ; 0 ; 0 ; 0 % Heavy Veh; 1 1; 2 1; 1 2 Parking ;(Y/N) N ;(Y/N) N i(Y/N) N Bus Stops i i 0; 0; 0 Con. Peds 0; 0; 0; 0 Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N Arr Type 3 3; 3 31 3 3 RTOR Vols 0; 0; 0 Lost Time 13.00 3.00: 3.00 3.00:3.00 3.00 Prop. Share; Prop. Prot.: 6 7 8 Phase Combination EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- WB L 380 1787 0.421 0.213 18.1 C 17.9 C R 340 1599 0.032 0.213 16.1 C NB T 1327 1863 0.090 0.712 2.3 A 2.3 A R 1139 1599 0.072 0.712 2.3 A SB L 933 1309 0.029 0.712 2.2 A 2.8 A T 1327 1863 0.333 0.712 2.9 A Intersection Delay = 5.8 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.353 * * Green 15.OA Yellow/AR 5.0 Cycle Length: 80 secs Signal Operations 2 3 4 ; 5 ;NB Left Thru Right Peds ;SB Left Thru Right Peds ;EB Right ;WB Right ;Green 55.OP ;Yellow/AR 5.0 Phase combination order: #1 #5 8 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- ----- --- ----- --- WB L 380 1787 0.305 0.213 17.3 C 17.1 C R 340 1599 0.082 0.213 16.3 C NB T 1327 1863 0.330 0.712 2.8 A 2.7 A R 1139 1599 0.158 0.712 2.4 A SB L 413 579 0.073 0.712 2.3 A 2.4 A T 1327 1863 0.179 0.712 2.5 A Intersection Delay = 4.7 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sac Critical v/c(x) = 0.324 HCS: Unsignalized Intersections Release 2.1c Page 1 Center For Microcomputers In Transportation HCS: Unsignalized Intersections Release 2. is University of Florida- 512 Weil Hall Worksheetfor TWSC Intersection Gainesville, FL 32611-2083 -------------------------------------------------------- --------- Ph: (904) 392-0376 __________________________________________________________________ _-___--: - ------------------'-----W) Step 1: RT from Minor Street WB EB Streets: (N-5) sh1 (E-W) (N-S) shl county club road y _______________________________ ------cti Conflicting Flows: (vph) 431 Major Street Direction.... NS Potential Capacity: (pcph) 831 Length of Time Analyzed... 60 (min) Movement Capacity: (pcph) 831 Analyst ................... mjd Date of Analysis.......... 8/226 Prob. of Queue -Free State: 0.96 Other Information ......... am m 1994 short long ----------------------------------------------------'-- Step 2: LT from Major Street SB NB Two-way Stop -controlled Intersection -------------------------------------------------------- ---------------------------_---------'----------- ----------------------------------------------- ----------------------- Northbound Southbound ; Eastbound ; Westbound Conflicting Flows: (vph) 618 ' L T R; L T R; L T R; L T R Potential Capacity: (pcph) 870 '---- ---- ----'---- --------'---- ---- ----'---- ---- ---- Movement Capacity: (pcph) I 870 Prob. of Queue -Free State: 0.96 No. Lanes 0 1 1 , 1 1 0 , 0 0 0 , 0 > 0 < 0 ------- ---------------------------- Stop/Yield I N: N: Volumes 394 162: 27 213 1 104 25 ---- ----------- ------ Step 4: LT from Minor Street WB EB PHF , 9' 9 0 Conflicting Flows: (vph) 705 Grade 0 0 ( Potential Capacity: (pcph) 414 414 MC's (%) SU/RV's (%); i Major LT, Minor TH CV's (%) ' ' ' Impedance Factor: 0.96 PCE's ; :1.10 ; :1.10 1.10 Adjusted Impedance Factor: 0.96 ---------------------------------------------------------------------- Capacity Adjustment Factor due to Impeding Movements 0.96 i Movement Capacity: (pcph) -------------------------------------------------------- 398 Adjustment Factors Intersection Performance Summary Vehicle Critical Follow-up - Maneuver Gapt Time (tf) Avg. - --_-___-_----------_ Flow Move Shared Total Queue Approach _________________________________________-9- Left Turn Major Road 5.00 2.10 Rate Cap Cap Delay Length LOS Delay Right Turn Minor Road 5.50 2.60 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) Through Traffic Minor Road 6.0 3.30 '------- ------ ------ ------ ------- ------- ----- --------- Left Turn Minor Road 6.50 3.40 WB L 128 398 > 443 12.7 1.9 C 12.7 WB R 31 831 > SB L 33 870 4.3 0.0 A 0.5 Intersection Delay = 1.9 sec/veh Page 2 HCS: Unsignalized Intersections Release 2.1c i --Page-1 HCS: Unsignalized Intersections Release 2.1c Page 2 Center For Microcomputers In Transportation =--------------------------------------- ----------- -------- University of Florida ' 512 Weil Hall Worksheet for TWSC Intersection Gainesville, FL 32611-2083 ------------------------------------------------------- Ph: (904) 392-0378 Step 1: RT from Minor Street -------------------------------------------------------- WB EB -----'---------'--------------------'---------------------- Streets: (N-S) shl (E-W) country club road Conflicting Flows: (vph) 119 Major Street Direction.... NS Potential Capacity: (pcph) 1205 Length of Time Analyzed... 60 (min) Movement Capacity: (pcph) 1205 Analyst ................... mjd Prob. of Queue -Free State: 0.99 Date of Analysis.......... 8/22/96 Other Information........ am Pm 1994 short long ------------------------------------------ Step 2: LT from Major Street ------------- SB NB e Two-way Stop -controlled In err ction i --------------------------,----------------- -------- ----------------------------------------------------------------------- - ---------- Conflicting Flows: (vph) 201 Northbound Southbound Eastbound Westbound Potential Capacity: (pcph) 1201 L T R; L T R; L T R L T R Movement Capacity: (pcph) 1375 ----'--------'---- ----'---- ---- ---- Prob. of Queue -Free State: 0.98 No. Lanes 1 0 1 1 1 1 0 i 0 0 0; 0 > 0 < 0 -------------------------------------------------------- Stop/Yield ; N; N; ; Step 4: LT from Minor Street WB EB Volumes 107 741 24 398 144 10 -------------------------------------------------------- PHF ; .9 .9; .9 .9 .9 .9 Conflicting Flows: (vph) 588 Grade ; 0 ; 0 ; i 0 Potential Capacity: (pcph) 483 MC's (%) 1 I 1 I Major LT, Minor TH SU/RV's (%); Impedance Factor: 0.98 CV's (%) ; i 1 Adjusted Impedance Factor: 0.98 PCE's ;1.10 , 11.10 1.10 Capacity Adjustment Factor ---------------------------------------------------------------------- due to Impeding Movements 0.98 Movement Capacity: (pcph) -------------------------------------------------------- 472 ' Adjustment Factors Intersection Performance Summary Vehicle Critical Follow-up Avg. 95% Maneuver Gap (tg) Time (tf) Flow Move Shared Total Queue Approach ------------------------------------------------------------------ Rate Cap Cap Delay Length LOS Delay Left Turn Major Road 5.00 2.10 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) Right Turn Minor Road 5.50 2.60 '-------- ------ ------ ------ -------------- ----- --------- Through Traffic Minor Road 6.00 3.30 WB L 176 472 > Left Turn Minor Road 6.50 3.40 491 11.9 2.1 C 11.9 WB R 12 1205 > SB L 30 1375 2.7 0.0 A 0.2 Intersection Delay = 2.5 sec/veh APPENDIX B HCS: Unsignalized Intersections Release 2.1c Page 1 HCS: Unsignalized Intersections Release 2.1c Page 2 Center For Microcomputers In Transportation University of Florida Worksheet_ for Intersection 512 Weil Hall Gainesville. FL 32611-2083 -TWSC ! Step 1: RT from Minor Street WB EB Ph: (904) 392-0378 ! - --------------"-------- ---------------- --------'----------------'--------------------___-------------------- Streets: (N-S) shl (E-W) countryclub road - j Conflicting Flows: (vph) 368 Major Street Direction.... NS Potential Capacity: (pcph) 901 Length of Time Analyzed... 60 (min) Movement Capacity: (pcph) 901 Analyst ................... mid !, Prob. of Queue -Free State: 0.97 Date of Analysis.......... 8/22/96 -------------------------------------------------------- Step 2 LT from Major Street SB NB Other Information......... am (pm 1994 short long Two-way Stop -controlled Inters ei on -------------------------------------------------------- Conflicting Flows- . (vph) 439 I Northbound I Southbound ; Eastbound ; Westbound Potential Capacity: (pcph) 1059 L T R L T R L T R L T R j Movement Capacity: (pcph) 1059 ,____ ____ ---- , -__ ____ ---- , ___ ____ __-_---- ____ ____ ! Prob. of Queue -Free State: 0.98 No. Lanes ; 0 1 < 0 ; 0 > 1 0 0 0 0 ; 0 > 0 < 0 TH Saturation Flow Rate: (pcphpl) 1700 Stop/Yield N! N! RT Saturation Flow Rate: (pcphpl) Volumes -266 1271 17 149 i 83 21 Major LT Shared Lane Prob. PHF .9 .9; .9.9 .9 .9 of Queue -Free State: 0.98 Grade1 0 0 I MC's (%) i I 0 ------'-'----------------------------------------------- Step 4: LT from Minor Street WB EB SU/RV's (%)I CV's (%) ; ; ; ; -------------------------------------------------------- Conflicting Flows: (vph) 554 PCE's ; 11..10 ; :1.10 1.10 Potential Capacity: (pcph) 506 ----------------------------------------------------------------------- Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 - Capacity Adjustment Factor Adjustment Factors -,; due to Impeding Movements 0.98 Movement Capacity:-(pcph) 495 Vehicle Critical Follow -up -----------------------------------------------------"' Maneuver______________________________Gap (t9)____________---- Time Ctf) Mane____ _____ ______ Intersection Performance Summary Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Avg. 95% Through Traffic Minor Road 6.00 3.30 Flow Move Shared Total Queue Approach Left Turn Minor Road 6.50 ,3.40 - Rate Cap Cap Delay Length ,LOS Delay I Movement (pcph) (pcph) (pcph)(sec/veh) (veh) ---101--- --495---- ------ ------- ------- ----- (sec/veh) ' ----L---- WB > -544 8.6 1.0 B 6.6 WB R 25 901 > SB L 21 1059 3.5 i 0.0 A 0.4 Intersection Delay = 1.4 sec/veh HCS: Unsignalized Intersections Release 2.1c Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S),shl (E-W) country club road Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... mjd Date of Analysis........ * 22/96 Other Information....... am pm 1994 short long Two-way Stop -controlled In ersecticn Northbound Southbound ; Eastbound ; Westbound L T R; L T R; L T R L T R ---- ---- ----I---- ---- --- ---- ---- --- ---- ---- ---- No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0 Stop/Yield I N; N1 Volumes 69 601 20 271 114 8 PHF .9 .9� .9 .9 i i .9 .9 Grade 0 0 0 MC's (%) ; SU/RV's CV's (%) PCE's ; :1.10 :1.10 1.10 ----------------------------------------------------------------------- Adjustment Factors Vehicle Critical Follow-up Maneuver ----------------------------------------------------------------- Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1c Page 2 Worksheet for TWSC Intersection --------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 110 Potential Capacity: (pcph) 1218 Movement Capacity: (pcph) 1218 Prob. of Queue -Free State: 0.99 -------------------------------------------------------- Step 2: LT from Major Street -'---------------------'--'--'------------- SB-----------NB Conflicting Flows: (vph) 144 Potential Capacity: (pcph) 1464 Movement Capacity: (pcph) 1464 Prob. of Queue -Free State: 0.98 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 4: LT from Minor Street WB EB "-'---------------------------------------------------- Conflicting Flows: (vph) 434 Potential Capacity: (pcph) 594 Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: (pcph) -------------------------------------------------------- 582 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) -------- ------ ------ ------ ------- ------ (sec/veh) WB L 140 582 > ----- --------- 603 7.9 1.1, B 7.9 WB R 10 1218 > SB L 24 1464 2.5 0.0 A 0.2 Intersection Delay = 1.9 sec/veh APPENDIX A Table 1 1994 Peak Hour Operation Intersection SH1/Country Club Road (stop sign) WB LT/RT SB LT Table 2 Level of Service AM PM B B A A Short Range Peak Hour Operation Level of Service Intersection AM PM SH1/Country Club Road (stop sign) WB LT/RT C C SB LT A A SH1/Country Club Road (signal) B A Country Club Road/F.S. #12 (stop sign) NB LT/RT A A WB LT A A Table 3 Long Range Peak Hour Operation Intersection SH1/Country Club Road (signal) Country Club Road/F.S. #12 (stop sign) NB LT/RT WB LT Level of Service AM PM B B B B A A rn r-114/83 N COUNTRY CLUB ROAD rAIF "OvI 1994 PEAK HOUR TRAFFIC Figure I n N M ' -10/25 -� 151/122 COUNTRY CLUB % 144/104 fir-- NOM• ROAD y5�18 3/ � �� 03 o^ ( 0 YF-W Y< 1 WU3 I Site E�� I AM / PM io-.V ~c la < — — — — — — — .. SHORT RANGE PEAK HOUR TRAFFIC Figure 2 N� N -16/38 235/197 COUNTRY CLUB f— 222/161 r— NOM. ROAD j 149/286 —� � # — nz ---- "--% I 20W Site g�� g�W AM / PM U > n. 4 m LONG RANGE PEAK HOUR TRAFFIC Figure 3 Table 3 shows the peak hour operation at the key intersections in the long range future. It is assumed that the SH1/County Club Road intersection will be signalized. Calculation forms are provided in Appendix C. It is expected that the peak hour operation will be acceptable. Conclusion Implementation of Fire Station #12 will have a minimal impact on the area streets and intersections. Operation during the peak hours will be acceptable. A signal will be warranted at the SH1/Country Club Road intersection based upon background traffic volumes. The location of the fire station can be used to accelerate the installation of that signal. An emergency flasher with stop bars are recommended on Country Club Road to keep the fire station driveway area free of vehicles during an emergency situation. The auxiliary turn lanes on SH1 are needed with the current traffic and are not caused by the implementation of Fire Station #12. development pattern in the Fort Collins area, it is assumed that peak hour trips will enter and leave via the SH1/Country Club Road intersection. —The site plan for the Fire Station #p12 site shows two accesses to Country Club Road. The easternmost is a wide driveway curb cut for the emergency vehicles themselves. This driveway will not be used on a regular, predictable basis. The westernmost driveway accesses the parking lot. This access will be used by employees and visitors. There is provision for 19 parked vehicles. Country Club Road increases in grade from SH1 to the east. The grade is most severe for approximately 200-300 feet east of SH1. The grade moderates just east of the site. There is a crest vertical curve east of Ford Lane. A site visit indicated sight lines and distance were adequate to the east from both driveways for the existing 30 mph posted speed on Country Club Road. However, due to the vertical curve just east of Ford Lane, cons iderati on show be given to installing a flashing emergency signal to alert westbound motor s s t- Eh s a re station ahead. The suggested sign would I entif y that the fire station exists and that vehicles should STOP WHEN FLASHING. The location should be just east of Ford Lane. It should be a oca a ater in the design/approval process. Stop bars, which identify where vehicles should stop under an emergency situation, should be painted on Country Club Road Figures 2 and 3 show the respective short and long range traffic forecasts at the key intersections. Based upon the Figure 2 traffic forecasts, the peak hour signal warrant is near the threshold of being met. Based upon the Figure 3 traffic forecasts, the peak hour signal warrant will be met. In the long range future, the warrants are met based upon background traff ic rather than caused by the occupancy and use of Fire station 2. As mentioned earlier, fire stations have a very low trip generation rate and therefore, have a low impact on the area streets on a predictable basis. Given that the Figure 2 forecasts indicate that a signal is on the threshold of being warranted and a fire station is proposed in the immediate area, the Manual on Uniform Traffic Control Devices, USDOT, 1988, Section 4E-18 does provide for installation of a traffic signal at a location that does not meet the warrants. In my judgment, this section of the Manual can be used as justification to accelerate the need for a signal at the SH1/Country Club Road intersection. Obviously, t e nee or -the signal itself is due to background traffic. Table 2 shows the peak hour operation at the key intersections in the short range future. Both stop sign and signal control are considered at the SH1/Country Club Road intersection. Calculation forms.are provided in Appendix B. Operation is expected to be acceptable in the peak hours. 00 M o 00 CV) 0 o o � a CD o O o U 0 J CD w C) ] N Q CY) 0 CD Z CD j O a n = rn w ,W z V 0 N CL N N W a z Tw W i z Vz z W W o 0 a U) z a W ots M. LL a Q ~ MEMORANDUM TO: Gene Chantler, Poudre Fire Authority Mick Aller, Aller • Lingle Fort Collins Planning Department Eric Bracke, Fort Collins Traffic Engineer FROM: Matt Delich DATE: August 26, 1996 SUBJECT: Poudre Fire Authority Station #12 traffic study (File: 9658MEM1) This memorandum addresses the traffic related impacts of locating Fire Station #12 in the southeast quadrant of the SH1/Country Club Road intersection in Fort Collins. The scope of this study was discussed with Fort Collins Transportation Department staff. Based upon current plans, Fire Station #12 is expected to be operational by,1998. This analysis used counts and forecasts contained in the "Traffic Impact Study, Falcon Ridge," March 25, 1994. The traffic forecasts on SH1 were adjusted to reflect proposed developments such as Terry Shores, Eagle Lake, and Hearthfire. Figure 1 shows the 1994 peak hour traffic at the SH1/Country Club Road intersection. Table 1 shows the peak hour operation at this intersection with the existing stop sign control. Calculation forms are provided in Appendix A. Operation at this intersection is acceptable. Acceptable operation is defined as level of service D or better. Based upon Warrant 11, Peak Hour Volume, signals are not warranted at this intersection. The warrant evaluated was for a major street with a speed above 40 mph. The posted speed on SH1 is 45 mph. The current geometry on all legs of this intersection is one approach lane in each direction. There are wide shoulders on SH1 (8+ feet). As reported in the cited study, a northbound right -turn lane and a southbound left -turn lane are required based upon the State Highway Access Code (SHAC). These lanes are required whether or not Fire Station #12 or other development occurs in this area. Fire Station #12 will house a number of fire trucks and related emergency vehicles. There will be three full-time firemen on site at all times. They are on 24 hour shifts beginning at 7:30 AM+. There are occasionally visits by other fire personnel, but these are random during the daylight hours. From a trip generation standpoint, it is estimated that there will be 3 vehicle trips in and out in the morning peak hour and 2 vehicle trips in and out in the afternoon peak hour. Daily vehicle trip ends will normally be less than 30. Based upon the street network in the area and the general